DIAL YOUR COLLECTOR REPORTS – 06/2007 to 12/2008
|
|||
|
DATE & ID
NO. |
CALLER NAME
& ADDRESS |
GRIEVANCE |
REPLY |
|
18/06/2007 2431. ========== |
GOPAL DEGAMPUR
(V) BICHKUNDA
(M) |
A CHECK DAM WAS CONSTRUCTED IN THE VILLAGE BUT THE
SIDES WERE NOT FILED WITH GRAVEL AS PER SPECIFICATION - DUE TO THIS LAST YEAR
CROPS IN THE ADJOINING FIELDS WERE HEAVILY DAMAGED - THE MATTER WAS
REPRESENTED TO THE M.P.D.O. TIME AND AGAIN BUT THERE IS NO RESPONSE - IT WAS
ALSO BROUGHT TO THE NOTICE OF THE DIST. COLLECTOR BUT STILL THE WORK IS NOT
ATTENDED. SINCE, RAINY SEASON HAD ALREADY COMMENCED THE WORK IS NOT COMPLETED
ON PRIORITY BASIS WE HAVE TO LOOSE OUR CROPS THIS YEAR ALSO. THEREFORE, EARLY
ACTION IS REQUESTED. |
TH P.D.(DWMA) HAD REPORTED THAT CHECK DAM WAS
CONSTRUCTED UNDER R.S.V.Y. SCHEME BY SPENDING Rs.2.00 LAKHS. DUE O LACK F
FUNDS UNDER THIS PROGRAMME SMALL PORTION OF WORK IS LEFT UNCOMPLETED AND ALSO
THE SIDE BUNDS WERE NOT TAKEN UP WITH SAND AND GRAVEL. THE BALANCE WORK COULD
BE TAKEN UP UNDER N.R.E.G.S. PROGRAMME. ACCORDINGLY, THE M.P.D.O., BICHKUNDA WAS
INSTRUCTED TO TAKE UP THIS WORK UNDER N.R.E.G.S. IMMEDIATELY BY OBTAINING
APPROVAL FROM THE P.D.(DWMA). |
|
18/06/2007 2432. |
NOOKA
RAJANNA PALDA
(V) NIZAMABAD
(M) |
SARANGAPOOR SUGAR FACTORY HAD SUPPLIED SEED ON
SUBSIDY - SINCE THE QUALITY WAS POOR THE SAME WAS RETURN TO THE FACTORY -
HOWEVER, WHILE PAYMENT OF BILL Rs.1200/- INCLUDING INTEREST WAS DEDUCTED - I
HAVE REPRESENTED 2 TO 3 TIMES IN THIS REGARD BUT NO ENQUIRY IS DONE AND
ACTION TAKEN TO REFUND THE AMOUNT - EARLY REFUND IS REQUESTED. |
THE M.D.(NCSF) HAD REPORTED THAT THEY HAVE
REFUNDED Rs.252/- TOWARDS THE COST OF 1.5 Kgs OF ATRATAF (WEEDECIDES).
FURTHER, THEY HAVE ALSO SUPPLIED RALLIS TATA MAKE POST EMERGENCE WEEDECIDE
i.e. TATA METRI 1 Kg. WORTH Rs.1600/- IN PLACE OF 4.5 Kgs. ATRATAF REQUESTED
BY SRI M.RAJANNA. THUS, THE GRIEVANCE HAS BEEN REDRESSED. |
|
18/06/2007 2433. |
MADHAPUR
(V) MAKLOOR
(M) |
IN MADHAPUR VILLAGE SOME CHRISTIANS HAVE INSTALLED
CROSS ON THE HILLOCK UNAUTHORISEDLY - THEY HAVE ALSO TAKEN AN ILLEGAL POWER
CONNECTION AND PERFORMING PRAYERS FROM EARLY MORNING - OTHER COMMUNITY WOMEN
WHO GO TO THE MOUNTAIN IN THE EARLY HOURS FOR ATTENDING NATURES CALL ARE
FACING LOT OF PROBLEMS - KINDLY STOP THIS ILLEGAL ACTIVITY. |
THE D.D. (SW) HAD REPORTED THAT HE ALONGWITH
M.R.O., MAKLOOR INSPECTED THIS SITE IN SY.NO. 939 WITH TOTAL EXTENT OF 248.14
ACRES OUT THIS LAND 51.00 ACRES WAS ASSIGNED TO ELIGIBLE PERSONS AND THE
REMAINING 197.14 ACRES IS COVERED BY HIGH HILLOCK. A CROSS WAS INSTALLED ON
THE TOP OF THE HILL BY SOME S.Cs. AND EVERY SUNDAY THEY ARE PERFORMING
PRAYERS. ONLY ON THE EVE OF FESTIVAL CURRENT IS BEING USED AS STATED BY
KUNDELU GANGARAM, S.C.-MADIGA. THE CALLER WAS NOT PRESENT AND HIS WIFE HAD
STATED THAT THEY ARE FEELING INCONVENIENCE TO ATTEND CALL OF NATURE IN THE
MORNING. THERE ARE 50 FAMILIES OF WHICH 25 FAMILIES ARE ATTENDING SUNDAY
SERVICE. THE FAMILIES WERE INSTRUCTED TO AVAIL GOVT. SCHEME FOR CONSTRUCTION
OF ISLs SINCE GOING OUT SIDE FOR DISCHARGE OF NIGHT SOIL IS PROHIBITED. THE M.P.D.O. WAS INSTRUCTED TO SANCTION ISLs TO ALL
THE 50 FAMILIES IF THEY HAVE NOT AVAILED ALREADY. THE M.R.O. WAS ALSO
INSTRUCTED TO TAKE NECESSARY ACTION FOR INSTALLING CROSS AND OFFERING PRAYERS
IN GOVT. LAND WITHOUT PERMISSION. THE S.E.(NPDCL) HAD REPORTED THAT THEY HAVE FOUND
WIRE FOR DRAWING POWER SUPPLY, BUT AT THE TIME OF INSPECTION NO POWER SUPPLY
IS BEING DRAWN. HOWEVER, THEY KEPT A WATCH TO ARREST ILLEGAL DRAW OF POWER. |
|
18/06/2007 2434. |
VITTAL
GOUD CPM
LEADER KOTAGIR
(V) KOTGIR
(M) |
IN KOTGIR MANDAL ONE SRI GANGADHAR GOUD MUSTHEDAR
IS SELLING ADULTERATED TODDY - HE IS MIXING CHLOROHYDRATE, GANJA ETC. IN THE
TODDY AND CAUSING HEALTH PROBLEMS TO THE CONSUMERS - THE MATTER WAS BROUGHT
TO THE NOTICE OF EXCISE OFFICIALS SEVERAL TIMES BUT NO ACTION IS TAKEN TO
ARREST SALE OF ADULTERATED TODDY - SIMILARLY TODDY IS BEING SOLD ON THE ROAD
SIDE AT KAMCHETTYPALLY AND NASRULLABAD WHICH ARE UNAUTHORISED AND UN-NOTIFIED
PLACES FOR SALE OF TODDY - THIS IS LEADING TO ACCIDENTS AND RECENTLY ONE
PERSON HAD DIED IN AN ACCIDENT - KINDLY INSTRUCT THE EXCISE DEPARTMENT
OFFICIALS TO SHIFT THE SHOPS IN TO THE VILLAGE BOUNDARY. |
THE E.S., NIZAMABAD HAD REPORTED THAT THE MATTER
WAS GOT ENQUIRED AND INSPECTED IN ALL NINE SHOPS BY THE TASK FORCE TEAM AND
S.H.O., BODHAN. THE TODDY THAT WAS BEING SOLD WAS FOUND NOT ADULTERATED.
HOWEVER, SAMPLES WERE DRAWN FOR TEST. FURTHER SRI VITTAL GOUD STATED TO HAVE
CALLED AND FILED THE COMPLAINT STATED THAT HE DID NOT FILED ANY SUCH
COMPLAINT. SOME PERSON BY USING HIS NAME APPEARS TO HAVE MADE THIS CALL ON
18.06.07. HOWEVER, THEY HAVE KEPT A STRICT VIGIL ON THE SHOPS IN KOTAGIRI
MANDAL TO AVOID SALE OF ADULTERATED TODDY. THE E.S., KAMAREDDY HAD REPORTED THAT HE ORGANISED
SURPRISE CHECKS AT KAMSHETTYPALLY AND NASRULLABAD ROAD SIDE AS THEY FALL
UNDER HIS JURISDICTION AND FOUND THAT NO SUCH SHOPS WERE FOUND FUNCTIONING ON
THE ROAD SIDE. THEY HAVE ALSO SURPRISED THE VILLAGES AND FOUND THAT THE SHOPS
WERE FUNCTIONING AT LICENCE PLACE ONLY. THERE IS NO TRUTH IN THE COMPLAINT
FILED. |
|
02/07/2007 2435. |
PULI
SAILOO CHINDU
ARTIST NANDIPET
(V) NANDIPET
(M) |
THE CHINDU ARTISTS OF NANDIPET MANDAL ARE WITHOUT
HOUSE PLOTS AND HOUSES - ON OUR REPRESENTATION THE TAHSILDAR HAD STATED THAT
HOUSE SITE WERE ALLOTTED TO 29 MEMBERS OF OUR COMMUNITY UNDER INTIMATION TO
COLLECTOR - BUT SO FAR PHYSICAL POSSESSION IS NOT HANDED OVER TO THE
ALLOTEES - KINDLY ARRANGE IMMEDIATE
HANDING OVER OF POSSESSION AND ARRANGE CONSTRUCTION OF HOUSES. SIMILARLY, LAND WAS ASSIGNED TO OUR MEMBERS IN
SY.NO.189, LAKMAPALLI VILLAGE AND PATTA CERTIFICATE ISSUED - WE WENT TO THE
SPOT FOR SOWING MAIZE BUT THE VILLAGERS ARE OBSTRUCTING STATING THAT THIS
LAND WAS ASSIGNED TO THEM - KINDLY GET THE LAND SURVEYED AND SETTLE THE
PROBLEM SO AS TO ENABLE US TO TAKE UP CULTIVATION. |
THE MRO, NANDIPET HAD REPORTED THAT SRI PULI SAILU
CHINDU ARTIST R/o NANDIPET HAD REPRESENTED THAT 29 MEMBERS OF ARTIST
COMMUNITY AND SONS OF JOGINS IN VARIOUS VILLAGES OF NANDIPET MANDAL. HE WAS
INFORMED TO FILE APPLICATIONS DURING 2ND PHASE OF INDIRAMMA HOUSING PROGRAMME
FOR CONSIDERING SANCTION IN THE RESPECTIVE VILLAGES. REGARDING ASSIGNMENT OF LAND IN SY.NO.189 OF
LAKKAMPALLY VILLAGE THE M.R.O. HAD SUBMITTED THAT AN EXTENT OF 200.14 ACRES
WAS ASSIGNED AND SUB-DIVISION COMPLETED, P.P.B. & T.D. WAS ALREADY
ISSUED. AN EXTENT OF 2.20 ACRES IN SY.NO.189/16 WAS ALLOTTED TO SRI NARSIMLOO
IN THE YEAR 1979 AND AFTER HIS DEATH FELL TO THE SHARE OF SRI PULI NABUDRI
PRASAD WHO IS PRESIDENT OF CHINDU ARTISTS. HE DURING LAST YEAR, INSTEAD OF
CULTIVATION HIS LAND HE TRIED TO CULTIVATE ADJACENT LAND IN SY.NO.432/17.
BOTH THE PERSONS WERE CALLED TO THE SPOT ALONG WITH VILLAGE ELDERS AND SPOT
DISPUTE RESOLVED AND BOTH THE PARTIES WERE BIND OVER TO MAINTAIN THEIR OWN
LANDS. IN VIEW OF THE ABOVE THE REDRESS HAS BEEN SOLVED AND PARTIES INFORMED.
|
|
02/07/2007 2436. |
NARESH VAILPOOR
(V) VAILPOOR
(M) |
VENKATESHWARA THEATRE IN ARMOOR IS COLLECTING
Rs.10/- OVER AND ABOVE THE RATE PRINTED ON THE TICKETS - THE MANAGEMENT HAVE
ALSO DISPLAYED A BOARD STATING THAT THEY ARE COLLECTING EXTRA AMOUNT AS PER
THE PERMISSION GRANTED BY THE DIST. COLLECTOR - EXTRA AMOUNT CAN BE COLLECTED
AS PER THE PERMISSION FROM THE COMPETENT AUTHORITY FOR NEW PICTURES ONLY -
WHEREAS, THIS MANAGEMENT IS COLLECTING EXTRA AMOUNT EVEN FOR THE OLD PICTURES
- THEY ARE ALSO NOT MENTIONING COLLECTORS PERMISSION LETTER NO. AND DATE -
KINDLY ENQUIRe AND TAKE NECESSARY ACTION. |
THE M.R.O., ARMOOR HAD REPORTED THAT HE HAS
INSPECTED THE CINEMA TALKIES AND ON ENQUIRY REVEALED THAT ENHANCED PRICES ARE
BEING COLLECTED ONLY FOR NEW PICTURES WITH THE PERMISSION FROM THE
COLLECTORATE. NO ENHANCED AMOUNTS ARE BEING COLLECTED FOR THE OLD PICTURES
EXHIBITED. THE CALLER COULD NOT BE IDENTIFIED AS HE HAD CALL FROM A PUBLIC
BOOTH COIN BOX TELEPHONE. THERE IS NO TRUTH IN THE GRIEVANCE FILED. |
|
02/07/2007 2437. |
BANGARU
SAILU DURKI
(V) BANSWADA
(M) |
IN NIZAMABAD PROPER ALL THE WINE SHOPS AT
KANTESHWAR, KHALEELWADI AND INDUR WINES, NIZAMABAD ARE SELLING LIQUOR AND BEER AT HIGHER RATES ON M.R.P. ON
QUESTIONING THEY ARE STATING TO COMPLAIN TO ANY BODY THEY ARE NOT WORRIED -
COMMON MAN IS FORCED TO PAY EXTRA AMOUNT - EXCISE OFFICIALS ARE NOT TAKING
ANY ACTION TO CURB THIS ILLEGAL PRACTICE - ALL THE SHOP OWNERS HAVE FARMED
INTO SYNDICATE AND INDULGING IN THIS ILLEGAL ACTIVITY - KINDLY ARRANGE
SURPRISE INSPECTION OF SHOPS AND TAKE NECESSARY ACTION IN THIS REGARD. |
THE SUPDT. (P&E), NIZAMABAD HAD REPORTED THAT
THE EXCISE OFFICIALS HAVE SURPRISED M/s INDUR WINES, KHALEEL WADI, NIZAMABAD
AND NOTICE THAT SPL. APOTMENT WHISKY OF 180 M.L. BOTTLE WAS SOLD TO A COMMON
MAN Rs.43 AS AGAINST THE GOVT. FIXED GOVT. RATE OF Rs.41/- A CASE IN CR.NO.
356/07-08 WAS BOOKED ON 03.07.2007 AND FOLLOW UP ACTION IS BEING TAKEN UP. SIMILARLY, KANTESHWAR WINES WAS INSPECTED AND
FOUND THAT THEY ARE SELLING AS PER THE RATE FIXED BY THE GOVT. BUT, THEY
FAILED TO PRODUCE ACCOUNTS REGISTER, RECEIPT BOOKS AND NAUKAR NAMA. AS SUCH A
CASE IN CR.NO.355/07, DATED 03.07.2007 U/s 31(1)(B) AND FOLLOW UP ACTION IS
BEING TAKEN. INSTRUCTIONS WERE ISSUED ALL S.H.Os. TO SURPRISE
WINE SHOPS REGULARLY AND ARREST SALE OF LIQUOR AT HIGHER RATES. |
|
02/07/2007 2438. |
BABANNA NOOTHPALLY
(V) NANDIPET
(M) |
THERE IS GRAVEL ROAD CONNECTING DONKESHWAR TO
NOOTHPALLI IN NANDIPET MANDAL - LAYING OF B.T. ROAD IS SANCTIONED AND THE
CONTRACTOR HAD DUMPED STONE MATERIAL ETC. ON THE ROAD BUT FOR THE PAST 3 - 4
MONTHS NO ACTION IS TAKEN FOR LAYING B.T. ROAD - BECAUSE OF THIS THE
COMMUTERS ARE FACING LOT OF PROBLEM DUE TO POOR CONDITION OF THE ROAD AND
DUMPING OF STONE METAL ON EITHER SIDES OF THE ROAD - KINDLY INSTRUCT THE
CONCERNED TO COMPLETE LAYING OF B.T. ROAD ON PRIORITY BASIS AND SOLVE THE
PROBLEM OF ROAD USERS. |
THE COMPLAINT WAS REFERRED TO EE(PR), NIZAMABAD
DIVISION DEPT. HOWEVER, THE EE(PR) HAVE INFORMED THAT THIS ROAD WAS TAKEN UP
BY EE(SRSP) DIVISION-II, POCHAMPAD AND REFERRED THE MATTER TO EE(SRSP) UNDER
INTIMATION TO THIS OFFICE. REPLY FROM E.E.(SRSP) AWAITED. THE E.E.(SRSP), DIV.NO.2, HAD REPORTED THAT THE
CONSTRUCTION OF W.B.M. ROAD FROM DONKESHWAR X ROAD TO NOOTHPALLY WAS STARTED
ON 10.07.2007 AND THE WORK IS IN PROGRESS. |
|
02/07/2007 2439. |
SRINIVAS PITLAM
(V) PITLAM
(M) |
IN VARNI ROAD OF NIZAMABAD TOWN THE TANK WATER IS
STAGNATED IN THE COLONIES CAUSING HEALTH PROBLEMS AS THE PLACE HAS BECOME
BREEDING DEN FOR MOSQUITOES AND SHELTER FOR PIGS - KINDLY INSTRUCT THE
COMMISSIONER MUNICIPAL CORPORATION TO TAKE UP DRAINAGE WORK TO CLEAR THE
STAGNATED WATER. |
THE COMMISSIONER, M.C., NIZAMABAD HAD REPORTED
THAT THE KUTCHA DRAIN HAS BEEN CLEANED TO ENSURE FREE FLOW OF DRAIN WATER. A
PHOTOGRAPH IS ALSO ENCLOSED. THE GRIEVANCE HAS BEEN REDRESSED. |
|
02/07/2007 2440. |
KONE
GANGADHAR EX-WARD
MEMBER LINGAPUR
(V) NAVIPET
(M) |
THE G.P. BY PASSING A RESOLUTION IS FELLING
HEALTHY AND VALUABLE TREES EXISTING ON THE LINGAPUR CHERUVU TANK BUND - THESE TREES ARE NOT OBSTRUCTING EITHER
FLOW OF WATER OR COMING IN THE WAY OF USAGE OF TANK BUND - THE TREES ARE
BEING FELLED ILLEGALLY FOR SELLING TIMBER IN THE MARKET - SO FAR THEY HAVE
FELL DOWN 20 TO 30 TREES - I HAVE BROUGHT THIS TO THE NOTICE OF THE A.E.,
NAVIPET BUT THERE IS NO RESPONSE FROM HIM - KINDLY BRING IT TO THE NOTICE OF
THE OFFICIALS AT DISTRICT LEVEL AND STOP THIS ILLEGAL ACTIVITY. |
THE E.E.(IB), NIZAMABAD HAD REPORTED THAT THE G.P.
LINGAPUR HAD RESOLVED TO AUCTION THE DRIED TREES ON THE TANK BUND AND
ACCORDINGLY AUCTIONED DRIED TREES FOR Rs.12,000/- AND RECEIVED Rs.6,000/- SO
FAR AND THE SAME WAS REMITTED TO G.P. ACCOUNT. THIS WAS DONE WITHOUT NOTICE
TO EITHER IRRIGATION DEPT. OR W.U.A. MEMBERS. THE COPY OF MINUTES REVEALED THAT A RESOLUTION WAS
PASSED TO AUCTION TREES ON THE TANK BUND
. IT WAS NOT SPECIALLY MENTIONED AS TO GATHER DRIED TREES OR ALL
TREES. HOWEVER, THE SARPANCH WAS INSTRUCTED TO REMIT
AUCTION PROCEEDINGS OF Rs.12000/- TO W.U.A. ACCOUNT IMMEDIATELY AS PER
FARMERS ORGANISATION ACT 1977. |
|
02/07/2007 2441. |
GANGADHAR NANDIPET
(V) NANDIPET
(M) |
THE P.S.G.P. OF NANDIPET VILLAGE AND MANDAL IS NOT
ATTENDING TO DUTIES FOR THE PAST 15 DAYS - NO ONE IS THERE TO LOOK AFTER
CLEANING OF DRAINS AND SANITATION WORK - DUE TO RECENT RAINS THE DRAINS HAVE
OVER FLOWED AND ALL THE MUDDY WATER STAGNATED ON THE ROADS CAUSING HEALTH
PROBLEMS - KINDLY INSTRUCT THE CONCERNED TO ENSURE CLEANLINESS AND HYGIENIC
CONDITIONS IN MANDAL HEADQUARTERS VILLAGE TO AVOID BREAK OF EPIDEMICS. |
THE D.P.O. HAD REPORTED THAT THE P.S.G.P.,
NANDIPET HAD PROCEEDED ON LEAVE AND AS SUCH P.S.G.P., NAVIPET WAS KEPT
INCHARGE. THE SARPANCH AND JR. ASST. WERE INSTRUCTED TO ENSURE SUPPLY OF SAFE
DRINKING WATER AND ENSURE CLEANLINESS IN THE ABSENCE OF REGULAR P.S.G.P. |
|
02/07/2007 2442. |
MUTHYAM BINOLA
(V) NAVIPET
(M) |
DUE TO SUDDEN GALE AND RAIN ELECTRIC WIRES WERE
CUT OF AND FELL ON MY CATTLE SHED IN KADIRABAD AREA OF BINOLA VILLAGE
RESULTING DEATH OF 3 COWS ON 20/6/07 - BUT SO FAR THE POWER LINE IS NOT
RECTIFIED AND COMPENSATION PAID FOR THE LOSS CAUSED TO ME - KINDLY ARRANGE
IMMEDIATE RECTIFICATION OF POWER SUPPLY LINE AND ARRANGE PAYMENT OF
COMPENSATION FOR THE LOSS OF THREE COWS. |
THE S.E.(NPDCL), NZB. HAD REPORTED THAT THE POWER
LINE HAS BEEN RECTIFIED. THE PAYMENT OF COMPENSATION FOR THE LOSS OF THREE
COWS IS UNDER PROCESS AND THE SAME WOULD BE SETTLED AS SOON AS CERTIFICATE OF
VETERINARY DOCTOR IS RECEIVED. |
|
02/07/2007 2443. |
NARSIMLOO ELCHIPUR
(V) KAMAREDDY
(M) |
SIX MONTHS BACK ROAD WAS LAID FROM KAMAREDDY TO
ELCHIPUR VILLAGE BY SPENDING Rs. 8.00 LAKHS - DUE TO POOR QUALITY OF WORK THE
ENTIRE GRAVEL IS WASHED OUT AND STONE METAL IS APPEARING - THE MATTER WAS
BROUGHT TO THE NOTICE OF THE OFFICIALS IN PRAJAPATHAM AND REPRESENTATION BUT
NO ACTION IS TAKEN TO RECTIFY THE DEFECT - KINDLY INSTRUCT THE CONCERNED TO
LAY GRAVEL SO AS TO ENABLE USAGE OF ROAD BY ONE AND ALL. SIMILARLY, THERE ARE NO STREET LIGHTS IN THE
VILLAGE FOR THE PAST 20 DAYS - SARPANCH AND P.S.G.P. ARE NOT TAKING ANY
ACTION TO RESTORE STREET LIGHTS, THOUGH THERE ARE FUNDS - KINDLY INSTRUCT THE
CONCERNED TO ARRANGE STREET LIGHTS IMMEDIATELY. |
THE EE(PR), KAMAREDDY HAD REPORTED THAT THIS WORK
WAS SANCTIONED UNDER F.A.P. DURING THE YEAR 2005-06 WITH AN ESTIMATED COST OF
Rs.8.00 LAKHS. THE WORK WAS COMPLETED DURING SEPTEMBER LAST YEAR. DUE TO
MOVEMENT OF MORE NUMBER OF HEAVY VEHICLES, AS THE BYPASS ROAD IS UNDER
CONSTRUCTION, THE BLINDAGE GRAVEL OF THIS ROAD IS DISTURB FOR A SHORT LENGTH.
THE WORK WOULD BE RECTIFIED BY PROVIDING GRAVEL BLINDAGE FOR SMOOTH PASSAGE
OF TRAFFIC WITH IN A WEEKS TIME. THE D.P.O., NIZAMABAD AND M.P.D.O., KAMAREDDY HAVE
REPORTED THAT THE STREET LIGHTS WHICH WERE NOT FUNCTIONING HAVE BEEN REPLACED
ON 04.07.2007. |
|
02/07/2007 2444. |
KATHALA
SHANKARAIAH LAXMIDEVNIPALLI
(V) BHIKNOOR
(M) |
FUNDS ARE RECEIVED TO THE VILLAGE FOR TAKING UP
CLEANLINESS PROGRAMME AND MAINTAINING HYGIENIC CONDITIONS - BUT THE SARPANCH HAS NOT TAKEN UP ANY
WORK IN S.C. COLONY ON QUESTIONING HE IS STATING THAT THE FUNDS ARE OVER AND
WOULD TAKE UP IF FURTHER FUNDS ARE RECEIVED. THE S.C. COLONY IS NOT GETTING
DRINKING WATER FOR THE PAST 20 DAYS THE SARPANCH IS STATING THAT THERE ARE NO
FUNDS TO REPAIR THE MOTOR - THE SARPANCH HAS ALSO NOT TAKEN UP ANY DRAINAGE
WORK IN S.C. COLONY - RESULTING STAGNATION OF DRAIN WATER, GROWING OF
UNWANTED WEEDS IN THE STAGNATED WATER RESULTING MOSQUITO PROBLEM AND HEALTH
PROBLEM - KINDLY ENQUIRE AND DO JUSTICE TO S.C. COLONY. |
THE D.P.O. HAD REPORTED THAT THE M.P.D.O.,
BHIKNOOR HAD ENQUIRED INTO THE MATTER AND SUBMITTED REPORT STATING THAT THE
MOTOR WAS FAILED AND SENT FOR REPAIRS. TO ENSURE SUPPLY OF DRINKING WATER A
SINGLE PHASE WATER WAS INSTALLED ON 05.07.2007 AND WATER IS BEING SUPPLY TO THE COLONY. OIL BALLS WERE KEPT IN THE STAGNATED WATER
TO AVOID GROWTH OF MOSQUITOES. INSTRUCTIONS WERE ALSO ISSUED TO SUPPLY
CHLORINATED WATER FOR SAFETY OF PUBLIC. |
|
02/07/2007 2445. |
NARSAIAH GOLLAPALLI
(V) DICHPALLI
(M) |
IN OUR VILLAGE BEHIND SRI CHAKRA RICE MILL SOME
PERSONS ARE ILLEGALLY MINING GRAVEL CREATING DEEP PITS IN THIS PIT ONE CALF
ACCIDENTALLY FELL AND DIED - THE MATER WAS BROUGHT TO THE NOTICE OF THE
TAHSILDAR, DICHPALLY WHO INSPECTED SPOT WITH STAFF SIZED THE VEHICLES IN THE
MORNING AND LATER RELEASED IN THE AFTERNOON - THE WORK IS GOING ON AGAIN
UNINTERRUPTED - CAUSING LOT OF PROBLEMS TO THE VILLAGERS AND VILLAGE CATTLE -
KINDLY ENQUIRE INTO THE MATTER AND STOP THIS ILLEGAL ACTIVITIES |
THE R.D.O., NIZAMABAD HAD REPORTED THAT ONE SRI
PRAVEEN, CONTRACTOR BY PROFESSION IS LIFTING GRAVEL FROM KUNTA WHICH IS A
GOVT. LAND WITH THE HELP OF J.C.B. AND TRANSPORTING BY ENGAGING TRACTORS. THE
WORK HAS BEEN STOPPED IMMEDIATELY AND THE TAHSILDAR, DICHPALLY WAS INSTRUCTED
TO TAKE NECESSARY ACTION CONTRACTOR AS PER RULES AND REPORT COMPLIANCE. |
|
02/07/2007 2446. |
BANDI
NAGABUSHNAM BHIKNOOR
(V) BHIKNOOR
(M) |
MY GRAND FATHER WAS ASSIGNED 04.00 ACRES OF GOVT.
LAND FOR LIVELIHOOD - HE ENJOYED THE LAND BY CULTIVATING DURING HIS LIFE TIME
AFTER HIS DEATH MY FATHER ENJOYED THE LAND - NOW, MY FATHER IS ALSO NO MORE I
AM ENJOYING THE LAND - RECENTLY ONE SRI KUTA RAMI REDDY S/o RAMI REDDY IS
FORCIBLY OCCUPAING MY LAND STATING THAT HE HAS PURCHASED THE LAND FROM ONE
SRI PANDARI - IN THIS REGARD I HAVE FILED APPLICATION BEFORE THE M.R.O.,
BHIKNOOR, R.D.O, KAMAREDDY AND COLLECTOR ON 12TH JUNE - BUT SO FAR NO ACTION
IS TAKEN - KINDLY DO JUSTICE. |
THE TAHSILDAR, BHIKNOOR AN EXTENT OF 4.06 ½ ACRES
WAS ASSIGNED TO BANDI MALLAIAH LONG BACK AND AFTER HIS DEATH THE LANDS WERE
TRANSFERRED IN THE NAME OF BANDI NAGULU S/o MALLAIAH IN SY.NO.1116. THE LANDS
WERE KEPT FALLOW FOR LONG TIME AND THORNY BUSHES HAVE GROWN. ONE SRI RAMI
REDDY S/o RAMI REDDY HAD DEVELOPED THE LAND TO AN EXTENT OF 01.00 ACRE HENCE
THIS COMPLAINT. A NOTICE IN FORM-II UNDER RULE 3 FOR APAL (PT) RULES, 2007
WAS ISSUED TO KUNTA RAMI REDDY AND FURTHER, ACTION WOULD BE TAKEN ON RECEIPT
OF REPLY. |
|
16/07/2007 2447. |
BANSWADA
(V) BANSWADA
(M) |
WE HAVE PURCHASED TWO SOLAR LAMPS FROM ADITYA
SOLAR SHOP THROUGH NEDCAP - THE LAMPS FAILED TO FUNCTION WITHIN TWO MONTHS -
WE HAVE RETURNED THE LAMPS TO THE SHOP THROUGH NEDCAP - EVEN AFTER LAPS OF
TWO YEARS NEITHER LAMPS ARE REPLACED NOR REPAIRED AND RETURNED - THE SHOP IS
REPORTED TO BE CLOSED - NEDCAP OFFICIALS ARE NOT TAKING ANY ACTION IN THIS
REGARD DESPITE SEVERAL APPROACHES - KINDLY ARRANGE TO REPLACE THE LAMPS AS
EARLY AS POSSIBLE. |
THE D.M. NEDCAP, HAD REPORTED THAT THE CALLER HAD
CALL FROM NIZAMABAD TOWN BUT STATED THAT IS CALLING FROM BANSWADA - THE CELL
PHONE BELONGS TO ONE SRI P.MAHESHWAR A PRIVATE SOLAR LAMP REPAIRER UNDER THE
NAME "FREE ENERGY SOLAR SYSTEMS" HE IS OPERATING FROM H.NO.6-12-20
BEHIND MAHARASTRA BANK, NAMDEVWADA, NIZAMABAD - NO SOLAR LAMPS WERE SOLD FROM
NEDCAP SINCE 2004 DUE TO WITHDRAWAL OF SUBSIDY BY GOVT. - ADITYA SOLAR SHOP
WHICH WAS OPENED ON 26.08.2004 IS CLOSED SINCE OCTOBER 2006 - THE CALLER WITH
MALAFIDE INTENSION TO DEFAME NEDCAP FILED A FALLS COMPLAINT. |
|
16/07/2007 2448. |
WAJIDNAGAR
(V) BICHKUNDA
(M) |
IN WAJIDNAGAR VILLAGE OF BICHKUNDA MANDAL LABOUR
COMPONENT UNDER NREGS IS NOT BEING PAID PROPERLY - ONE PERSON BY NAME SRI
VEERAIAH WHO IS OPERATING AS BROKER HAD DRAWN THE AMOUNT OF LABOUR FOR 15
DAYS AND SWALLOWED - KINDLY RECOVER THE AMOUNT AND ARRANGE PAYMENT TO THE
LABOUR. |
THE P.D. (DWMA) HAD REPORTED THAT THE MATTER WAS
GOT ENQUIRED IN THE VILLAGE IN THE PRESENCE OF LABOUR, SARPANCH, TECHNICAL
ASSISTANT AND POST MASTER - THE LABOUR HAD REPORTED THAT NO ONE HAD
COMPLAINED ABOUT NON-PAYMENT OF WAGES - THEY ARE GETTING PAYMENTS REGULARLY
THROUGH POST MAN ONLY - ONE LABOUR BY NAME ANJAIAH IS ALSO WORKING AND HE HAS
STATED THAT HE IS NOT AWARE OF THE COMPLAINT - ALL THE LABOUR HAVE STATED
THAT NO WAGES ARE DUE TO THEM - HENCE, NO FURTHER ACTION IS REQUIRED. |
|
16/07/2007 2449. |
KAMAREDDY
(V) KAMAREDDY
(M) |
IN KAMAREDDY TOWN STABBING INCIDENTS TOOK PLACE IN
THE MONTH OF MAY/ JUNE THIS YEAR - IN ALL NINE PERSONS WERE INJURED -
EXGRATIA WAS PAID TO SEVEN MEMBERS LEAVING TWO PERSONS BY NAME SRI NARENDER
S/o RAMCHANDER, SRI SUDHEER BABU - KINDLY ARRANGE PAYMENT OF EXGRATIA TO THE
REMAINING TWO VICTIMS AS EARLY AS POSSIBLE. |
THE D.R.O. HAD REPORTED THAT PROPOSALS WERE
SUBMITTED TO THE GOVT. IN GENERAL ADMINISTRATION (L&O) DEPT. FOR SANCTION
OF RELIEF TO ONE DECEASED AND EIGHT INJURED PERSONS - THE GOVT. VIDE
G.O.Rt.NO. 3855 DATED 03.07.2007 HAVE ACCORDED SANCTIONED FOR Rs.6.20 LAKHS
AS EXGRATIA TO THE FAMILY OF ONE DECEASED AND SIX INJURED ONLY - SANCTION IN
RESPECT OF R.SUDHEER BABU AND M.R. NARENDER IS STILL AWAITED - A REMINDER
ISSUED AND AS SOON AS SANCTION IS RECEIVED PAYMENT WOULD BE ARRANGE. |
|
16/07/2007 2450. |
AKBARNAGAR
(V) VARNI
(M) |
IN AKBARNAGAR, THE VILLAGERS PARTICULARLY STUDENTS
AND WOMEN FOLK ARE FACING LOT OF PROBLEMS WITH MONKEYS - LARGE NUMBER OF
MONKEYS HAVE SETTLED IN THE VILLAGE AND BITING WOMEN AND SCHOOL GOING
CHILDREN - PEOPLE ARE SCARED TO GO OUT OF THE HOUSES - KINDLY ARRANGE TO
CATCH THEM AND SHIFT THEM TO ANY DENSE FOREST. THE VILLAGERS ARE NOT GETTING FILTERED WATER SINCE
PAST FOUR DAYS DUE TO FAILURE OF MACHINERY - KINDLY ARRANGE IMMEDIATE REPAIRS
AND SUPPLY OF FILTERED WATER. |
1) THE D.F.O., NIZAMABAD HAD REPORTED THAT TRAINED
LANGOOR FROM COASTAL GODAVARI DISTRICTS HAS TO BE BROUGHT AND KEPT IN THE
VILLAGE TO SOLVE THE MONKEY PROBLEM. THE FOREST RANGE OFFICER CONCERNED IS IN
CONTACT WITH SARPANCH OF AKBARNAGAR FOR BRINING THE LANGOOR. 2) THE S.E. (RWS)
HAD STATED THAT DRINKING WATER TO AKBARNAGAR VILLAGE IS BEING SUPPLIED
FROM C.P.W.S. SCHEME, TAGILEPALLY - APART FROM LOCAL O.H.S.R. WHICH IS
FUNCTIONING NORMALLY - HOWEVER, CLEANING OF SUMP WELL BACK WASHING OF FILTER
BED WAS TAKEN UP TO ENSURE SUPPLY OF SAFE WATER - AS A RESULT, THERE WAS
INTERRUPTION IN SUPPLY OF DRINKING WATER FOR THREE DAYS AT PRESENT THERE IS
NO PROBLEM AS NORMAL SUPPLY IS RESTORED ON 17.07.2007. |
|
16/07/2007 2451. |
BALRAJ WARDMEMBER,
S.N.PURAM G.P. WADDEPALLI
(V) VARNI
(M) |
IN WADDEPALLI VILLAGE PHOTOS FOR IRISH
VERIFICATION WERE TAKEN UP AND NEARLY 30 FAMILIES INCLUDING OLD AND NEW DID
NOT RECEIVE RATION CARDS - COUPONS WERE ISSUED FOR ONE MONTH ONLY AND
THEREAFTER NO RATION IS BEING SUPPLIED
- SINCE MOST OF THEM ARE LABOUR KINDLY ARRANGE EITHER TO ISSUE NEW
RATION CARDS OR COUPON BOOKS TILL RATION CARDS ARE ISSUED SO THAT THE LABOUR
ELIGIBLE COULD GET RATION EVERY MONTH. |
THE D.S.O. HAD REPORTED THAT THE CALLER SRI BALRAJ
, WARD MEMBER, S.N.PURAM, WADDEPALLI WAS CONTACTED AND REQUESTED TO FURNISH
THE DETAILS OF 30 FAMILIES COULD NOT POSSESS COUPONS AND NOT GETTING RICE -
HE HAD STATED THAT HE DOES NOT HAVE SUCH DETAILS AND AS A WARD MEMBER
CASUALLY COMPLAINED IN D.Y.C. PROGRAMME - ON THE BASIS OF AGGREGATION DATA
FURNISHED BY THE SERVICE PROVIDER A QUANTITY OF 2003.64 QTLS. OF RICE WAS
ALLOTTED TO TAHSILDAR FOR DISTRIBUTION TO WHITE CARD HOLDERS - HOWEVER AN ADDITIONAL
QUANTITY OF 64.56 QTLS. IS BEING ALLOTTED TO VARNI MANDAL AT THE REQUEST OF
THE TAHSILDAR FOR DISTRIBUTION TO ELIGIBLE FAMILIES WHO DID NOT GET WHITE
CARDS DUE TO TECHNICAL PROBLEM. |
|
16/07/2007 2452. |
NANDALA
RAMYA KRISHNA 8TH
CLASS, ZPHS PIPRI
(V) ARMOOR
(M) |
IN OUR SCHOOL THERE IS NO TEACHER TO TEACH TELUGU
AND ENGLISH SUBJECTS FOR THE PAST ONE YEAR - ALL THE STUDENTS ARE SUFFERING A
LOT FOR WANT OF TEACHER TO THESE IMPORTANT SUBJECTS - KINDLY ARRANGE POSTING
OF TEACHERS FOR THE ABOVE SUBJECTS AS EARLY AS POSSIBLE. |
THE D.E.O. HAD REPORTED THAT RESPONDING TO THE
REQUEST OF THE CALLER TWO VIDYA VOLUNTEERS FOR TEACHING ENGLISH AND TELUGU
SUBJECTS WERE APPOINTED TO REDUCE THE PROBLEM OF STUDENTS. |
|
16/07/2007 2453. |
DRYAPUR
THANDA NAVIPET
(M) |
MY SON-IN-LAW MASTER ASHOK HAD APPEARED FOR
ADMISSION IN CLASS VI AT GURUKULA PATASALA, POCHAMPAD AND PASSED THE TEST -
HIS NAME WAS ALSO FOUND IN THE SELECTED LIST UNDER S.T. QUOTA WHICH WAS
EXHIBITED IN THE SCHOOL - ACCORDINGLY, A LETTER WAS ALSO RECEIVED TO BRING
THE WARD ALONGWITH RELEVANT CERTIFICATES FOR ADMISSION - SUBSEQUENTLY,
ANOTHER LETTER IS RECEIVED FROM HYDERABAD KEEPING THE SELECTION IN ABEYANCE
DUE TO SOME RESERVATION PROBLEM - KINDLY ARRANGE TO ADMIT IN GURUKULAM,
POCHAMPAD AS EARLY AS POSSIBLE. |
THE D.T.W.O., HAD REPORTED THAT THE A.P.R.E.I.
SOCIETY HYDERABAD HAD SELECTED EIGHT S.T. STUDENTS AS AGAINST THE TOTAL
STRENGTH OF 36 STUDENTS FOR CLASS 5 ON 16.06.2007 - ACTUALLY THE SOCIETY WAS
EXPECT TO SELECT 6 S.C. AND 2 S.T. STUDENTS - AFTER NOTIFYING THE MISTAKE THE
A.P.R.E.I. SOCIETY, HYDERABAD HAD SENT A REVISED LIST ON 2.7.07 SELECTING 6
S.C. AND 2 S.T. STUDENTS - THE S.T. STUDENT WHO SECURED 73 AND 69 MARKS
RESPECTIVELY WERE SELECTED WHEREAS M.ASHOK HAD SECURED 45 MARKS ONLY AND AS
SUCH DID NOT FIND PLACE IN THE FINAL SELECTION LIST - THE FACT WAS INFORMED
TO SRI SHANKAR UNCLE OF MR.ASHOK AND HE WAS ADVISED TO ADMIT THE BOY IN ANY
ONE OF THE GOVT. S.T. BOYS HOSTELS IN THE DISTRICT. |
|
16/07/2007 2454. |
MD.
ZAHEERUDDIN WARD
MEMBER BANSWADA
(V) BANSWADA
(M) |
IN BANSWADA PROPER A NEW HOUSING COLONY UNDER THE
BANNER "SRI SAI KRUPAKANAGAR" IS FORMED - PROPOSALS WERE SUBMITTED
FOR APPROVAL OF THE LAYOUT - THE OWNERS ARE REGISTERING THE PLOTS WITHOUT
RECEIPT OF APPROVAL OF LAYOUT PLAN, HANDING OVER 10% OF LAND TO G.P. AND
REMITTING BETTERMENT CHARGES TO THE G.P. - REGISTERING OF PLOTS WITHOUT
APPROVAL OF COMPETENT AUTHORITY IS ILLEGAL - FURTHER THE G.P. IS LOOSING
REVENUE IN THE SHAPE OF 10% OF LAYOUT LAND AND BETTERMENT CHARGES - KINDLY
TAKE NECESSARY ACTION IN THE MATTER. |
THE D.P.O. HAD REPORTED THAT THE LAYOUT WAS
SANCTIONED BY THE DIRECTOR OF TOWN PLANNING, HYDERABAD BUT THE OWNER FAILED
TO REMIT THE BETTERMENT CHARGES TO THE G.P. AS SUCH G.P. DID NOT ACCORD
PERMISSION FOR ALLOTMENT OF PLOTS - THE SARPANCH AND P.S.G.P. WERE INSTRUCTED
TO COLLECT THE BETTERMENT CHARGES FROM THE OWNER IMMEDIATELY. |
|
16/07/2007 2455. |
ANIL
KUMAR NANDIPET
(V) NANDIPET
(M) |
I HAVE PURCHASED 0.12 GTS. OF LAND FROM MY UNCLE -
BUT ON THE SPOT THE LAND IS FOUND LESS - ADJACENT PATTEDARS HAVE ENCROACHED
MY LAND BY REMOVING BUNDS - I HAVE REMITTED REQUISITE AMOUNT THROUGH A
CHALLAN AND APPROACH THE M.R.O. FOR SURVEY - THE M.R.O. IS STATING THAT
TIPPANS ARE NOT AVAILABLE IN THE OFFICE AND SURVEYOR IS ALSO ON DEPUTATION
AND ALSO DEMANDING AMOUNT - I REQUEST KINDLY TO ENQUIRE INTO THE MATTER,
ARRANGE SURVEY AND HAND OVER PHYSICAL POSSESSION OF 0.12 GTS. OF LAND. |
THE A.D.(S&LR) HAD REPORTED THAT SURVEYOR WAS
DEPUTED TO THE MANDAL WITH INSTRUCTIONS TO COMPLETE THE WORK BY 18.07.2007 -
SURVEYOR WENT TO THE SPOT ALONG WITH M.R.O. AND HIS UNCLE WHO SOLD THE LAND
TO THE CALLER - THE SELLER WAS NOT IN A POSITION TO SHOW THE LAND SOLD BY HIM
- AT PRESENT THE LAND IS CONVERTED IN TO PLOTS BY APPROVING LAYOUT AND IT IS
VERY DIFFICULT TO LOCATE 0.12 GTS. IN THE ABSENCE OF ANY SURVEY STONES IN THE
LAYOUT AREA - THE SELLER AND CALLER HAVE LAND ON PAPER BUT THEY HAVE NO IDEA
AS TO WHERE THE LAND IS LOCATED - THE SAME WAS INFORMED TO THE CALLER. |
|
16/07/2007 2456. |
MALAPATI SHETPALLY
SANGAREDDY (V) LINGAMPET
(M) |
IN OUR VILLAGE IN MALAPATI AREA ONE OVER HEAD TANK
FOR SUPPLY OF DRINKING WATER IS CONSTRUCTED - PIPELINES FOR FILLING OF TANK
AND SUPPLY LINES WERE ALSO LAID - BUT CONNECTIONS TO DOMESTIC USE FOR HOUSES
IS NOT BEING PROVIDED BY THE SARPANCH - ON QUESTIONING HE IS DEMANDING TO
REMIT Rs.800/- PER EACH CONNECTION BY ALL THE APPLICANTS - THE EXISTING ONE
H.P. MOTOR HAD FAILED AND THE HAND PUMP IS ALSO NOT WORKING - WE ARE FACING
LOT OF PROBLEM FOR DRINKING WATER - KINDLY ARRANGE TO PROVIDE TAP CONNECTIONS
TO ALL THE APPLICANTS AS EARLY AS POSSIBLE. |
THE S.E. (RWS) HAD REPORTED THAT THE POPULATION OF
MALAPATI HABITATION OF SHETPALLY SANGAREDDY G.P. IS 439 AS PER CENSUS-2001 -
THERE IS A SINGLE PHASE MOTOR AND TWO HAND PUMPS - RECENTLY ON 40 K.L. OHSR
WAS COMPLETED UNDER A.R.W.S. P. GRANT AND PUBLIC TAPS PROVIDED AS PER NORMS
AND HANDED OVER TO G.P. THE G.P. PROVIDE HOUSE CONNECTIONS TO PUBLIC AFTER
COLLECTING DEPOSIT RANGING FROM Rs.800 TO 1000 FOR CREATING CORPUS FUND FOR
THE MAINTENANCE OF THE SCHEME - THE G.P. ALSO COLLECT AROUND Rs.30/- PER
MONTH AS TARIFF CHARGE AGAINST WHICH THIS COMPLAINT IS FILED - THE SINGLE
PHASE MOTOR AND HAND PUMPS WERE SERVICED AND FUNCTIONING. |
|
16/07/2007 2457. |
UMAKANTH KODICHERLA
(V) MADNOOR
(M) |
I HAVE APPLIED FOR APPOINTMENT AS VIDHYA VOLUNTEER
IN U.P.S. KODICHERLA VILLAGE OF MADNOOR MANDAL ALONGWITH OTHERS - I HAVE
PASSED B.A. FROM DR.B.R.AMBEDKAR OPEN UNIVERSITY - I WAS NOT SELECTED AND
ANOTHER PERSON BY NAME CHAKRADHAR WHO PASSED 10TH IS SELECTED - WHEN I
APPROACH THE H.M. HE HIS DEMANDING Rs.2000/- FOR APPOINTMENT - I HAVE WORKED
FOR FIVE DAYS AND SINCE I HAVE REFUSED TO PAY Rs.2000/- THE H.M. IS NOT
ALLOWING ME TO ATTEND SCHOOL - KINDLY ENQUIRE AND DO JUSTICE. |
THE D.E.O. HAD REPORTED THAT SRI B.UMAKANTH,
CHAKRADHAR AND RAJU HAVE APPLIED FOR THE POST OF VIDHYA VOLUNTEER AT U.P.S.
KODICHERLA, ALL THE THREE APPLICANTS HAVE SUBMITTED EDUCATION
QUALIFICATION CERTIFICATE UPTO S.S.C.
ONLY - THE CALLER DID NOT FILE ANY HIGHER QUALIFICATION CERTIFICATE AS STATED
IN THE D.Y.C. - AMONG THE THREE CANDIDATES APPLIED FOR THE POST SRI
CHAKRADHAR WAS SELECTED AS HE IS WORKING CONTINUES ELY FOR THE PAST 11 YEARS
AND THE OTHER TWO WERE FRESH CANDIDATES - THERE IS NO TRUTH IN THE COMPLAINT
FILED. |
|
16/07/2007 2458. |
POCHARAM
(V) NAGIREDDYPET
(M) |
IN OUR VILLAGE AMBEDKAR BHAVAN WAS SANCTIONED ONE
YEAR BACK AND CONSTRUCTION STARTED AND STOPPED AFTER RAISING WALLS - THE
CONTRACTOR IS FROM LOCAL AREA AND HE HIS DODGING TAKE UP THE WORK EVERY TIME
- WE HAVE BROUGHT THIS ISSUE TO THE NOTICE OF THE MPDO/ MRO DURING LAST
PRAJAPATHAM - BUT THERE IS NO RESPONSE EITHER FROM CONTRACTOR OR FROM
OFFICIALS - DUE TO NON COMPLETION OF THIS BUILDING S.C. COMMUNITY MEMBERS ARE
FACING LOT OF PROBLEMS - KINDLY ARRANGE TO COMPLETE THE BUILDING AS EARLY AS
POSSIBLE. |
THE E.E.P.R., KAMAREDDY HAD REPORTED THAT THE WORK
CONSTRUCTION OF S.C. COMMUNITY HALL AT POCHARAM" WAS SANCTIONED UNDER
D.C.P. GRANT DURING THE YEAR 2005-06 WITH AN ESTIMATED COST OF Rs.1.50 LAKHS
- THE WORK WAS ENTRUSTED TO ONE SRI BAPU RAO LOCAL RESIDENT OF POCHARAM ON
NOMINATION BASIS - THE WORK IS COMPLETED UP TO LINTEL LEVEL ONLY - THE
EXECUTING AGENCY IS DODGING TO COMPLETE THE WORK AND STATING THAT LABOUR IS
NOT AVAILABLE AND RATES WERE NOT WORKABLE - HE WAS INSTRUCTED THE RESUME THE
WORK WITHIN A MONTH OTHER WISE THE WORK WOULD BE ENTRUSTED TO SOME OTHER
AGENCY. |
|
16/07/2007 2459. |
MOHD.
AJARUDDIN KAMAREDDY
(V) KAMAREDDY
(M) |
IN GANDHINAGAR AREA, WARD NO.7 OF KAMAREDDY
MUNICIPALITY THERE IS NO DRAINAGE FACILITY AND THE WATER IS STAGNATED IN
RESIDENTIAL AREA, RESULTING HEALTH PROBLEMS - REPRESENTATION TO THE MUNICIPAL
OFFICIALS DID NOT YIELD ANY RESULT - THE CONDITION WAS ALSO SHOWN TO HON'BLE
MINISTER SRI SHABBIR ALI WHO ASSURED TO SOLVE THE PROBLEM - BUT NO ACTION IS
TAKEN SINCE PAST ONE YEAR - DUE TO RAINY SEASON THE PROBLEM IS WORST NOW -
KINDLY INTERVENE AND TAKE NECESSARY ACTION TO DIVERT THE STAGNATED WATER. |
THE COMMISSIONER, M.C., KAMAREDDY HAD REPORTED
THAT THERE IS NO DRAINAGE IN THE AREA
AND ESTIMATES ARE PREPARED FOR CONSTRUCTION OF NEW DRAIN FROM H.NO. 1-5-414
TO 1-5-432 AT GANDHI NAGAR AND WOULD BE PLACED IN THE GENERAL BODY MEETING
SCHEDULED AT END OF THIS MONTH - AFTER RECEIVING ADMINISTRATIVE SANCTION FROM
THE COUNCIL THE WORK WOULD BE TAKEN UP. |
|
06/08/2007 2460. |
PULI
SAILU CHINDU
ARTIST CH.KONDUR
(V) NANDIPET
(M) |
WE HAVE REQUESTED FOR ALLOTMENT OF HOUSE SITE FOR
45 FAMILIES AND CONSTRUCTION OF HOUSES UNDER INDIRAMMA HOUSING PROGRAMME -
THE TAHSILDAR, NANDIPET HAD ISSUED A MEMO TO US INFORMING THAT PROPOSALS IN
RESPECT OF 29 ELIGIBLE FAMILIES WERE SUBMITTED TO THE COLLECTOR FOR ACCORDING
SANCTION - WE REQUEST KINDLY TO ACCORD EARLY SANCTION AND SANCTION OF HOUSES
UNDER INDIRAMMA PROGRAMME AS OUR VILLAGE IS INCLUDED IN INDIRAMMA ADARSHA
GRAMAM. |
THE D.R.O. HAD REPORTED THAT THE M.R.O., NANDIPET
WAS INSTRUCTED SANCTION HOUSE PLOTS AND HOUSES UNDER INDIRAMMA HOUSING
PROGRAMME TO ALL THE ELIGIBLE CHINDU ARTISTS AS PER ELIGIBILITY AS IT IS NOT
POSSIBLE TO PROVIDE THEM HOUSE SITES IN NIZAMABAD TOWN. THE SAME WAS INFORMED
TO THE CALLER VIDE MEMO NO.B2/1188/07, DATED 18.08.07 |
|
06/08/2007 2461. |
SRINIVAS,
LATHA RUDRUR
(V) VARNI
(M) |
I HAVE TWO DAUGHTERS AND APPLIED FOR ASSISTANCE
UNDER GIRL CHILD PROTECTION SCHEME - AT THE TIME OF FILLING APPLICATION MY
YOUNGER DAUGHTER AGE WAS 18 MONTHS - BUT SO FAR THERE IS NO RESPONSE EITHER
FROM C.D.P.O. OFFICE OR FROM P.D. OFFICE AT NIZAMABAD - WHENEVER I HAVE
APPROACHED THEM, THEY ARE NOT GIVING ANY INFORMATION AND CURSING ME - KINDLY
ARRANGE TO SANCTION G.C.P. ON PRIORITY BASIS. |
THE P.D.(DW&CDA) HAD REPORTED THAT THE
APPLICANTS REQUEST PERTAINS TO YEAR 2004-05 - DURING THIS YEAR, THE
APPLICATION RECEIVED PRIOR TO 01.04.05 CAN NOT BE SANCTIONED. HOWEVER, IF THE
APPLICATION IS ALREADY APPROVED BY THE DIVISIONAL LEVEL SELECTION COMMITTEE,
AS A SPECIAL CASE THE SAME COULD BE SANCTIONED DULY OBTAINING PRIOR
PERMISSION OF THE DISTRICT COLLECTOR. THE SAME WAS INFORMED TO THE CALLER
VIDE LR.NO.1056/GCPS/07, DATED 14.08.07 |
|
06/08/2007 2462. |
BHEEMGAL
(V) BHEEMGAL
(M) |
IN BHEEMGAL THE MAIN ROAD IS ENCROACHED BY ONE
PERSON AND STONES FIXED IN THE ROAD BOUNDARY - I HAVE FILED A CASE IN THE
COURT AND THE COURT HAD PASSED THE JUDGEMENT ORDERING THE G.P. TO REMOVE THE
ENCROACHMENT AND CLEAR THE ROAD - BUT G.P. AUTHORITIES ARE NOT IMPLEMENTING
THE COURT ORDER - KINDLY INSTRUCT THE G.P. AUTHORITIES TO CLEAR THE ROAD BY
IMPLEMENTING COURT ORDER. |
THE D.P.O. HAD REPORTED THAT SMT. BODDU GANGAVVA
HAD CONSTRUCTED A HOUSE DULY ENCROACHING MAIN ROAD. AFTER OBTAINING
PERMISSION FROM THE G.P. ON AN EARLIER COMPLAINT THE D.P.O. AND DL.P.O. HAVE
INSPECTED THE SITE AND LEARNT THAT SMT. BODDU GANGAVVA HAD FILED A CASE AT
M.M. COURT ARMOOR AND THE CASE IS STILL PENDING. THE G.P.P.S. WAS INSTRUCTED
TO TAKE FURTHER ACTION AS PER THE JUDGEMENT. |
|
06/08/2007 2463. |
ASHWAQ
AHMED WARD
MEMBER BORGAON
(V) RENJAL
(M) |
IN BOARGAON VILLAGE THERE IS NO DRAINAGE FACILITY
- WATER IS BEING STAGNATED AND BECAME A BROODING DEN FOR MOSQUITOES RESULTING
HEALTH PROBLEMS - THERE ARE NO FUNDS IN G.P. TO TAKE UP DRAINAGE CONSTRUCTION
- KINDLY PROVIDE SOME SPL. FUND FOR CONSTRUCTION OF DRAINAGES AND SOLVE THE
PROBLEM. |
THE D.P.O. HAD REPORTED THAT THERE ARE NO FUNDS
WITH G.P. UNDER S.G.R.Y. THE POST OF P.S.G.P. IS ALSO VACANT RESULTING
NON-COLLECTION OF HOUSE TAXES. AS SOON AS TAXES ARE REALISED NECESSARY
REPAIRS TO THE DRAINAGES WOULD BE TAKEN UP AS PER PRIORITY. |
|
06/08/2007 2464. |
PALDA
(V) NIZAMABAD
(M) |
WE HAVE WORKED WITH CHARBHAI BEEDI COMPANY AT
NIZAMABAD AND WE HAVE DEPOSITED AMOUNT WHILE STARTING THE BUSINESS - NOW WE
HAVE CLOSEd THE BUSINESS AND REQUESTED THE COMPANY TO REFUND THE DEPOSIT -
BUT THEY ARE DODGING FOR THE PAST SIX YEARS - KINDLY TAKE NECESSARY ACTION
AND ARRANGE FOR THE REFUND OF DEPOSIT. |
THE LABOUR OFFICER HAD REPORTED THAT THE
MANAGEMENT OF M/s CHARUBAI BEEDI COMPANY HAD REQUESTED TO SEND ON OFFICIAL LETTER
WITH DETAILS OF I.D.NO. ETC. TO EXAMINE THE CLAIM OF THE COMMISSION AGENT.
ACCORDINGLY, THE DETAILS WERE SENT TO BEEDI COMPANY ON 14.08.07 AND THE
DETAILS ARE UNDER VERIFICATION. |
|
06/08/2007 2465. |
B.C.
MAHILA SANGAM WAJEEDNAGAR
(V) BICHKUNDA
(M) |
FOR OUR GROUP Rs.20,000/- LOAN WAS SANCTIONED AND
PAYMENTS WERE MADE REGULARLY - NOW IT HAS COME TO KNOW THAT 50% AMOUNT TO THE
TUNE OF Rs.10,000/- IS SANCTIONED AS SUBSIDY - BUT OUR LEADERS CHAKALI
RAJAVVA, GANGAVVA ARE REFUSING TO
REFUND US AND SWALLOWED THE SUBSIDY AMOUNT - KINDLY ENQUIRE AND DO JUSTICE. |
THE P.D.(DRDA) HAD REPORTED THAT KEERTHI MAHILA
SANGAM IS FUNCTIONING UNDER MAX. A LOAN OF Rs.16,600 WAS SANCTIONED UNDER
SWARNIMA BY B.C. CORPORATION. OUT OF WHICH Rs.8,500/- ONLY WAS REMITTED AND
THERE IS UNACCOUNTED AMOUNT Rs.8,100/-. THOUGH THE ENTIRE AMOUNT WAS
COLLECTED FROM THE MEMBERS. THE LEADER SMT. RAJAVVA AND GANGAVVA ARE ONLY
RESPONSIBLE FOR UNACCOUNTED MONEY. THEY WERE INSTRUCTED IN THE PRESENCE OF
SARPANCH, M.P.T.C. TO CLEAR THE ACCOUNTS. BUT THEY REFUSE TO PAY THE
UNACCOUNTED MONEY AND IF THE OFFICERS WANTED THEY CAN FILE A CASE IN THE
POLICE STATION. SINCE, THE SOCIETY IS FUNCTIONING IN MAX THE
A.P.D., BICHKUNDA WAS INSTRUCTED TO TAKE NECESSARY ACTION BY SENDING A
DETAILED REPORT TO THE CONCERNED MAX AUTHORITIES. |
|
06/08/2007 2466. |
MOHD.
RAHAMAN YELLAREDDY
(V) YELLAREDDY
(M) |
I AM MOHD. RAHMAN I HAVE APPLIED ISSUE OF CASTE
CERTIFICATE AS 'SHAIK' UNDER BC-E QUOTA - THE TAHSILDAR, YELLAREDDY IS
ADVISING TO GET SIGNATURE OF TWO GAZETTED OFFICERS - IN YELLAREDDY THERE ARE
LIMITED GAZETTED OFFICERS AND THEY ARE REFUSING TO SIGN ON THE APPLICATION
FORM - AS A RESULT THERE IS DELAY IN THE ISSUE OF CERTIFICATE. SIMILARLY THE TAHSIDAR IS INSISTING FOR S.S.I.D.
NUMBER IN THE RECOMMENDATION LETTER OF G.P. FOR ISSUE OF CASTE CERTIFICATE -
THE G.P. AUTHORITIES ARE STATING THAT S.S.I.D. NUMBER SHOULD BE ISSUED BY
TAHSILDAR ONLY NOT BY THE G.P. - KINDLY ISSUE SUITABLE INSTRUCTIONS TO THE
TAHSILDAR, YELLAREDDY TO EXPEDITE ISSUE OF CASTE CERTIFICATE. |
THE TAHSILDAR, YELLAREDDY HAD REPORTED THAT THE
CALLER HAD FAILED TO SUBMIT DOCUMENTS AND CERTIFICATES AS PRESCRIBED IN
G.O.Ms.NO. 23 B.C. WELFARE (C2), DATED 07.07.2007. FURTHER, CASTE
CERTIFICATES ARE GENERATED THROUGH COMPUTER AND UNLESS S.S.I.D. NUMBER IS NOT
INCORPORATED THE CERTIFICATE CAN NOT BE GENERATED. VILLAGE WISE S.S.I.D.
NUMBERS WERE ALREADY HANDED OVER TO THE G.P.P.S. WERE INCORPORATION WHILE
RECOMMENDING ISSUE OF CERTIFICATES. IF THE CALLER FULFILS CONDITIONS AS LAID
DOWN G.O. MENTIONED ABOVE HIS CERTIFICATE WOULD BE ISSUE. |
|
06/08/2007 2467. |
BHEEMGAL
(V) BHEEMGAL
(M) |
IN BHEEMGAL TOWN WATER SUPPLY THROUGH TAPS IS
STOPPED IN NEW BUS STAND COLONY FOR THE PAST 3 TO 4 MONTHS - WE ARE PAYING
WATER TAX REGULARLY BUT THE REASONs FOR DISCONNECTING THE SUPPLY OF WATER
THROUGH TAPS ARE NOT KNOWN - KINDLY INSTRUCT THE CONCERNED TO RESTORE SUPPLY
OF DRINKING WATER THROUGH TAPS. SIMILARLY, BUSES ARE NOT TOUCHING NEW BUS STAND
POINT AND THE PUBLIC ARE WAITING HOURS TOGETHER FOR ARRIVAL OF BUSES - KINDLY
INSTRUCT THE R.T.C. AUTHORITIES TO ENSURE THAT EVERY BUS TOUCHES NEW BUS
STAND FOR THE CONVENIENCE OF PUBLIC. |
THE D.P.O. HAD REPORTED THAT WATER IS BEING
SUPPLIED TO NEW BUS STAND COLONY BY BORE WELL AND 7.5 H.P. PUMP. SIX PUBLIC
TAPS ARE PROVIDED UNDER THIS SUPPLY LINE. BUT SOME HOUSE HOLDS ARE DRAWING
WATER BY FIXING HALF H.P. MOTORS. MOREOVER THE ELECTRIC MOTOR DEVELOPED
PROBLEMS AND SENT FOR REPAIR. AS SOON AS IT IS REPAIRED WATER WOULD BE
SUPPLIED THROUGH PUBLIC TAPS. FURTHER, IT IS REPORTED AS PER THE G.P. BYE-LAW
NEW DOMESTIC CONNECTION COULD BE PROVIDED AFTER DEPOSITING Rs.2650/-. BUT THE
CALLER AND OTHERS IN THE COLONY ARE REFUSING TO PAY THE DEPOSIT. AS SUCH
DOMESTIC CONNECTIONS WERE NOT PROVIDED. THE R.M. RTC HAD REPORTED THAT THERE ARE TWO BUS
STATIONS IN BHEEMGAL VILLAGE. THE OLD BUS STATION WAS BUILT BY G.P. IN THE
MIDDLE OF TOWN AND THE OTHER NEW BUS STATION WAS BUILT BY R.T.C. UNDER
T.G.K.P. SCHEME. THE OLD BUS STATION IS CONVENIENT TO ALL PASSENGERS OF
VARIOUS CATEGORIES. HENCE, THE PASSENGERS HAVE NOT PREFERRED TO TRAVEL FROM
NEW BUS STAND. AS PER THE REQUEST OF VILLAGERS THE BUSES WERE OPERATED FROM
NEW BUS STATION BUT THERE NO PATRONAGE FROM PUBLIC. HOWEVER, BUSES PLYING
FROM NEW BUS STATION TO ARMOOR VIA. VAILPUR
ARE BEING STOPPED AT NEW BUS STATION ON BOTH DIRECTIONS FOR
CONVENIENCE OF PASSENGERS. |
|
06/08/2007 2468. |
SAILU KUMANPALLY
(V) BODHAN
(M) |
IN OUR VILLAGE A POST OF VILLAGE SERVANT HAD
FALLEN VACANT AND THE SAME WAS FILLED ILLEGALLY BY APPOINTING A PERSON FROM
OUT SIDE THE VILLAGE - AGGRIEVED BY THIS WE HAVE FILED REPRESENTATION TO THE
TAHSILDAR AND WHEN THERE WAS NO RESPONSE FILED APPEALED BEFORE THE R.D.O.
BODHAN - THE R.D.O. AFTER THROUGH ENQUIRY FOUND IRREGULARITIES AND THEREFORE
CANCELLED THE APPOINTMENT - ON THIS THE INDIVIDUAL HAD FILED APPEAL BEFORE
THE COLLECTORATE AND THE SAME IS PENDING SINCE THREE MONTHS - KINDLY DISPOSE
THE CASE EARLY AND PROVIDE EMPLOYMENT TO THE LOCAL UNEMPLOYED YOUTH. |
THE D.R.O. HAD REPORTED THAT THE M.R.O. BODHAN
VIDE PROCEEDINGS NO. A1/11145/05, DATED 12.04.2006 APPOINTED VILLAGE SERVANTS
AS SHOWN BELOW. 1) SRI PULAKANTI SATISH, PENTAKALAN, 2) SRI SUNIL KUMAR,
NAGORA, 3) GAINI GANGARAM, KUMANPALLI. SUBSEQUENTLY ON COMPLAINT THE R.D.O.,
BODHAN ENQUIRED THE MATTER AND CANCEL THE APPOINTMENT ORDERS ISSUED BY THE
M.R.O., BODHAN VIDE PROCEEDINGS NO. E1/103/07, DATED 12.04.07. AGGRIEVED BY THE ABOVE ORDERS INDIVIDUAL AT SL.
NO. 1 & 2 HAVE FILED APPEALED BEFORE THE COLLECTOR AND THE SAME ARE UNDER
PROCESS. SRI GAINI GANGARAM S/O LAXMAIAH AGAINST WHOM
COMPLAINT HIS FILED BY THE CALLER HAD NOT PREFERRED ANY APPEAL BEFORE THE
COLLECTOR. THE COMPLAINT SAILU HAS NOTHING TO DO WITH THE
APPOINTMENTS MADE BY THE M.R.O. FOR THE ABOVE VILLAGES AND MOREOVER HE DID
NOT FILED ANY APPLICATION FOR APPOINTMENT TO THE POST OF V.S. TO ANY OF THE
THREE VILLAGES. |
|
06/08/2007 2469. |
MAHENDER
GOUD PERKIT
(V) ARMOOR
(M) |
I AM A PHYSICALLY HANDICAPPED PERSON AND HOLDING A
WHITE RATION CARD FOR THE PAST 15 YEARS - THERE IS NO EMPLOYEE IN MY FAMILY
INCLUDING MY SELF - BUT IN THE RECENT D.P.L. CAMP MY WHITE CARD WAS REPLACED
WITH PINK CARD - I HAVE REPRESENTED THE MATTER TO THE TAHSILDAR WHO PROMISED
TO ISSUE WHITE CARD AS SOME ERROR TOOK PLACE BUT SO FAR I AM NOT ISSUED WHITE
CARD - KINDLY ARRANGE TO ISSUE WHITE CARD AS EARLY AS POSSIBLE AND SOLVE MY
PROBLEM. |
THE TAHSILDAR, ARMOOR HAD REPORTED THAT SRI
MAHENDER GOUD IS A PHYSICALLY DISABLED PERSON AND ELIGIBLE FOR ISSUE OF WHITE
RATION CARD. BUT DUE TO TECHNICAL PROBLEM HE WAS ISSUED PINK CARD. EARLIER HE
WAS HOLDING WHITE RATION CARD BEARING NO.137102. I HAVE PROMISED HIM TO
REPLACE THE PINK CARD AS AND WHEN D.P.L. CENTRE IS ESTABLISHED. I ADVISED HIM
TO APPLY FOR NO RATION CARD CERTIFICATE IF REQUIRED FOR CHILDREN EDUCATION. |
|
06/08/2007 2470. |
PALEM
(V) MORTHAD
(M) |
I HAVE AVAILED LOAN UNDER P.M.R.Y. IN THE YEAR
2005 FOR WHICH I AM ELIGIBLE FOR A SUBSIDY OF Rs.7,500/- - SO FAR I HAVE
CLEARED ENTIRE AMOUNT LEAVING Rs.2000/- FOR ADJUSTMENT IN SUBSIDY AMOUNT -
BUT THE MANAGER, S.B.H. PALEM IS STATING THAT SO FAR SUBSIDY AMOUNT IS NOT
DEPOSITED IN MY ACCOUNT AND INSISTING TO CLEAR ENTIRE BALANCE AMOUNT - KINDLY
ARRANGE TO RELEASE THE ELIGIBLE SUBSIDY AS EARLY AS POSSIBLE TO CLEAR THE
LOAN ACCOUNT. |
THE G.M. (DIC) HAD REPORTED THAT B.PANDARI THE
CALLER WAS SANCTIONED Rs.50,000/- UNDER P.M.R.Y. DURING THE YEAR 2002-03 FOR
ESTABLISHMENT OF KIRANA SHOP. THE BENEFICIARY CLEARED ENTIRE LOAN AMOUNT
LEAVING Rs.4000/- IN BALANCE UNDER THE PRESUMPTION THAT IT WOULD BE ADJUSTED
FROM THE ELIGIBLE SUBSIDY AMOUNT OF Rs.7500/-. BUT SO FAR THE CONCERNED OFFICIALS
FAILED TO RELEASE SUBSIDY. HENCE, DEMAND NOTICE WAS ISSUED BY THE BANKER TO
CLEAR THE BALANCE. SIMILARLY SUBSIDY WAS ALSO NOT SANCTIONED TO ANOTHER FOUR
BENEFICIARIES. THE CONCERNED AUTHORITY MAY BE INSTRUCTED TO
RELEASE THE SUBSIDY IMMEDIATELY. |
|
06/08/2007 2471. |
AILAPUR
(V) NANDIPET
(M) |
THE ROAD TO AILAPUR VILLAGE PASSES THROUGH
JANNEPALLI VAGU ON WHICH A BRIDGE WAS CONSTRUCTED LONG BACK - THE PIPES UNDER
THE BRIDGE APPEARS TO BE BLOCKED AND AS SUCH WATER IS FLOWING FROM ABOVE THE
BRIDGE - THIS HAS RESULTED IN FORMING OF BIG POT HOLES TO A DEPTH OF NEARLY
ONE FEET - DUE TO FLOW OF WATER VEHICLE DRIVERS ARE UNABLE TO SEE THE POT
HOLES WHICH IS RESULTING IN ACCIDENTS - KINDLY ARRANGE TO REPAIR THE BRIDGE
AND SAVE US FROM THIS PROBLEM. |
THE E.E.(R&B), BODHAN HAD REPORTED THAT HE HAD
INSPECTED THE BRIDGE ON JANNEPALLY VAGU ON 08.08.07. IT IS HIGH LEVEL R.C.C.
SLAB BRIDGE AND STRUCTURALLY SOUND AND NOT BLOCKED AS COMPLAINT BY THE
CALLER. APPROACHES TO BRIDGE ON EITHER SIDES WERE PARTLY DAMAGED DUE TO RECENT
RAIN AND ALREADY ESTIMATES WERE PREPARED AND SANCTIONED AND THE DAMAGE WERE
WOULD BE COMPLETED WITHIN 10 DAYS. |
|
20/08/2007 2472. |
ASHWAQ
AHMED WARD
MEMBER BOARGAON
(V) RENJAL
(M) |
FUNDS WERE RELEASED FOR CONSTRUCTION OF WEIR
(ALUGU) UNDER INDIRAMMA - THE WORK WAS STARTED AND EXCAVATION COMPLETED TWO
MONTHS BACK BUT SO FAR CONSTRUCTION WORK IS NOT COMMENCED - KINDLY INSTRUCT
THE CONCERNED TO START CONSTRUCTION WORK IMMEDIATELY. |
THE P.D.(DWMA) HAD REPORTED THAT THE COMMISSIONER,
N.R.E.G. SCHEME HAD INSTRUCTED THAT ALL THE WORKS TAKEN UP UNDER INDIRAMMA
TANKS SHOULD BE COMPLETED UP TO SAFE STAGE AND WORKS STOP AND RECOMMENCED IN
JANUARY 2008 DUE TO RAINY SEASON. HOWEVER, IN THE PRESENT CASE THE CONCERNED
E.E. WAS INSTRUCTED TO COMPLETE THE WORK UPTO SAFE STAGE AND REPORT
COMPLIANCE. |
|
20/08/2007 2473. |
GOLLA
GANGADHAR TADKOL
(V) BANSWADA
(M) |
REQUEST FOR ADMISSION OF MY DAUGHTER INTO R.B.C.
GURUKULAM PATASALA - I AM A PHYSICALLY HANDICAPPED PERSON UNABLE TO PROVIDE
EDUCATION IN PRIVATE SCHOOL. |
THE APC(SSA) HAD REPORTED THAT BABY VINODHA IS NOT
THE DAUGHTER OF CALLER SRI GOLLA GANGADHAR. HIS TWO DAUGHTERS ARE ALREADY
STUDYING IN VELUGU SCHOOL AT TADKOLE. BABY VINODHA IS DAUGHTER OF PANDARI
WERE RESIDENT OF CHOWKAMPALLY VILLAGE OF KANGIDI MANDAL, MEDAK DISTRICT. SHE
IS A DROPOUT FROM CLASS FIVE. THE CALLER IS A RELATION TO HER. SINCE BABY VINODA NOT ELIGIBLE FOR ADMISSION IN
APRPRP SCHOOLS SHE WAS GIVEN ADMISSION IN B.C. GIRLS HOSTEL KONA BANSWADA IN
CLASS FIVE AND M.E.O. BANSWADA WAS ALSO INSTRUCTED TO ADMITTED IN THE SCHOOL.
BOTH WARD AND CALLER HAVE AGREED FOR THIS ARANGEMENT. |
|
20/08/2007 2474. |
BANOBI KAMAREDDY
(V) KAMAREDDY
(M) |
IN RAJANAGAR COLONY URDU MEDIUM SCHOOL, KAMAREDDY
SRI KARIM TEACHER, IS ATTENDING TO SCHOOL VERY LATE AND NOT CONDUCTING PRAYER
- ON QUESTIONING HE IS GIVING AN ARROGANT REPLY STATING THAT GO AND COMPLAIN
TO D.E.O. - BECAUSE OF HIS NEGLIGENT ATTITUDE SCHOOL GOING CHILDREN ARE
BECOMING DROPOUTS. - KINDLY TAKE NECESSARY ACTION TO SET RIGHT THE TEACHER
AND SCHOOL. |
THE D.E.O. HAD REPORTED THAT THE SCHOOL IS RUNNING
SMOOTHLY AND TEACHERS ARE ATTENDING IN TIME AND THERE IS NO COMPLAINT FROM
THE STUDENTS SIDE AND THEY ARE SATISFIED WITH THE TEACHING. RECENTLY ONE SRI
KARAMATH ALI FROM THE SCHOOL WAS DEPUTED TO GOLLAWADA SCHOOL DUE TO COMPLAINT
FROM PARENTS ON MISUSE OF SCHOOL FUNDS. IT APPEARS THAT THIS TEACHER IS
BEHIND THE COMPLAINT THROUGH BANOBI, THE CALLER. NO FURTHER ACTION IS
REQUIRED. |
|
20/08/2007 2475. |
SATISH B.C.
COLONY YELLAREDDY
(V) YELLAREDDY
(M) |
IN YELLAREDDY PROPER HOUSE PLOTS WERE ALLOTTED TO
B.Cs. - SOME LOCAL MEMBERS HAVE ILLEGALLY OCCUPIED PLOTS WORTH Rs.10.00 LAKHS
FOR SOCIETY - THIS LAND IS ACTUALLY EARMARKED FOR CONSTRUCTION OF COMMUNITY
HALL - PLEASE EVICT THE ENCROACHERS AND TAKE UP CONSTRUCTION OF COMMUNITY
HALL - WE HAVE ALREADY BROUGHT TO THE NOTICE OF TAHSILDAR BUT NO ACTION IS
TAKEN TO EVICT THEM. |
THE TAHSILDAR, YELLAREDDY HAD REPORTED THAT HE HAD
VISITED THE SPOT AND ONE SRI RAJA GOUD WHO WAS ALLOTTED A PLOT HAD TRIED TO
ENCROACH ADDITIONAL AREA WITH FIVE FEET WIDTH FROM OPEN LAND OF 20 FEET INTO
30 FEET RESERVED FOR COMMON PURPOSE. HE WAS EVICTED FROM ENCROACHMENT EARLIER
AND NOW THE LAND IS VACANT. COMMUNITY ELDERS OF RANGARI CAST HAVE FILED
APPLICATION FOR CONSTRUCTION OF COMMUNITY HALL OR TEMPLE. G.P. HAVE APPLIED FOR
ALLOTMENT OF THIS LAND FOR CONSTRUCTION OF SCHOOL IN PRAJAPATHAM PROGRAMME.
THE PROPOSALS ARE UNDER PROCESS. AFTER OBTAINING PERMISSION FROM COLLECTOR, THE
LAND WOULD BE ALLOTTED AS PER THE SANCTION FROM THE COLLECTOR. AT PRESENT
THERE IS NO ENCROACHMENT AS ALLEGED IN THE D.Y.C. |
|
20/08/2007 2476. |
ASHWAQ
AHMED PEACE
COMMITTEE MEMBER ARMOOR
(V) ARMOOR
(M) |
IN ARMOOR THERE IS A GIRLS HIGH SCHOOL AND BOYS
HIGH SCHOOL - IN BOTH THE SCHOOLS URDU MEDIUM SECTIONS ALSO EXIST - DUE TO
LACK OF STRENGTH IN BOYS SCHOOL THE URDU MEDIUM SECTION IS LIKELY TO BE
CLOSED - OUR COMMUNITY ELDERS HELD DISCUSSIONS TO AVOID CLOSER OF URDU
SECTION IN BOYS SCHOOL DECIDED TO SHIFT SOME OF THE STUDENTS RESIDING NEAR
BOYS SCHOOL AREA TO BOYS SCHOOL WITH THE EXPRESS PERMISSION OF THE PARENTS -
AS THE BOYS SCHOOL NOW CHANGE IN TO COEDUCATION - BUT THE H.M., GIRLS IS NOT
ISSUING T.Cs. - KINDLY INSTRUCT THE H.M. TO ISSUE T.Cs. TO SAVE THE CLOSER OF
URDU SECTION IN ZPHS, BOYS. THE SHADHI KHANA AT ARMOOR WAS CONSTRUCTED SOME 10
YEARS BACK AND IT IS STILL UNDER THE CUSTODY OF D.M.W.O. AND NOT HANDED OVER
TO COMMUNITY ELDERS - AS SUCH WE ARE UNABLE TO USE IT FOR ANY COMMUNITY
PURPOSE - KINDLY INSTRUCT THE D.M.W.O. TO HAND OVER THE BUILDING IMMEDIATELY. |
THE D.E.O. HAD REPORTED THAT ARMOOR PEACE
COMMITTEE MEMBERS ARE REQUESTING ISSUE OF T.C. AND PRESSURISING THE H.M.,
Z.P.H.S. GIRLS, FOR ISSUE OF T.C. TO AVOID WINDING UP OF URDU SECTION IN
Z.P.H.S. BOYS. WHERE AS, THE PARENTS OF GIRLS STUDENTS ARE NOT INTERESTED TO
TAKE T.Cs. AND JOIN IN BOYS SCHOOL. IF THE PARENTS APPLY FOR T.Cs., THE H.M.
HAS NO OBJECTION TO ISSUE THE T.Cs. THE D.M.W.O. HAD REPORTED THAT THERE IS A STATUE
OF PANDIT JAWAHARLAL NEHRU IN THE PREMISES OF SHADHIKHANA COMPOUND AND IT WAS
DECIDED TO SHIFT THE SAME TO SCHOOL PREMISES AND THE EXPENDITURE SHOULD BE
BORN FROM FUNDS RELEASED FOR CONSTRUCTION OF SHADIKHANA. IT IS NOT CLEAR WHETHER FUNDS WERE RELEASED TO THE
TAHSILDAR, ARMOOR TO MEET THE SHIFTING EXPENDITURE. THE REPLY IS NOT RELEVANT TO THE REQUEST MADE BY
THE CALLER IN THE D.Y.C. |
|
20/08/2007 2477. |
BEGARI
BHOOMAIAH GOVOORU
(V) VARNI
(M) |
MY RESIDENTIAL HOUSE AND CATTLE SHED WERE GUTTED
SOME 1 ½ YEAR BACK AND MY MILCH ANIMALS PERISHED IN THE ACCIDENT - I HAVE
APPROACHED E.D. SC CORP. FOR SANCTION OF LOAN TO PURCHASE MILCH ANIMALS FOR
SURVIVAL OF MY FAMILY - HE ADVISE TO GET CONSENT LETTER FROM SYNDICATE BANK -
I HAVE APPROACHED MANAGER SEVERAL TIMES BUT HE FAILED TO RESPOND - I HAVE
FILED GRIEVANCE 18.12.2006 AND THE SAME WAS SENT TO L.D.M. FOR NECESSARY
ACTION - BUT SO FAR CONSENT IS NOT GIVEN - KINDLY INSTRUCT THE MANAGER,
SYNDICATE BANK TO ISSUE CONSENT AND GROUND THE SCHEME ON PRIORITY BASIS. (
DYC NO. 2414, DATED 02.04.2007) - REPEATED THE PROBLEM IN TODAYS D.Y.C. |
THE E.D.(S.C. CORPORATION) HAD REPORTED THAT SRI
BEGARI MUTAIAH S/o BHOOMAIAH, CALLER WAS FINANCED FOR S.T.D. BOOTH ON
16.08.2005. THE REPAYMENT IS IRREGULAR AND NOT PAID ANY INSTALMENT SINCE PAST
SIX MONTHS. HOWEVER, THE MANAGER HAD AGREED TO SANCTION LOAN IF THE
APPLICATION OF THE CALLER IS PROCESSED TO JOINT IDENTIFICATION PROGRAMME FOR
THE YEAR 2007-2008. THE CALLER WAS INFORMED TO ATTEND THE MANDAL
COMMITTEE FOR IDENTIFICATION OF BENEFICIARIES TO CONSIDER SANCTION OF LOAN. |
|
20/08/2007 2478. |
SRINIVAS BIRKOOR
(V) BIRKOOR
(M) |
MY DAUGHTER HAD STUDIED IN PRAGATHI SCHOOL - NOW I
WANT TO JOIN HER IN ANOTHER COLLEGE - THE PRINCIPAL IS NOT ISSUING T.C. AND
DEMANDING TO JOIN MY DAUGHTER IN HIS COLLEGE ONLY - BUT I AM NOT INTERESTED -
KINDLY ARRANGE TO ISSUE T.C. |
THE D.E.O. HAD REPORTED THAT KUM. P.JYOTHI HAD
STUDY UPTO S.S.C. AT PRAGATHI VIDYANIKETAN, BIRKUR. SHE JOINED PRIVATE
COLLEGE AND STUDYING INTERMEDIATE 1ST YEAR BUT SHE WAS NOT ISSUED T.C. AS SHE
FAILED TO CLEAR THE DUE FEES. THE M.E.O. CONVENCED THE MANAGEMENT TO WRITE OFF
THE DUE AMOUNT AND ISSUE T.C. AND OTHER CERTIFICATES IF ANY. ACCORDINGLY, THE
MANAGEMENT AGREED AND ISSUE THE T.C. |
|
20/08/2007 2479. |
VENKATESH OOTPALLY
(V) BODHAN
(M) |
IN OUR VILLAGE THERE ARE AROUND 1800 LABOUR AND
WORKING UNDER VARIOUS WORKS TAKEN UP UNDER E.G.S. PROGRAMME - BUT FOR THE
PAST 15 DAYS NO WAGES ARE PAID CAUSING INCONVENIENCE TO THE LABOUR - KINDLY
ARRANGE TO PAY WAGES AS EARLY AS POSSIBLE. |
THE P.D.(DWMA) HAD REPORTED THAT THE WAGES WERE
UNDER VERIFICATION AND ALL THE DUE WAGES WERE PAID TO THE LABOUR ON 22.08.2007
IT SELF. |
|
20/08/2007 2480. |
HANMANTH
REDDY BANDAPALLI
(V) PITLAM
(M) |
WE ARE RESIDENTS OF BANDAPALLI VILLAGE OF PITLAM
MANDAL - THERE IS NO POLLING BOOTH IN OUR VILLAGE - WE HAVE TO GO TO BANDA
RENJAL VILLAGE IN BICHKUNDA MANDAL WHICH IS 3 K.Ms. AWAY TO CAST OUR VOTE FOR
M.L.A./ M.P. ELECTIONS - WE REQUEST TO KINDLY ARRANGE POLLING BOOTH IN OUR
VILLAGE I.E. BANDAPALLI INSTEAD OF BANDA RENJAL FOR THE ENSUING ELECTIONS. |
THE TAHSIDAR, PITLAM HAD REPORTED THAT POLLING
STATION NO.101 SITUATED AT BANDA RENJAL VILLAGE OF BICHKUNDA MANDAL FALSS
UNDER THE JURISDICTION OF 234-JUKKAL ASSEMBLY CONSTITUENCY. THE TOTAL NUMBER
OF VOTERS ALLOTTED TO P.S.-101 IS 1183. THE DETAILS ARE AS UNDER 1) BANDARENJAL VILLAGE, BICHKUNDA MNDAL - 776
VOTERS. 2) BANDAPALLY VILLAGE, PITLAM MANDAL - 407 VOTERS. THE DISTANCE FROM BANDAPALY VILLAGE OF PITLAM
MANDAL TO P.S.101 OF BANDARENJAL VILLAGE IN BICHKUNDA MANDAL IS AROUND 3
K.Ms. THE SARPANCH AND VILLAGERS HAVE REQUESTED TO FORM A SEPARATE POLLING STATION IN
THEIR VILLAGE ONLY AS THE VILLAGE AS THREE HAMLETS AND VOTERS ARE FACING TO
REACH P.S.NO.101 SITUATED AT BANDA RENJAL VILLAGE OF BICHKUNDA MANDAL. THEY
HAVE ALSO STATED THAT DUE TO THIS INCONVENIENCE AROUND 200 TO 300 VOTERS DID
NOT GET THEIR NAMES ENROLLED PARTICULARLY WOMEN. IF ALL THE ELIGIBLE VOTERS
ARE ENUMERATED THIS STRENGTH WOULD RISE TO AROUND 700 VOTERS AND ENABLE
FORMATION OF SEPARATE POLLING STATION IN THEIR VILLAGE ITSELF. REQUESTED TO
EXAMINE THE ISSUE AND SOLVE THE PROBLEM BY OBTAINING PERMISSION FROM THE
COMPETENT AUTHORITY. |
|
03/09/2007 2481. |
K.LIMBADRI MACHAREDDY
(V) MACHREDDY
(M) |
I HAVE ERECTED TENTS AT THE D.P.L. CENTER FOR THE
PURPOSE OF ISSUE OF NEW RATION CARDS - I HAVE PRESENTED THE BILL - BUT SO FAR
PAYMENT IS NOT DONE, CAUSING LOT OF INCONVENIENCE TO ME THERE IS NO RESPONSE
FROM THE TAHSILDAR - KINDLY ARRANGE PAYMENT AS EARLY AS POSSIBLE. |
THE DSO HAD REPORTED THAT PROPOSALS WERE ALREADY
SUBMITTED TO THE COMMISSIONER, CIVIL SUPPLIES FOR RELEASE OF ADDITIONAL
AMOUNT. SANCTION IS AWAITED. AS SOON AS AMOUNT IS RELEASED PAYMENT DUE TO THE
CALLER WOULD BE SETTLED. |
|
03/09/2007 2482. |
RAVINDER CH.KONDUR
(V) NANDIPET
(M) |
IN CH.KONDUR OF NANDIPET MANDAL SOCIAL AUDIT WAS
ORGANISED FOR THE WORKS TAKEN UP UNDER N.R.E.G. AND IT WAS ESTABLISHED THAT
CONCERNED OFFICERS HAVE INDULGED IN ILLEGAL ACTIVITIES - BUT SO FAR NO ACTION
HAS BEEN TAKEN AGAINST THEM AND THEY ARE STILL DISCHARGING DUTIES - KINDLY
TAKE IMMEDIATE ACTION TO REMOVE THEM FROM SERVICE AND RECOVER THE AMOUNT
MISAPPROPRIATED. |
THE P.D.(DWMA) HAD REPORTED THAT SUITABLE
INSTRUCTIONS WERE ISSUED TO THE M.P.D.O. VIDE LR.No.A2/205/07, DATED 30.08.07
TO RECOVER AMOUNT FROM THE DEFAULTERS AND TAKE ACTION UNDER N.RE.G.S. RULES
AND REPORT THE ACTION TAKEN. |
|
03/09/2007 2483. |
DAYANAND INDALWAI
(V) DICHPALLY
(M) |
MY HOUSE IS LOCATED JUST IN FRONT OF INDALWAI BUS
STOP - IT IS COMING IN ROAD WIDENING AND I AM PAID LAND COMPENSATION Rs.3.50
LAKHS - WHERE AS, MY NEIGHBOUR WHOSE HOUSE IS ALSO BEING ACQUIRED FOR ROAD
WIDENING IS AWARDED A COMPENSATION OF Rs.5.50 LAKHS - BOTH THE HOUSES ARE
SIMILAR IN NATURE AND THE AREA IS ALSO SAME - THERE IS A PARITY IN THE
PAYMENT OF LAND COMPENSATION - KINDLY ENQUIRE AND DO JUSTICE TO ME. |
THE R.D.O., NZB. HAD REPORTED THAT THE CALLER HAD
ALREADY FILED AN APPEAL ON THE NAME OF RAJAMANI FOR RE-ESTIMATING THE VALUE
OF H.NO.3-53/26/2 BEFORE THE MANAGER, N.H.A.I.. THE CONCERNED AUTHORITIES
HAVE ALSO INSPECTED THE HOUSE ALONGWITH ADJACENT HOUSE AND PROPOSED FOR
REVISING THE ESTIMATES. THE REVISED ESTIMATES ARE AWAITED. AS SOON AS REVISED
ESTIMATES ARE RECEIVED ACTION WOULD BE TAKEN TO INCLUDE THE SAME IN OUR AND
ARRANGE PAYMENT. |
|
03/09/2007 2484. |
GOPI
KUMAR REPORTER,
PRAJASHAKTHI BICHKUNDA
(V) BICHKUNDA
(M) |
I AM PRESS REPORTER OF PRAJASHAKTHI, TELUGU DAILY
NEWS PAPER - I AM ALSO ISSUED ACCREDITATION FROM THE DIST. COLLECTOR - I HAVE
APPLIED FOR ALLOTMENT OF PLOT ONE YEAR BACK ALONG WITH OTHER REPORTERS - BUT
WHILE ALLOTTING THE PLOTS MY NAME DID
NOT FIND PLACE - WHEREAS, ONE SRI SRIDHAR OF EENADU DAILY WHO IS NOT
POSSESSING ACCREDITATION WAS ALLOTTED PLOT AGAINST RULES - ON MY
REPRESENTATION, THE PRESENT TAHSILDAR IS STATING THAT IT WAS DONE BY EARLIER
M.R.O. AND AT PRESENT THERE IS NO PLOT IN THIS AREA FOR ALLOTMENT AND
PROPOSING FOR ALLOTMENT IN KANDARPALLY SHIVAR WHICH IS UNFIT FOR OCCUPATION
IMMEDIATELY - KINDLY ENQUIRE AND DO JUSTICE TO ME. |
THE TAHSILDAR, BICHKUNDA HAD REPORTED THAT THERE
ARE (11) PRESS REPORTERS IN THE MANDAL. THE R.D.O., BODHAN VIDE PROC.
NO.B/1563/07 DATED 28.07.2007 HAD ALLOTTED FIVE PLOTS TO FIVE REPORTERS AT
BICHKUNDA PROPER IN SY.NO.15/1 MEASURING 24X50 FEET AND ONE PLOT WAS ALLOTTED
IN SY.NO. 191/1 AT RAJULLA VILLAGE WHICH IS ADJACENT TO BICHKUNDA MEASURING
32X40 FEET TO GOPI KUMAR THE CALLER. BUT THE CALLER IS INSISTING FOR
ALLOTMENT IN SY.NO.15/1 OF BICHKUNDA PROPPER. AT PRESENT THERE ARE NO VACANT
PLOTS IN THIS SURVEY NUMBER. PRESENTLY THE POST OF SURVEYOR IS VACANT DUE TO
RETAIREMENT SRI M.A.SATTAR ON 31.07.2007. AFTER REPORTING OF NEW SURVEYOR IF
ANY GOVT. LAND IS AVAILABLE IN BICHKUNDA PROPER THE REQUEST OF THE CALLER WOULD
BE CONSIDERED. |
|
03/09/2007 2485. |
P.HARNATH
REDDY POCHARAM
(V) NAGIREDDYPET
(M) |
I HAVE APPLIED FOR PASSPORT IN PASSPORT MELA -
POLICE OFFICERS HAVE COME AND ENQUIRED ABOUT THE CONTENTS IN MY APPLICATION
BUT SO FAR NOT RECEIVED PASSPORT - KINDLY ARRANGE TO ISSUE PASSPORT AT AN
EARLY DATE. |
THE CALLER HAD RECEIVED HIS PASSPORT ON 10.09.2007
BY REGISTERED POST. |
|
03/09/2007 2486. |
ASWAQ
AHMED BORGAOM
(V) RENJAL
(M) |
PHYSICALLY DISABLED PERSONS ARE NOT PROVIDED WITH
3% RESERVATION IN ALL THE DEVELOPMENTAL ACTIVITIES LIKE; PMRY/ RYS/ AWS GOVT.
JOBS AND CONTRACT JOBS - KINDLY ARRANGE TO PROVIDE 3% RESERVATIONS TO
DISABLED PERSONS IN ALL DEVELOPMENTAL ACTIVITIES AND JOBS WITHOUT FAIL. |
THE A.D.(DW) HAD REPORTED THAT THE CALLER WAS MET
PERSONALLY AND EXPLAINED ABOUT THE RESERVATION AND PROVIDING 3% BENEFITS TO
ALL THE DISABLE PERSONS IN ALL POVERTY ELEVATION SCHEMES. ONCE AGAIN INSTRUCTIONS TO PROVIDE 3% RESERVATIONS
WITHOUT FAIL TO THE DISABLED PERSONS WERE COMMUNICATED TO ALL THE CONCERNED
DEPARTMENTS. |
|
03/09/2007 2487. |
GANGADHAR MANTHANI
(V) ARMOOR
(M) |
THE GOVERNMENT HAVE FORMED ROAD FROM
MANTHANI-SIDDAPUR, MANTHANI-AMDAPUR ROAD - TO FACILITATE FORMATION OF THIS
ROAD I HAVE GIVEN LAND FROM MY 10 ACRES - SIMILARLY MY NEIGHBOUR MUTHYAM
REDDY HAD ALSO ALLOWED FORMATION OF ROAD IN HIS LANDS - AFTER FORMATION OF
ROAD SRI MUTHYAM REDDY IS NOT ALLOWING
THE VILLAGE CATTLE TO PASS THROUGH THIS ROAD - THEREFORE, THE
SHEPHERDS ARE MOVING THE CATTLE FOR GRAZING PURPOSE FROM MY OTHER PATTA LAND
CONSISTING OF NINE ACRES CAUSING DAMAGE TO MY FIELDS - ONCE THE ROAD IS
FORMED IT WILL BECOME GOVT. ROAD AND SRI MUTHYAM REDDY CAN NOT STOP MOVING OF
CATTLE ON THIS ROAD - THEREFORE, KINDLY INSTRUCT SRI MUTHYAM REDDY NOT TO
OBSTRUCT MOVEMENT OF CATTLE ON THIS ROAD. |
THE E.E.(PR), NIZAMABAD HAD REPORTED THAT THE ROAD
WAS ACTUALLY EXECUTED BY E.E.(SRSP), POCHAMPAD. HOWEVER, AT THE TIME OF
INSPECTION THE ROAD WAS OPEN FOR ONE AND ALL AND THERE WERE NO OBSTRUCTIONS
AND RESTRICTIONS AS ALLEGED BY THE CALLER. |
|
03/09/2007 2488. |
SRINU DEVAKKAPET
(V) BHEEMGAL
(M) |
DEVAKKAPET VILLAGE OF BHEEMGAL MANDAL IS HAVING 4
TRIBAL HAMLETS - THE SARPANCH NAMELY SRI THARA PRAKSH, OF DEVAKKAPET G.P. IS
COLLECTING Rs.1000/- TO Rs.1500/- FROM EACH BENEFICIARY IDENTIFIED UNDER
INDIRAMMA HOUSING PROGRAMME - IN THIS VILLAGE AROUND 195 BENEFICIARIES ARE
IDENTIFIED AND SARPANCH HAD COLLECTED NEARLY Rs.2.00 LAKHS - KINDLY CAUSING
ENQUIRY IN TO THIS MATTER AND ARRANGE REFUND OF AMOUNT AND TAKE ACTION
AGAINST SARPANCH. SIMILARLY, MOST OF THE IDENTIFIED BENEFICIARIES ARE
INELIGIBLE, AS THEY ARE ALREADY HAVING OWN HOUSES - DESERVING POOR ARE NOT IDENTIFIED AND DENIED OF THIS GOVT.
HELP. |
THE D.P.O/ DM(H) HAD REPORTED THAT THE SARPANCH
HAD COLLECTED Rs. 48,000/- FROM THE INDIRAMMA BENEFICIARIES DURING THE MONTH
OF APRIL 2007 WITHOUT OBTAINING FROM G.P. AND WITHOUT FOLLOWING THE RULES
UNDER INDIRAMMA HOUSING PROGRAMME. SUBSEQUENTLY HE HAD REMITTED THE AMOUNT
THE G.P. ACCOUNT THROUGH TREASURY. SINCE, THERE WAS DELAY EVEN IN REMITTANCE
OF AMOUNT SHOW CAUSE NOTICE WERE ISSUED ON 17.09.07 VIDE LR.NO.173/07/B5. AS
SOON AS REPLY WAS RECEIVED FURTHER ACTION WOULD BE TAKEN AS PER SECTION 249
(6) OF P.R.ACT 1994. |
|
03/09/2007 2489. |
CHURCH
FATHER NANDIPET
(V) NANDIPET
(M) |
WE HAVE APPLIED FOR ALLOTMENT OF LAND FOR BURIAL
GROUND FOR CHRISTINE MINORITY COMMUNITY
- THE G.P. AFTER INSPECTION OF THE SITE FOUND THAT THE LAND IS
SUITABLE FOR BURIAL GROUND AND PASSED RESOLUTION FOR ALLOTMENT AND SUBMITTED
PROPOSAL TO R.D.O., NIZAMABAD - THE R.D.O. HAD INSPECTED THE LAND BUT
SANCTION PROCEEDINGS ARE NOT ISSUED - SIMILARLY, MUSLIM MINORITY COMMUNITY
MEMBERS HAVE ALSO APPLIED FOR BURIAL GROUND ALONG WITH US AND THEY WERE
ALLOTTED 2.20 ACRES - BUT OUR CASE IS STILL PENDING - KINDLY ARRANGE EARLY
ALLOTMENT. |
THE R.D.O., NIZAMABAD HAD REPORTED THAT PROPOSAL
FOR ALLOTMENT OF GOVT. LAND TO AN EXTENT OF 1.06 ACRES IN SY.NO.629/2 WERE
SUBMITTED TO THE COLLECTOR ON 19.12.2005. COLLECTORATE HAD CALLED FOR DETAILS
LIKE S.D. RECORD, MARKET VALUE, SALE PARTICULARS, BASIC VALUE AND
JUSTIFICATION REPORT. THESE DETAILS ARE AWAITED FROM THE TAHSILDAR, NAVIPET.
THE TAHSILDAR HAS BEEN REMINDED TO EXPEDITE THE PARTICULARS. AS SOON AS THEY
ARE RECEIVED THEY WOULD BE SUBMITTED TO THE COLLECTOR. |
|
03/09/2007 2490. |
AHMED
SYED WIFE SHKKARNAGAR
(V) BODHAN
(M) |
I AM WIFE OF AHMED SYED HEAD MASTER, URDU SCHOOL,
SHAKKARNAGAR - MY HUSBAND SERVICE BOOK WAS SUBMITTED IN DEO'S OFFICE FOR PAY
FIXATION - THOUGH TWO MONTHS ARE LAPSED PAY IS NOT FIXED AND SERVICE BOOK NOT
RETURNED - KINDLY ARRANGE TO FIX THE PAY IN THE REVISED PAY SCALES AND SEND
THE S.R. AS EARLY AS POSSIBLE. |
THE D.E.O. HAD REPORTED THAT PROPOSALS FOR
FIXATION OF PAY OF SRI AHMED SYED, ASSISTANT URDU U.P.S., SHAKKARNAGAR WERE SUBMITTED TO THE GOVT. VIDE REF. NO.
B3/3725/06, DATED 05.09.07 |
|
03/09/2007 2491. |
DUBBAKA
(V) DHARPALLY
(M) |
A ROAD IS FORMED FROM DUBBAK TO DHARPALLY VILLAGE
WITH AN ESTIMATED AMOUNT Rs.1.60 CRORES - ADJACENT TO OUR VILLAGE THERE IS A
RIVER AN AMOUNT OF Rs.16.00 LAKHS IS STATED TO BE EARMARKED FOR CONSTRUCTION
OF THE BRIDGE - ACCORDINGLY, THE CONTRACTOR HAD TAKEN UP DEEP PITS FOR
CONSTRUCTION OF BRIDGE - BUT, LATER IT WAS TOLD THAT NO AMOUNT IS SANCTIONED
FOR CONSTRUCTION OF BRIDGE - THEREFORE THE CONTRACTOR HAD ABANDONED THE WORK
- DUE TO RECENT HEAVY RAINS AND BLOCKING OF NATURAL FLOW ON ACCOUNT OF
DIGGING PIT THE SOIL EROSION TOOK PLACE AND WIDTH OF THE RIVER INCREASED -
THEREFORE, THE VILLAGERS ARE UNABLE TO CROSS THE RIVER AND USE THE ROAD - THE
ENTIRE AMOUNT SPENT ON THE ROAD HAS BECOME WASTE BY NOT CONSTRUCTING THE
BRIDGE - KINDLY ARRANGE TO COMPLETE THE CONSTRUCTION OF THE BRIDGE AS EARLY
AS POSSIBLE SO THAT THE ROAD CAN BE PUT TO USE. |
THE E.E.(PR) HAD REPORTED THAT FORMATION OF B.T.
ROAD FROM DHARPALLY TO CHELLAGARGA VIA. DUBBAK WAS SANCTIONED UNDER
P.M.G.S.Y. PHASE-IV WITH AN ESTIMATED COST OF Rs.162.00 LAKHS. THE TOTAL
LENGTH OF ROAD IS 10.50 K.M. THE PROPOSED BRIDGE IS AT DUBBAK REACH. AS PER
DESIGN REVISED PROPOSALS WERE SUBMITTED TO THE GOVT. TO INCREASE THE COST TO
Rs.240.00 LAKHS AND SANCTION IS AWAITED. HOWEVER, THE CONTRACTOR HAS FORMED
TEMPORARY ROAD DULY LAYING 1200 M.M. DIA PIPES ON THIS STREAM FOR EASY
PASSAGE AND TRANSPORTATION OF AGRICULTURAL PRODUCTS. NOW THE ROAD IS TRAFFIC
WORTHY. PERMANENT MEASURES WOULD BE TAKEN ON RECEIPT OF REVISED SANCTION. |
|
03/09/2007 2492. |
GOVINDPET
(V) ARMOOR
(M) |
IN OUR VILLAGE THE DRINKING WATER SUPPLY LINE FROM
BORE WELL TO O.H.S.R. HAS DEVELOPED CRACKS - THIS PIPELINE PASESS THROUGH
AGRICULTURAL FIELDS - DUE TO LEAKAGE POLLUTED WATER FROM THE FIELDS IS PUMPED
INTO O.H.S.R. AND SUBSEQUENTLY SUPPLIED THROUGH TAPS RESULTING HEALTH
PROBLEMS - SARPANCH AND G.P.P.S. HAVE NOT TAKEN ANY ACTION TO PLUG THE
LEAKAGES - KINDLY INSTRUCT THE CONCERNED TO REPLACE THE DAMAGE PIPE AND
SUPPLY SAFE WATER TO THE PUBLIC. |
THE S.E.(RWS) HAD REPORTED THAT THE LEAKAGES IN THE
PUMPING MAIN OF O.H.S.R. AT GOVINDPET VILLAGE OF ARMOOR MANDAL WERE RECTIFIED
AND NOW SAFE DRINKING WATER IS RESTORE TO THE VILLAGE. SINCE, THERE ARE MANY PIT TAPS, THE P.S.G.P. WAS
INSTRUCTED TO CLOSE ALL THE PIT TAPS TO AVOID POLLUTION OF DRINKING WATER. |
|
17/09/2007 2493. |
BAPU
REDDY EX-SARPANCH YADARAM
(V) DOMAKONDA
(M) |
I HAVE LAID PIPELINE UNDER R.W.S. SCHEME AT
SIVARAMIREDDYPALLI VILLAGE - AFTER COMPLETION OF THE WORK RICE COUPONS WERE
ISSUED BUT THE F.P.S. DEALER IS STATING THAT NO RICE IS ALLOTTED FOR SUPPLY
ON THE COUPONS - KINDLY ARRANGE TO RELEASE RICE AS EARLY AS POSSIBLE. |
THE S.E.(RWS) HAVE INFORMED THAT THE RELEVANT M.B.
IS NOT READILY TRACEABLE AND EFFORTS ARE BEING MADE TO LOCATE THE SAME. AS
SOON AS THE M.B. IS TRACED PAYMENT WOULD BE ARRANGED. FURTHER THE S.E.(RWS) HAD REPORTED THAT THE M.B.
IS TRACED AND RICE COULD NOT BE RELEASE ON THE COUPONS FOR WANT OF STOCKS IN
THE M.L.S. POINT. WHILE ENCLOSING COUPONS THE D.M. C.S. CORPORATION WAS
REQUESTED TO RELEASE REQUISIT RICE FOR PAYMENT TO THE LABOUR. |
|
17/09/2007 2494. |
ASHWAQ
AHMED BORGAON
(V) RENJAL
(M) |
GOVT. IS IMPLEMENTING 3% RESERVATIONS FOR DISABLED
PERSONS IN ALL SOCIO ECONOMICS SCHEMES - AFTER RELEASE OF MARGIN MONEY/
SUBSIDY BANKERS ARE REFUSING TO ADVANCE LOANS ON THE PLEA THAT THERE IS NO
QUOTA FIXED FOR SANCTION OF LOANS IN BANKS - KINDLY ISSUE SUITABLE
INSTRUCTIONS TO ALL BANKS TO ENSURE SANCTION OF 3% LOANS TO THE DISABLED
PERSONS, IF NOT MORE. |
THE L.D.M. HAD REPORTED THAT HE HAD ADVISED ALL
THE BANKS TO COMPILE WITH GOVT. OF INDIA DIRECTIONS TO IMPLEMENT 3%
RESERVATIONS TO DISABLE PEOPLE IN ALL GOVT. SPONSORED PROGRAMMES. |
|
17/09/2007 2495. |
VITTAL
RAO SARPANCH ISROJIWADI
(V) KAMAREDDY
(M) |
I AM SARPANCH OF ISROJIWADI OF KAMAREDDY MANDAL -
SUPPLY F DRINKING WATER TO THE PUBLIC IN THE VILLAGE RESTS WITH G.P. HEADED
BY SARPANCH - BUT, IN THIS VILLAGE, THE VILLAGE DEVELOPMENT COMMITTEE MEMBERS
HAVE FORCIBLY SEIZED DRINKING WATER SUPPLY ON 05.09.2007 IN TO THEIR CONTROL
AND ORGANISING SUPPLY - I HAVE FILED COMPLAINT BEFORE THE M.P.D.O.,
KAMAREDDY/ D.P.O., NIZAMABAD - THE M.P.D.O. HAD ENQUIRED INTO THE MATTER AND
FOUND THAT THE ACT OF V.D.C. IS ILLEGAL AND INSTRUCTED THEM NOT TO INTERFERE
WITH THE FUNCTIONING OF G.P. AND SUBMITTED REPORT TO D.P.O. - THE V.D.C.
MEMBERS REFUSED TO COMPLY WITH THE INSTRUCTIONS OF M.P.D.O. - THEREFORE, I
HAVE APPROACHED D.P.O. - THE D.P.O. STATED THAT HE WOULD OBTAIN PERMISSION OF
THE COLLECTOR AND TAKE FURTHER ACTION, TILL SUCH TIME HE CAN NOT SOLVE THE
PROBLEM - PLEASE INTERVENE AND DO JUSTICE
TO THE SARPANCH AND G.P. |
THE D.P.O. HAD REPORTED THAT THE M.P.D.O.,
KAMAREDDY WAS INSTRUCTED TO HAND OVER WATER SUPPLY TO THE CONSTITUTOR G.P.
AND ENSURE NON-INTERFERENCE OF V.D.C. IN THE FUNCTIONING OF G.P. IF THE
V.D.C. REFUSES COMPLAINT MAY BE FILED WITH THE LOCAL POLICE AND ENSURE
COMPLIANCE. ON 28.09.2007 THE D.P.O. HAS VISITED THE VILLAGE AND DISCUSSED
MATTER WITH V.D.C. ABOUT THE SUPPLY OF DRINKING WATER IN THE VILLAGE AND IT WAS DECIDED TO HAND OVER THE SUPPLY
OF DRINKING WATER THROUGH G.P. ONLY. NOW THE DRINKING WATER IS SUPPLYING
THROUGH G.P. |
|
17/09/2007 2496. |
NAMBUDRI
PRASAD LAKKAMPALLY
(V) NANDIPET
(M) |
I WAS ASSIGNED 0.20 GTS. OF LAND WHICH I HAVE
PLOUGHED EARLIER - AFTER ASSIGNMENT PHYSICAL POSSESSION NOT HANDED OVER DULY
FIXING BOUNDARIES - WHEN I WENT TO PLOUGHED THE LAND THIS YEAR MY NEIGHBOUR
HAD RAISED AN OBJECTION STATING THAT THIS LAND BELONGS TO HIM - I HAVE
REPRESENTED BEFORE THE TAHSILDAR, NANDIPET WHO INSTRUCTED THE SURVEYOR FOR
DEMARCATION AND HANDING OVER PHYSICAL POSSESSION - BUT THE SURVEYOR IS
DODGING - KINDLY ISSUE SUITABLE INSTRUCTIONS TO THE TAHSILDAR TO HANDOVER
PHYSICAL POSSESSION DULY FIXING BOUNDARIES SO AS TO ENABLE ME TO CULTIVATE
THE LAND AND EKE OUT LIVELIHOOD. THE COLLECTOR WAS KIND ENOUGH TO ORDER FOR
SANCTION OF PENSIONS TO CHINDU ARTISTS - DUE TO PARTICIPATION OF OFFICERS IN
2ND PHASE INDIRAMMA PROGRAMME THEY ARE NOT AVAILABLE TO COMPLETE FORMALITIES
- KINDLY ARRANGE TO EXTEND THE DATE. |
THE TAHSILDAR, NANDIPET HAD REPORTED THAT THE
CALLER SRI P.NAMBUDRI PRASAD WAS ASSIGNED 2.20 ACRES OF LAND IN SY.NO.189 OF
LAKKAMPALLY VILLAGE. THE SURVEYOR HAD INSPECTED THE LAND AND SHOWN PHYSICAL
POSSESSION. BUT, THE CALLER REFUSE TO TAKE PHYSICAL POSSESSION AND DEMANDING
TO HAND OVER LAND IN SY.NO.432 WHICH WAS ALREADY ASSIGNED TO ANOTHER
BENEFICIARY WHO IS IN PHYSICAL POSSESSION AND CULTIVATING THE LAND. REGARDING, SANCTION OF PENSIONS TO CHINDU ARTISTS
THE SAME WOULD BE CONSIDERED IN 2ND PHASE INDIRAMMA PROGRAMME. |
|
17/09/2007 2497. |
RANGAMANI AMDAPUR
(V) BODHAN
(M) |
IN OUR VILLAGE BASIC FACILITIES LIKE; ROADS,
DRAINAGES ARE NOT AVAILABLE - SO FAR NO ROAD OR DRAIN IS SANCTIONED BY THE
GOVERNMENT - MORE OVER, MOST OF THE HOUSES ARE IN DILAPIDATED CONDITION -
REQUIRES SANCTION OF NEW HOUSES - LAST MONDAY WE MET THE COLLECTOR PERSONALLY
AND SUBMITTED REPRESENTATION - THE COLLECTOR WAS KIND ENOUGH TO INFORM THAT
AN OFFICER WOULD BE SENT FOR VERIFICATION AND FURTHER ACTION WOULD BE TAKEN
ON HIS REPORT - BUT SO FAR NO OFFICER HAD VISITED - HENCE, THIS REMINDER. |
THE D.P.O. HAD REPORTED THAT INSTRUCTIONS HAS BEEN
GIVEN TO THE P.S.G.P. TO CLEAN THE ROADS & DRAINAGES. IN THE VILLAGE SOME
HOUSES ARE DILAPIDATED CONDITIONS WHICH WILL BE TAKEN INTO CONSIDERATION
UNDER INDIRAMMA VILLAGE PROGRAMME. |
|
17/09/2007 2498. |
P.BASWANTH
RAO GODEMEGAON
(V) PITLAM
(M) |
I WAS ISSUED PINK RATION CARD IN WHICH MY SURNAME
IS RECORDED AS BILADAR AS AGAINST PATOLLA - FOR ANY VERIFICATION OF IDENTITY
RATION CARD IS BEING ASKED - IN VIEW OF THIS ERROR I AM PUT TO PROBLEMS -
KINDLY ARRANGE TO RECTIFY MY SURNAME. |
THE TAHSILDAR, PITLAM HAD REPORTED THAT HE HAD
ENQUIRED IN THE VILLAGE ABOUT THE SURNAME OF THE CALLER SRI BASVANTH RAO S/O
MOGULAPPA, DRIVER IN APSRTC, BANSWADA DEPOT. IN HIS PINK RATION CARD HIS
SURNAME MENTIONED AS BILADAR AGAINST ACTUAL SURNAME OF PATLOLLA. SINCE THE
CARD IS ISSUED COMPUTERISED AND ISSUED AT D.P.L. DULY LAMINATING IT MAY NOT
BE POSSIBLE TO CARRY OUT CORRECTION.
HIS REQUEST WOULD BE CONSIDER WHEN D.P.L. CENTRE IS RE-ESTABLISHED. |
|
17/09/2007 2499. |
NARENDER H.NO.3-9-67,AMBEDKAR
NAGAR KAMAREDDY
(V) KAMAREDDY
(M) |
SNEHA MAHILA SANGAM IS FUNCTIONING FOR THE PAST
SEVEN YEARS AT AMBEDKAR COLONY OF KAMAREDDY TOWN - THEY ARE SAVING EVERY
MONTH REGULARLY BUT SO FAR REVOLVING FUND WAS SANCTIONED ONLY ONCE - OUR
REQUEST FOR SANCTION OF REVOLVING FUND AGAIN IS FALLING INTO DEAF EARS OF THE
OFFICERS AND SEVERAL REPRESENTATIONS DID NOT YIELD ANY RESULT - KINDLY
INTERVENE ARRANGE FOR VERIFICATION AND SANCTION OF REVOLVING FUND AT AN EARLY
DATE. |
THE P.D.(DRDA) HAD REPORTED THAT SNEHA MAHILA
SOCIETY, KAMAREDDY IS NOT MAINTAINING RECORD PROPERLY AND NOT SAVING SINCE
PAST THREE MONTHS. ALL THE 14 MEMBERS IN THE GROUP ARE SANCTIONED GAS
CONNECTIONS UNDER DEEPAM PROGRAMME AND THEY WERE SANCTIONED REVOLVING FUND OF
RS.14,000/- ON 26.12.2006 ONLY. HE FURTHER STATED THAT THEY WERE ADVISED TO
CHANGE THEIR ACCOUNT FROM COOP. BANK TO S.B.H., KAMAREDDY AND EACH GROUP IS
SANCTIONED MARGIN MONEY ONCE ONLY. |
|
17/09/2007 2500. |
MEKA
RAJANNA PALDA
(V) NIZAMABAD
(M) |
I AM A FARMER FROM PALDA VILLAGE AND AVAILING CROP
LOAN FOR THE PAST 10 YEARS FROM GRAMEENA BANK AND REPAYING PROMPTLY - THIS
YEAR I HAVE FILED LOAN APPLICATION FOR RELEASE OF CROP LOAN BUT SO FAR IT IS
NOT SANCTIONED AND THE MANAGER IS REFUSING TO SANCTION - ANTICIPATING
SANCTION OF CROP LOAN I HAVE AVAILED FERTILIZER ETC. ON CREDIT BASIS AND THE
DEALERS ARE PRESSING FOR PAYMENT - KINDLY INSTRUCT THE MANAGER GRAMEENA BANK
TO RELEASE CROP LOAN IMMEDIATELY. |
THE L.D.M. HAD REPORTED THAT THE BRANCH MANAGER,
DGB., KONDUR BRANCH HAD INFORMED THAT THE CALLER WAS HOLDING K.C.C. ACCOUNT
NO. 42 WITH LIMIT OF Rs.40,000/- UNDER TIE UP WITH N.C.S.F. HE CLEAR THE
EARLIER LOAN THROUGH SALE PROCEEDS OF CANE THROUGH N.C.S.F. ON 21.08.07 AND
APPLIED FOR FRESH LOAN ON 22.08.07. HIS LOAN DOCUMENTS WERE DATED 06.02.2004
AS SUCH HE WAS ADVISED TO FILE FRESH SET OF LOAN APPLICATION FOR SANCTION OF
LOAN WITH THE REFUSE TO COMPILE. HOWEVER, ON SUBMITTING 17.09.07 HE CAME WITH
SET OF NEW DOCUMENTS WHICH WERE ACCEPTED AND LOAN SANCTIONED. |
|
01/10/2007 2501. |
REDDYPET
(V) MACHAREDDY
(M) |
LIBRARY FOR THIS VILLAGE WAS ASSURED 2 YEARS BACK
IN THE PRESENCE OF HON'BLE MINISTER AND IT WAS NOT SANCTIONED - AGAIN TWO
MONTHS BACK THE CHAIRMAN, ZGS, PROMISED TO SANCTION LIBRARY ON PRIORITY BASIS
- BUT SO FAR NO ACTION IS TAKEN IN THIS REGARD - KINDLY ARRANGE SANCTION OF
LIBRARY AS EARLY AS POSSIBLE AS THE VILLAGERS ARE WAITING FOR THE PAST TWO
YEARS. |
THE SECRETARY, Z.G.S. HAD REPORTED THAT THE
HON'BLE MINISTER HAD ASSURED SHIFT THE DEFUNCT VILLAGE LIBRARY TO REDDYPET -
THE DISTRICT GENERAL BODY MEETING OF THE LIBRARY IS SCHEDUELED TO BE HELD IN
3RD WEEK OF OCTOBER IN WHICH A RESOLUTION WILL BE PASSED IN THIS REGARD AND
DEFUNCT VILLAGE LIBRARY WOULD BE SHIFTED TO REDDYPET AS THERE IS A BAN ON
APPOINTMENT OF PART TIME EMPLOYEE TO LOOK AFTER NEW LIBRARIES. |
|
01/10/2007 2502. |
ANIL
KUMAR WARD
MEMBER YELLAREDDY
(V) YELLAREDDY
(M) |
THE SARPANCH, YELLAREDDY HAS RECORDED CONSTRUCTION
OF AROUND 80 PLATFORMS AROUND DRINKING WATER TAPS - OUT OF THESE 80 PLATFORMS
AROUND 20 PLOTFORMS WERE CONSTRUCTED SOME 2 ½ YEARS BACK AND AMOUNT PAID - HE
HAS AGAIN RECORDED THESE PLATFORMS AND MISUSED THE AMOUNT FOR HIS PERSONAL
NEEDS - KINDLY ENQUIRE AND TAKE NECESSARY ACTION. |
THE DY.CEO ENQUIRED IN THE MATTER AND PHYSICALLY
VERIFIED THE PLATFORMS CONSTRUCTED FOUND THAT (13) PLATFORMS WERE WRONGLY
RECORDED AS NEWLY CONSTRUCTED WHERE AS, THE SAME WERE EITHER OLD
CONSTRUCTIONS OR DOUBLE RECORDED. THUS Rs.13,000/- WERE WRONGLY CLAIMED BY
THE SARPANCH AND THIS AMOUNT SHOULD BE RECOVER FROM SARPANCH AND REMITTED TO
G.P. ACCOUNT. SIMILARLY, THE DY.CEO OBSERVED THAT THE A.E.
R.W.S. HAD FAILED IN DISCHARGING HIS PRIMARY DUTY FOR PHYSICAL VERIFICATION
AND CHECK MEASURING. THE DY.EE (RWS) HAD ALSO FAILED TO CHECK AT LEAST 10% OF
THE WORKS AND THUS GIVEN SCOPE FOR WRONG CLAIM AND MAKING A COMPLAINT AGAINST
THE SARPANCH AND RECOMMENDED FOR AWARDING WARNING TO THE R.W.S. STAFF. |
|
01/10/2007 2503. |
VENKATESHAM KAMAREDDY
(V) KAMAREDDY
(M) |
THERE IS A BORE WELL BELONGING INTO MUNICIPALITY
JUST BEHIND THE EE(PR), KAMAREDDY OFFICE - THIS BORE HAS DEVELOPED HUGE LEAKAGES
RESULTING FORMATION OF SMALL POND THROUGH WHICH POLLUTED WATER IS BEING
SUPPLIED TO THE LOCALITY PEOPLE - THIS IS LEADING TO SEVER HEALTH PROBLEMS -
FURTHER, THE POND FARMED IS OVER FLOWING AND WATER IS STAGNATED ON THE ROAD
CAUSING LOT OF INCONVENIENCE TO THE ROAD USERS AND ALSO CAUSING DAMAGES TO
THE ROAD - THERE IS NO RESPONSE FROM THE MUNICIPALITY DESPITE SEVERAL
REPRESENTATIONS - KINDLY ENQUIRE AND SOLVE THE PROBLEM. |
THE COMMISSIONER, M.C., KAMAREDDY HAD REPORTED
THAT THE LEAKAGES WERE ARRESTED AND THE ROAD DAMAGED ON ACCOUNT OF STAGNATED
WATER IS ALSO REPAIRED. NOW THERE IS NO PROBLEM IN SUPPLY OF SAFE DRINKING
WATER AND USAGE OF ROAD. |
|
01/10/2007 2504. |
P.HANMANDLOO SAILOO BOMMANDEVPALLY
(V) BIRKUR
(M) |
MY FATHER P.SAILOO HAD DIED ON 09.01.2007 DUE TO
SNAKE BITE - NECESSARY PROPOSALS ALONG WITH F.I.R. AND P.M.R. WERE SUBMITTED
TO THE COLLECTOR IN FILE NO. E/31/12/2007 - BUT SO FAR SANCTION IS NOT
ACCORDED - KINDLY ARRANGE IMMEDIATE SANCTION OF RELIEF UNDER APATHBANDU
SCHEME AND HELP THE FAMILY. |
THE D.R.O. HAD REPORTED THAT THE TAHSILDAR BIRKUR
HAD SENT TWO BITE MARK TISSUES WERE SENT TO CHEMICAL ANALYSIS AT F.S.L.,
HYDERABAD TO KNOW THE ACTUAL CAUSE OF DEATH. THE REPORT IS AWAITED. AS SUCH,
SANCTION OF RELIEF UNDER APATHBANDU SCHEME IS KEPT PENDING. AS SOON AS THE
F.S.L. REPORT IS RECEIVED FURTHER ACTION WOULD BE TAKEN. |
|
01/10/2007 2505. |
VITTAL
RAO SARPANCH ISROJIWADI
(V) KAMAREDDY
(M) |
IN LAST D.Y.C. I.E. ON 17.09.2007 I HAVE FILED
COMPLAINT REGARDING UNAUTHORISED AUCTION OF WATER SUPPLY IN THE VILLAGE BY
THE VILLAGE DEVELOPMENT COMMITTEE - RESPONDING TO THIS, THE COLLECTOR HAD
SENT D.P.O. WHO VISITED THIS VILLAGE ON 28.09.07 AND ARRANGED A MEETING WITH
THE V.D.C. MEMBERS AND SARPANCH, G.P. MEMBERS - THE D.P.O. HAD INFORMED
V.D.C. MEMBERS THAT AUCTIONING OF WATER SUPPLY SYSTEM BY THE COMMITTEE IS
ILLEGAL AND SHOULD BE IMMEDIATELY HANDED OVER TO SARPANCH - THE V.D.C.
MEMBERS HAVE AGREED - NEXT DAY WHEN I SENT THE WATER BOY FOR SUPPLY OF
DRINKING WATER THE PRIVATE PERSON REFUSED TO HANDOVER THE SAME - I HAVE FILED
A COMPLAINT WITH THE D.S.P., KAMAREDDY BUT NO ACTION IS TAKEN - KINDLY
INTERVENE AND DO JUSTICE. |
THE D.P.O. HAD REPORTED THAT A COMPLAINT WAS FILED
WITH THE D.S.P. KAMAREDDY TO TAKE UP APPROPRIATE ACTION AGAINST THE V.D.C.
MEMBERS. HOWEVER, THE M.P.D.O. HAD REPORTED THAT THE
PROBLEM WAS SOLVED. D |
|
01/10/2007 2506. |
GAYASUDDIN ZPTC YELLAREDDY
(V) YELLAREDDY
(M) |
IN YELLAREDDY THE VILLAGERS ARE FACING ACUTE
SCARCITY FOR L.P.G. CYLINDERS - SIMILARLY, BOARDERS IN THE HOSTEL ARE ALSO
FACING SHORTAGE PROBLEM - IN VIEW OF THE ENSUING RAMZAN AND OTHER FESTIVALS
KINDLY ARRANGE TO DISPATCH ONE LORRY LOAD OF CYLINDERS TO DAY IT SELF TO EASE
THE PROBLEM. |
THE D.S.O. HAD REPORTED THAT THE V.C.&M.D. HAD
ISSUED ORDERS FOR CLOSER OF B.P.C.L. OUT LET AT YELLAREDDY AND HAND OVER THE
SAME TO M/s BALAJI GAS AGENCY AT KAMAREDDY. SINCE THE CONSUMERS CONSISTING OF
504 GENERAL 2893 DEEPAM TOTALLING 3397 WERE FACING LOT INCONVENIENCE IT WAS
ORDER TO BE TRANSFERRED M/s GAYATRI GAS AGENCY, H.P.C.L., YELLAREDDY. SINCE
THERE IS SOME PROBLEM IN TRANSFERRING ALL THE CONNECTIONS AND OBTAINING
SUPPLY OF CYLINDERS, THE JOINT COLLECTOR HAD INSTRUCT THE D.M. APSCCL,
NIZAMABAD TO REOPEN THE CORPORATION OUTLET AT YELLAREDDY FOR WHICH NECESSARY
STAFF WOULD BE PROVIDED, TO AVOID INCONVENIENCE TO THE CONSUMERS. |
|
01/10/2007 2507. |
BEGARI
BHOOMAIAH GOVOOR
(V) VARNI
(M) |
IN AN ACCIDENTAL FIRE ACCIDENT SOME TWO YEARS BACK
MY MILCH ANIMALS HAVE PERISHED, WHICH I BOUGHT PERSONALLY - SINCE, THEN I AM
TRYING FOR LOAN THROUGH S.C. CORPORATION AND MET E.D. SEVERAL TIMES - THE
E.D. ASSURED TO RELEASE SUBSIDY PROVIDED I SECURE CONSENT FROM THE AREA BANK
- THE BANKER IS REFUSING TO GIVE CONSENT - KINDLY INTERVENE AND INSTRUCT THE
BANK MANAGER, VARNI TO GIVE CONSENT AND HELP MY POOR FAMILY. |
THE E.D.(S.C. CORPORATION) HAD REPORTED THAT SRI
BEGARI MUTAIAH S/o BHOOMAIAH, CALLER WAS FINANCED FOR S.T.D. BOOTH ON
16.08.2005. THE REPAYMENT IS IRREGULAR AND NOT PAID ANY INSTALMENT SINCE PAST
SIX MONTHS. HOWEVER, THE MANAGER HAD AGREED TO SANCTION LOAN IF THE APPLICATION
OF THE CALLER IS PROCESSED TO JOINT IDENTIFICATION PROGRAMME FOR THE YEAR
2007-2008. THE CALLER WAS INFORMED TO ATTEND THE MANDAL
COMMITTEE FOR IDENTIFICATION OF BENEFICIARIES TO CONSIDER SANCTION OF LOAN. |
|
01/10/2007 2508. |
BHOOLAXMI
CAMP (V) BODHAN
(M) |
MY UNCLE KOTA PICHI REDDY DIED IN 2006 WHEN AN
UNKNOWN VEHICLE HIT HIM AND SPED AWAY - A CASE OF "HIT AND RUN" WAS
BOOKED AND I HAVE APPLIED FOR PAYMENT OF SOLATIUM FUND IN COLLECTOR'S OFFICE
- COLLECTORATE HAD CALLED FOR A REPORT FROM THE TAHSILDAR - THE REPORT IS
STILL AWAITED FROM TAHSILDAR, BODAHN - KINDLY INSTRUCT THE TAHSILDAR, BODHAN
TO EXPEDITE THE REPORT. |
THE D.R.O. HAD REPORTED THAT THE FINAL REPORT
CALLED FOR FROM THE S.I. OF POLICE, YEDPALLY IS STILL AWAITED. |
|
01/10/2007 2509. |
KRISHNA
KUMAR KAMMARPALLY
(V) KAMMARPALLY
(M) |
WE ARE GETTING SAFE WATER FROM HEALTHFUL PURIFIED
WATER LOCATED AT BASHEERABAD VILLAGE OF KAMMARPALLY MANDAL ON PAYMENT - BUT
IN THIS WATER GERMS ARE BEING APPEARED - WHEN WE QUESTIONED ABOUT THE PURITY
OF WATER WITH THE OWNER HE IS THREATENING WITH DIRE CONSEQUENCES - KINDLY
INSTRUCT THE CONCERNED TO CLOSE THE PLANT IF FAILED TO MAINTAIN I.S.I.
STANDARDS |
THE D.P.O. HAD REPORTED THAT M/s HEALTHFUL WATER
PLANT IS SUPPLYING WATER WITH I.S.I. STANDARDS. HOWEVER, THE COMPLAINT SUN
WHILE BRINGING THE WATER CAN ACCIDENTALLY SLIPPED IT AND THE WATER THE CAN
LEAKED OUT. THEREFORE, HE FILLED THE CAN WITH WATER FROM A WELL AND THEREFORE
THIS COMPLAINT WAS FILED. HOWEVER, THE FACT CAME TO LIGHT AFTER TWO DAYS OF
FILING COMPLAINT IN D.Y.C. ENQUIRIES WITH OTHERS REVILED THAT HEALTHFUL WATER
IS SAFE AND NOT CONTAMINATED AND REQUESTED NOT TO TAKE ANY ACTION AGAINST THE
PLOT. HOWEVER, WATER SAMPLES WERE DRAWN AND SENT TO S.E.(RWS), NIZAMABAD FOR
TESTING. |
|
01/10/2007 2510. |
SIRIKONDA
(V) SIRIKONDA
(M) |
IN SIRIKONDA MANDAL HEADQUARTERS SELECTION OF
BENEFICIARIES UNDER INDIRAMMA HOUSING PROGRAMME IS NOT BEING DONE PROPERLY -
ELIGIBLE PERSONS ARE IGNORED AND INELIGIBLE PERSONS AND THOSE ALREADY HAVING
HOUSES ARE BEING SELECTED - KINDLY VERIFY THE ENTIRE SELECTION LIST FINALISED
AND DO JUSTICE TO ELIGIBLE PERSONS DULY DELETING INELIGIBLE PERSONS. |
THE D.M. (HOUSING) WAS INSTRUCTED TO VERIFY THE
BENEFICIARY LIST AND SUBMIT REPORT. HOWEVER, THE D.M. INSTEAD OF VERIFYING
THE LIST REFERRED THE MATTER TO THE C.E.O.(ZP) AND M.P.D.O., SIRIKONDA FOR
VERIFICATION AGAINST WHICH AGENCY THIS COMPLAINT WAS FILED. |
|
01/10/2007 2511. |
PRABHAKAR
DESAI RUDRUR
(V) VARNI
(M) |
I WAS ISSUED A WHITE RATION CARD AND SUBSEQUENTLY
IT WAS CANCELLED BECAUSE DESAI IS INCLUDED MY NAME - I AM A SMALL FARMER
HAVING 2.00 ACRES LAND AND TOTALLY DEPENDING ON AGRICULTURE - I HAVE NO OTHER
SOURCE OF INCOME - KINDLY ENQUIRE AND DO JUSTICE. |
THE D.S.O. HAD REPORTED THAT THE REQUEST OF THE
CALLER TO ISSUE WHITE RATION CARD IS GENUINE IN AND WOULD BE CONSIDERED
SHORTLY. |
|
01/10/2007 2512. |
SATYANANDAM PERKIT
(V) ARMOOR
(M) |
THERE IS A DISTRIBUTORY 82/7 IN PERKIT VILLAGE
WITH A LENGTH OF 3.00 K.Ms. - FUNDS WERE SANCTIONED FOR DESILTING OF CANAL -
OUT OF 3 K.Ms. LENGTH DESILTING IS DONE UP TO 2 ½ K.Ms. AND THE WORK IS
STOPPED FOR THE REMAINING ½ K.M. - KINDLY ARRANGE FOR DESALTING THE REMAINING
½ K.M. SO THAT THE TAIL END FARMERS RECEIVE CANAL WATER. |
THE E.E.(IB) HAD REPORTED THAT IT IS A FACT THAT
THE WORK WAS COMPLETED UP TO 2 ½ K.Ms. FROM D-52 TO D-82 FURTHER WORK COULD
NOT BE DONE AS SRI MUTHENNA OBJECTED FOR TAKING UP OF DE-SILTING WORK IN HIS
FIELD. THE MATTER WAS REFERRED TO THE TAHSILDAR, ARMOOR FOR DEMARCATION OF
CANAL BOUNDARY. THE DY.E.E. INSPECTED THE SITE ON 09.10.2007 IN THE PRESENCE
OF SATYANANDAM, CALLER, GANGAREDDY, PRESIDENT, WUA AND MUTHENNA AYACTDAR. THE
AYACUTDAR AGREED TO VACATE THE LAND SUBJECT TO EXISTENCE OF CANAL IN
IRRIGATION MAP. THE MATTER WAS RESOLVED AND THE WORK WOULD BE RESUMED FROM
15.10.2007 ONWARDS. |
|
15/10/2007 2513. |
RAJESHWAR MUPKAL
(V) BALKONDA
(M) |
SOME OF THE HARIJANS AND WEAKER SECTION OF SOCIETY
WERE ASSIGNED GOVT. LAND SOME 30 YEARS BACK - DUE TO POOR CONDITION AND LACK
OF BANK LOANS WE COULD NOT CULTIVATE THE LAND - DURING THIS KHARIF SEASON WE
WENT TO THE LAND FOR PLOUGHING - BUT VILLAGE HIGHER CASTE GURADI KAPU MEMBERS
HAVE OBJECTED OUR ENTRY AND NOT ALLOWED US TO TAKE UP AGRICULTURAL WORK - WE
ARE HAVING PATTA CERTIFICATES, PPBs & TDs. - REQUESTED THE TAHSILDAR AND
S.I. TO DO JUSTICE - BUT GURADIKAPU MEMBERS ARE REFUSING TO HANDOVER THE LAND
- KINDLY ENQUIRE AND DO JUSTICE. |
THE TAHSILDAR, BALKONDA HAD REPORTED THAT GOVT.
LAND IN SY.NO. 125 AND 144 WAS ASSIGNED TO 9 BENEFICIARIES SOME 40 YEARS
BACK. SINCE THIS LAND WAS NOT DEVELOP AND BROUGHT UNDER CULTIVATION
GURUDIKAPU MEMBERS OF VILLAGE HAVE BEEN USING THIS LAND FOR GRAZING PURPOSE
FOR THEIR CATTLE. AT PRESENT THE LAND IN QUESTION IS COVERED WITH TREES AND
BUSHES. I HAVE REQUESTED THE ASSIGNEES TO CLEAR THE UNWANTED GROWTH SO THAT
SURVEY COULD BE DONE AND PHYSICAL POSSESSION HANDED OVER. THE TAHSILDAR HAS
ALSO REQUESTED M.P.D.O., BALKONDA TO TAKE UP THIS LAND AND DEVELOP UNDER
E.G.S. PROGRAMME/ CLDP SCHEME. THE TAHSILDAR HAS ALSO CONVENED A MEETING IN
THE VILLAGE AND INSTRUCTED NOT TO CREATE ANY PROBLEM IN THE CLEARANCE OF
TREES AND BUSHES. |
|
15/10/2007 2514. |
CHINNA
DASU KISAN
NAGAR (V) BALKONDA
(M) |
IN KISAN NAGAR WARD NO.11 WAS RESERVED FOR S.Cs. -
THE ELECTED CANDIDATE HAD LEFT FOR DUBAI ONE YEAR BACK AND THERE IS NO OTHER
PERSON TO REPRESENT THE PROBLEMS OF THE WARD IN THE G.P. MEETING - THEREFORE,
THE WARD MEMBERS HAVE UNANIMOUSLY DECIDED ONE NAME AND REQUESTED THE M.P.D.O.
& SARPANCH TO DECLARE HIM AS ELECTED UNANIMOUSLY - BUT THEY ARE REFUSING
TO DO SO - KINDLY INTERVENE AND DO JUSTICE. |
THE D.P.O. HAD REPORTED THAT A PROPOSAL WAS
SUBMITTED TO THE STATE ELECTION COMMISSION TO NOTIFY THIS VACANCY IN WARD
NO.11 OF KISANNAGAR VILLAGE. AS SOON AS THE VACANCY IS NOTIFIED ACTION WOULD
BE TAKEN AS PER RULES. |
|
15/10/2007 2515. |
GANESH PIPRI
NAGAR ARMOOR
(V) ARMOOR
(M) |
IN ARMOOR MUNICIPALITY ON WAY TO PIPRI, SENDHI
SHOP IS OPENED JUST IN FRONT OF PUBLIC TAP - SINCE CONSUMERS ARE DRINKING
SENDHI ON THE ROAD IT HAS BECOME VERY DIFFICULT FOR THE WOMEN FOLK TO FETCH
WATER FROM THE PUBLIC TAP AND ALSO TO THE PASSERS BY - EARLIER ALSO A
COMPLAINT WAS FILED IN THIS REGARD IN D.Y.C. BUT THE OFFICIAL OF EXCISE
DEPARTMENT FAILED TO TAKE ANY ACTION - KINDLY ARRANGE TO SHIFT THE SENDHI
SHOP TO OUTSKIRTS OF MUNICIPALITY. |
THE SUPDT. (P&E), NIZAMABAD HAD REPORTED THAT
THE MATTER WAS ENQUIRED IN THE LOCALITY WHERE SHOP NO.2 IS EXISTING. THE
PREMISES OF THE SHOP IS BOUNDED WITH THE HIGH COMPOUND WALL AND THERE IS NO
PROBLEM TO ANY ONE IN THE COLONY INCLUDING WOMEN WHO DRAW WATER FROM THE NEAR
BY WATER TANK. THE LOCALITY ELDERS AND WOMEN HAS STATED THAT SRI GANESH HAS
FILED COMPLAINT FOR SOME OTHER REASON WHICH IS NOT RELEVANT TO CAUSING OF
INCONVENIENCE TO THE PUBLIC AND WOMEN IN VIEW OF THE ABOVE FINDINGS IT IS
PROPOSED TO CLOSE THE COMPLAINT. |
|
15/10/2007 2516. |
SRINIVAS NODAL
PRERAK, C.E.C. JAKRANPALLY
(V) JAKRANPALLY
(M) |
I AM A NODAL PRERAK IN JAKRANPALLY MANDAL -
HONORARIUM WAS PAID UPTO MARCH 2007 - THERE AFTER, NO HONORARIUM IS RELEASED
- I AM A PHYSICALLY DISABLED PERSON AND FACING LOT OF PROBLEMS FOR WANT OF
MONEY - KINDLY ARRANGE TO RELEASE HONORARIUM FROM APRIL TO SEPTEMBER 2007 AS
EARLY AS POSSIBLE. |
THE D.D. ( ADULT EDUCATION) HAD REPORTED THAT THE
GOVT. OF INDIA HAVE RELEASED FUNDS UP TO MARCH 2007 AND ACCORDINGLY
HONORARIUM WAS AID TO THE PRERAKS UPTO MARCH. THEREAFTER NO FUNDS ARE
RELEASED GOVT. OF INDIA. AS SOON AS FUNDS ARE RELEASED HONORARIUM WOULD BE
PAID. |
|
15/10/2007 2517. |
NANDIPET
(V) NANDIPET
(M) |
IN NANDIPET VILLAGE 12TH FINANCE FUNDS WERE
GROSSLY MISUSED BY THE SARPANCH, P.S.G.P. AND A.E. (RWS) - IN THIS REGARD WE
HAVE FILED A WRITTEN COMPLAINT PERSONALLY ON 09.10.2007 AND THE COLLECTOR WAS
PLEASED TO ORDER FOR ENQUIRY BY THE D.P.O. - BUT, SO FAR NO ENQUIRY IS
STARTED - KINDLY ARRANGE FOR IMMEDIATE ENQUIRY AND DO JUSTICE FOR THE VILLAGE
DEVELOPMENT. |
THE D.P.O. HAD REPORTED THAT TO OVER COME DRINKING
WATER SCARCITY IN THE VILLAGE. TWO 5 H.P. MOTORS WERE SANCTIONED FROM 12TH
FINANCE FUNDS BY THE D.P.O. AND AS PER THE ENTRIES RECORDED IN
M.B.NO.GP/1709/B/2005, PAGE 5, THE AMOUNT WAS PAID VIDE S.T.O. CHEQUE NO. A333216, DATED 21.2.06. SINCE THE
AMOUNT WAS SPENT WITH THE EXPRESS PERMISSION FROM THE D.P.O. DULY RECORDING
IN M.B. AND PAID THROUGH GOVT. TREASURY THERE IS NO MIS USE OF FUNDS. |
|
15/10/2007 2518. |
SARPANCH KHEMRAJKALLALI
(V) JUKKAL
(M) |
KHEMRAJ KALLALI OF JUKKAL MANDAL IS INCLUDED IN
2ND PHASE INDIRAMMA ADHARSHA GRAMAM - WE HAVE IDENTIFIED ELIGIBLE
BENEFICIARIES FOR RELEASE OF PENSIONS - BUT SO FAR PENSIONS ARE NOT
SANCTIONED - KINDLY ARRANGE FOR IMMEDIATE RELEASE OF PENSION TO ALL THE
IDENTIFIED BENEFICIARIES. SIMILARLY, GOVT. HAVE ALLOTTED HOUSE PLOTS TO 136
BENEFICIARIES - DUE TO LACK OF WATER FACILITY HOUSES COULD NOT BE CONSTRUCTED
- IF A BORE WELL IS DRILLED HOUSES COULD BE CONSTRUCTED - SO KINDLY ARRANGE
FOR PROVIDING WATER FACILITY. |
THE P.D.(DRDA) HAD REPORTED THAT EARLIER 62
BENEFICIARIES WERE IDENTIFIED FOR RELEASE OF PENSIONS UNDER VARIOUS SCHEMES.
IN THE 1ST WEEK OF OCTOBER PENSIONS WERE PAID TO 61 MEMBERS AS THE OTHER
MEMBER WAS NOT AVAILABLE IN THE VILLAGE. THE SARPANCH HAS IDENTIFIED ANOTHER 132 MEMBERS AND REQUESTED TO
RELEASE PENSIONS. THE LIST WOULD BE VERIFIED AND ELIGIBLE PERSONS WOULD BE
CONSIDER FOR RELEASE OF PENSION. THE D.M.(HOUSING) HAD REPORTED THAT HOUSES ARE
PROPOSED UNDER INDIRAMMA PHASE-II AND BORE WELL WOULD BE DRILLED AT APPROPRIATE
TIME. |
|
15/10/2007 2519. |
MARKAL
(V) SADASHIVNAGAR
(M) |
WE HAVE PLANNED TO RAISE BENGAL GRAM DURING RABI
AND PREPARED THE FIELDS - EVERY DAY THE M.A.O. SADASHIVNAGAR IS STATING THAT
THE SEED WOULD COME TOMORROW - THE SEASON IS VERY MUCH ON AND DELAY WOULD
RESULT IN POOR YIELD - KINDLY ARRANGE TO SEND SEED ON PRIORITY BASIS. |
THE JDA HAD REPORTED THAT 10 M.Ts. OF BENGAL GRAM
WAS RECEIVED ON 16.10.2007 AND PLACED AT P.A.C.S., SADASHIVNAGAR AND BEING
DISTRIBUTED TO THE NEEDY FARMERS. |
|
15/10/2007 2520. |
GANESH BHEEMGAL
(V) BHEEMGAL
(M) |
I AM AN S.T. CANDIDATE AND MARRIED MUNNURU KAPU
GIRL IN KALYANAMASTU PROGRAMME WITH THE PERMISSION OF THE DIST.
ADMINISTRATION AND APPLIED FOR RELEASE OF FINANCIAL ASSISTANCE UNDER INTER
CASTE MARRIAGE PROGRAMME - I HAVE SUBMITTED ALL THE REQUIRED CERTIFICATES -
BUT SO FAR SANCTION IS AWAITED - KINDLY ARRANGE FOR SANCTION AS EARLY AS
POSSIBLE. |
THE D.T.W.O. HAD REPORTED THAT FINANCIAL
ASSISTANCE OF Rs.10,000/- WAS HANDED OVER TO THE INTER CASTE MARRIED COUPLE
BY THE HON'BLE CHIEF MINISTER ON 17.10.2007 VIDE D.D. NO. 786819, DATED
16.10.07. |
|
15/10/2007 2521. |
GANGADHAR EX-SARPANCH MADAPUR
(V) MAKLOOR
(M) |
A DRINKING WATER O.H.S.R. WAS CONSTRUCTED, PIPE
LINE LAID AND MOTOR INSTALLED - THE SYSTEM WAS HANDED OVER TO P.S.G.P. ONE YEAR
BACK - BUT SO FAR WATER IS NOT PUMPED TO THE O.H.S.R. DUE TO SOME PROBLEM
BETWEEN THE CONTRACTOR AND THE OFFICIALS - DUE TO THIS THE VILLAGERS ARE
FACING DRINKING WATER PROBLEM - KINDLY INTERVENE AND INSTRUCT THE CONCERNED
TO TRAIL RUN THE SYSTEM AND HANDOVER THE SAME TO THE G.P. FOR SUPPLY OF
DRINKING WATER TO THE VILLAGERS. |
THE S.E.(RWS) HAD REPORTED THAT THE DRINKING WATER
P.W.S. SCHEME WAS COMPLETED IN ALL ASPECTS AND COULD NOT BE COMMISSIONED FOR
WANT OF POWER SUPPLY. A CONSENT LETTER FOR THREE PHASE POWER SUPPLY AND FOR
PAYMENT OF SERVICE LINE CHARGES WAS GIVEN TO AAE OPERATIONS MAKLOOR ON
09.10.07. AS SOON AS THE DEMAND LETTER IS RECEIVED AMOUNT WOULD BE DEPOSITED
AND SCHEME COMMISSIONED IMMEDIATELY AFTER SERVICE LINE ARE ERECTED. |
|
05/11/2007 2522. |
KOTHAPALLY
(V) BALKONDA
(M) |
IN AGRICULTURAL MARKET COMMITTEE, NIZAMABAD ALL
THE COMMISSION AGENTS ARE DEDUCTING UNAUTHORISED 4% COMMISSION WHICH IS
AGAINST RULES - COMPLAINTS TO THE MARKET COMMITTEE AUTHORITIES DID NOT YIELD
ANY RESULT - SINCE THE FARMERS ARE PUT TO LOSS KINDLY INTERVENE AND DO
JUSTICE TO THE FARMERS. |
THE A.D. (MARKETING) HAD REPORTED THAT THE ISSUE
WAS DISCUSSED WITH THE COMMISSION AGENTS IN THE PRESENCE OF FARMERS AND
TRADERS BY THE DISTRICT COLLECTOR AND THE ISSUE HAS BEEN SOLVED. |
|
05/11/2007 2523. |
NANDIPET
(V) NANDIPET
(M) |
CHINDU ARTISTS IN THE DISTRICT ARE NOT GETTING
LIVELIHOOD DUE TO LACK OF ORGANISING OF PROGRAMMES - ALL THE CHINDU FAMILIES
MAY BE EXTENDED GOVT. PROGRAMMES LIKE; HOUSE SITES, HOUSES, PENSIONS AND
FINANCIAL ASSISTANCE FOR SELF EMPLOYMENT. FURTHER, YESTERDAY AROUND 50 ARTISTS HAVE ATTENDED
HON'BLE C.M. PROGRAMME AS PER THE INSTRUCTIONS OF D.P.O. - BUT, WE WERE PAID
HONORARIUM OF Rs.1500/- ONLY INCLUDING T.A. - THIS IS VERY MEAGRE - KINDLY
ARRANGE TO PAY REASONABLE AMOUNT AS EARLY AS POSSIBLE. |
THE D.P.O. HAD REPORTED THAT CHINDU ARTISTS WERE
NOT INVITED TO ATTEND THE HON'BLE C.M. PROGRAMME AT ALISAGAR. THEY HAVE COME
ON THEIR OWN. HOWEVER, SINCE THEY WERE POOR AND STATED THAT THEY DO NOT HAVE
MONEY TO EAT AND GO BACK TO NANDIPET, FOOD WAS ARRANGED AND Rs.1500/- WERE
PAID TOWARDS TRANSPORTATION CHARGES. REGARDING EXTENDING GOVT. SPONSORED DEVELOPMENT
SCHEMES THE PRESIDENT OF THE ASSOCIATION WAS INFORMED TO APPROACH CONCERNED
OFFICERS WITH APPLICATION WITH PRESCRIBED FORMAT FOR CONSIDERING THEIR
REQUEST ON MERIT. |
|
05/11/2007 2524. |
SATYANANDAM PERKIT
(V) ARMOOR
(M) |
THERE IS A DISTRIBUTORY 82/7 IN PERKIT VILLAGE
WITH A LENGTH OF 3.00 K.Ms. - FUNDS WERE SANCTIONED FOR DESILTING OF CANAL -
OUT OF 3 K.Ms. LENGTH DESILTING IS DONE UP TO 2 ½ K.Ms. AND THE WORK IS
STOPPED FOR THE REMAINING ½ K.M. - KINDLY ARRANGE FOR DESALTING THE REMAINING
½ K.M. SO THAT THE TAIL END FARMERS RECEIVE CANAL WATER. ( DYC NO.2512, DATED
01.10.07) - THE DY.E.E(IB) HAD INSPECTED THE SPOT AND ASSURED TO TAKE UP THE
LEFT OVER WORK FROM 15.10.2007 - BUT, SO FAR THE WORK IS NOT STARTED - KINDLY
ARRANGE FOR IMMEDIATE COMPLETION OF THE WORK AND SAVE THE FARMERS AT THE TAIL
END. |
THE E.E.(IB), NIZAMABAD HAD REPORTED THAT REMOVAL
OF DEPOSITED EARTH FROM DISTRIBUTORY NO. 82/1 OF N.S.P. IS IN PROGRESS. THE WORK WOULD BE COMPLETED WITHIN A WEEKS
TIME. |
|
05/11/2007 2525. |
NARSIMLOO LAXMIDEVANPALLY
(V) BHIKNOOR
(M) |
IN LAXMIDEVANPALLY VILLAGE OF BHIKNOOR MANDAL A
PERCOLATION TANK WAS COMPLETED UNDER THE SUPERVISION OF SRI NAVEEN REDDY -
BUT, EVEN AFTER LAPSE OF 25 DAYS PAYMENT IS NOT MADE - THE SUPERVISOR IS
DODGING FOR PAYMENT - KINDLY ARRANGE IMMEDIATE PAYMENT SO THAT THE LABOUR MAY
NOT SUFFER. |
THE P.D.(DWMA) HAD REPORTED THAT THE PERCOLATION
TANK WAS COMPLETED AND PAYMENT MADE TO THE LABOUR ON 13.11.2007 UNDER
N.R.E.G.S. |
|
05/11/2007 2526. |
BAPU
REDDY EX-UPA
SARPANCH YADARAM
(V) DOMAKONDA
(M) |
I HAVE LAID PIPELINE UNDER R.W.S. SCHEME AT
SIVARAMIREDDYPALLI VILLAGE - AFTER COMPLETION OF THE WORK RICE COUPONS WERE ISSUED
BUT THE F.P.S. DEALER IS STATING THAT NO RICE IS ALLOTTED FOR SUPPLY ON THE
COUPONS. THE S.E.(RWS) HAD VERIFIED THE M.B. AND FORWARDED
XEROX COPIES OF COUPONS TO THE D.M.(CS) CORPORATION FOR RELEASING OF RICE AS
AT PRESENT THERE IS NO RICE STOCK WITH M.L.S. POINT - BUT, SO FAR RICE IS NOT
RELEASED TO THE M.L.S. POINT - KINDLY ARRANGE TO RELEASE RICE AS EARLY AS
POSSIBLE. |
THE D.M. (CS) HAD REPORTED THAT THE WORK OF LAYING
PIPE LINE UNDER R.W.S. AT SIVARAMAREDDYPALLY PERTAINS TO YEAR 2000. DURING
THAT PERIOD THERE WAS NO SHORTAGE OF RICE AND ALL THE RELEASE ORDERS WERE
ATTENDED AND STOCKS PLACED WITH THE M.L.S. POINTS. THE REASON FOR NOT
RELEASING RICE SINCE 2000 IS NOT KNOWN. THEREFORE, THE S.E.(RWS) WAS REQUESTED TO SEND A
SPECIFIC REPORT FOR NOT TAKING DELIVERY OF RICE SINCE 7 YEARS UNDER F.F.W.
PROGRAMME AND ALSO TO FURNISH COPIES OF THE FOLLOWING DOCUMENTS. 1. SANCTION PROCEEDINGS OF THE COLLECTOR, 2. WORK COMPLETION CERTIFICATE 3. UTILISATION CERTIFICATE 4. PHOTOS TAKEN BEFORE AND AFTER COMPLETION OF
WORK 5. COPY OF THE M.B. 6. CERTIFICATE TO THE EFFECT THAT THE RICE WAS NOT
DRAWN EARLIER. AS SOON AS THE DETAILS ARE RECEIVED FURTHER ACTION
WOULD BE TAKEN |
|
05/11/2007 2527. |
TADBILOLI
(V) RENJAL
(M) |
SRI SANTOSH REDDY, EXCISE CONTRACTOR, HAS INSTRALLED
SENDI DEPOT AT TADBILOLI VILLAGE AND PREPARING ADULTERATED TODDY AND
SUPPLYING IN THE ENTIRE RENJAL MANDAL VIDE LORRY NO. AAJ 5602, CAUSING HEALTH
PROBLEMS TO THE CONSUMERS - WE HAVE FILED COMPLAINT WITH THE EXCISE OFFICIALS
BUT THEY HAVE NOT TAKEN ANY ACTION - KINDLY ARRANGE FOR SURPRISE INSPECTION
AND TAKE APPROPRIATE ACTION AGAINST CONTRACTOR. |
THE SUPERINTENDENT (P&E), NIZAMABAD HAD
REPORTED THAT THE MATTER WAS GOT ENQUIRED THROUGH S.H.O., BODHAN AND ENQUIRE
REVILED THAT THERE IS NO SENDHI DEPOT IN TADBILOLI VILLAGE. SRI SANTOSH
REDDY, EXCISE CONTRACTOR, TADBILOLI IS NOT SUPPLYING SENDHI TO ANY VILLAGE.
ALL THE T.F.T. LICENCE HOLDERS IN TADBILOLI, SATAPUR AND DOOPALLI VILLAGES
ARE SELLING SENDHI FROM THE BUNS ALLOTTED IN THE SPECIFIED PLACE ONLY. THEY
HAVE ALSO GIVEN A WRITTEN STATEMENT STATING THAT NO PERSON IS SUPPLYING
SENDHI FROM OUT SIDE VILLAGE THROUGH LORRY. FURTHER THE CALLER SRI RAVINDER
GOUD S/o LINGA GOUD IS NOT LICENCING HOLDER AT PRESENT. EARLIER, HE RUN A
SOCIETY IN TADBILOLI AND A CASE IN CR.NO. CC/568/05 IS PENDING IN EXCISE
COURT, BODHAN. SINCE THERE IS NO TRUTH IN THE COMPLAINT, IT DESERVES TO BE
CLOSED. |
|
19/11/2007 2528. |
CH.RAMESH
KUMAR UPA-SARPANCH ACHAMPET
(V) NIZAMSAGAR
(M) |
OUR VILLAGE SARPANCH, SRI HEMA GOUD HAD TAKEN UP
ROAD WORK UNDER E.G.S. INVOLVING Rs.1.50 LAKH WITHOUT KNOWLEDGE OF G.P. AND
IN THE ABSENCE OF RESOLUTION TO TAKE UP THE WORK - THIS WORK WAS TAKEN UP BY
DRAFTING LABOUR FROM OTHER VILLAGERS AND CLIMBED THE BILL ON LOCAL LABOUR
NAME - I BEING UPA-SARPANCH RAISED ON OBJECTION AND FILED COMPLAINT AFTER
THIS THE SARPANCH DRAFTED A RESOLUTION IN BACK DATE AND SENT FOR SIGNATURE OF
THE MEMBERS - KINDLY ENQUIRE INTO THE MATTER AND TAKE NECESSARY ACTION
AGAINST THE SARPANCH. |
THE D.P.O. HAD REPORTED THAT A DETAIL ENQUIRY HAS
TO BE DONE AND AS SUCH FINAL REPORT WOULD BE SUBMITTED AFTER DETAILED
ENQUIRY. |
|
19/11/2007 2529. |
GODAVARI M.P.T.C. ARGUL
(V) JAKRANPALLY
(M) |
I AM M.P.T.C. OF ARGUL VILLAGE OF JAKRANPALLY
MANDAL I AM BELONG TO S.C. COMMUNITY - IN OUR S.C. COLONY MINIMUM FACILITIES
LIKE DRINKING WATER, ELECTRICITY, DRAINAGES ARE NOT AVAILABLE - FUNDS ARE NOT
BEING PROVIDED TO S.C. COLONY AND MAJORITY MEMBERS ARE GETTING FUNDS ALLOTTED
TO THEIR WARDS - KINDLY RELEASE FUNDS FOR IMMEDIATE PROVIDING OF DRINKING
WATER BY DRILLING A BORE WELL AND PROVIDING ELECTRICITY IN S.C. COLONY OF THE
VILLAGE. |
THE CEO(ZP) HAD REPORTED THAT THE REQUEST OF SMT.
GODAVARI, MPTC, JAKRANPALLI WAS CONSIDERED UNDER B.R.G.F. PROGRAMME. |
|
19/11/2007 2530. |
NARENDER KAMAREDDY
(V) KAMAREDDY
(M) |
I AM WORKING AS VIDHYA VOLUNTEER IN HIGH SCHOOL,
KAMAREDDY SINCE JUNE BUT SO FAR HONORARIUM IS NOT RELEASED AND PAID - KINDLY
ARRANGE TO RELEASE THE FUNDS AS EARLY AS POSSIBLE. |
THE DEO HAD REPORTED THAT HONORARIUM FOR THE
MONTHS OF JUNE TO OCTOBER' 07 WAS RELEASED VIDE PROCEEDINGS NO.3153/A5-1/07
DATED 15.11.07 AND CHEQUES WERE ISSUED TO ALL THE VIDYA VOLUNTEERS BY THE
M.E.Os. |
|
19/11/2007 2531. |
GAYASUDDIN Z.P.T.C. YELLAREDDY
(V) YELLAREDDY
(M) |
THE S.C. HOSTEL IN YELLAREDDY PROPER IS IN
DILAPIDATED CONDITION - BOARDERS ARE STAYING WITH FEAR - IF IT IS COLLAPSED
IT WOULD CAUSE LOT OF LOSS TO THE INMATES - KINDLY TAKE UP NEW CONSTRUCTION
ON PRIORITY BASIS TO SAVE THE POOR BOARDERS. |
THE DD(SW) HAD REPORTED THAT THE EXISTING HOSTEL
BUILDING IS VERY OLD AND UNDER DILAPIDATED CONDITION AND NOT FIT FOR REPAIRS.
FOR CONSTRUCTION OF NEW BUILDING ESTIMATES FOR Rs.11.50 LAKHS WERE PREPARED
AND PROPOSAL SUBMITTED TO THE COMMISSIONER, S.W., HYD. FOR RELEASE OF FUNDS.
AS SOON AS FUNDS ARE RELEASED NEW CONSTRUCTION WOULD BE TAKEN UP. IN VIEW OF
THE PRECARIOUS CONDITION OF THE BUILDING, THE H.W.O. WAS INSTRUCTED TO SHIFT
THE HOSTEL TO A RENTED BUILDING. |
|
19/11/2007 2532. |
PALDA
(V) NIZAMABAD
(M) |
IN PALDA VILLAGE FOR IRRIGATION TRANSFORMERS
ELECTRICAL POLLS ARE NOT INSTALLED AND SUPPLY LINES ARE TAGGED TO AVAILABLE
WOODEN POLES - RESULTING LOW LAYING OF SUPPLY LINES AND FREQUENT FAILURES -
RECENTLY ONE PERSON DIED NEAR THE TRANSFORMER - THE ELECTRICITY AUTHORITIES
ARE NOT TAKING ANY ACTION AND GIVING A DEAF EAR TO THE COMPLAINTS - KINDLY
INTERVENE AND DO JUSTICE TO THE FARMERS. |
THE S.E.(NPDCL) HAD REPORTED THAT THE TRANSFORMER
WAS ERECTED ON THE PLINTH DURING OCTOBER 1989 BY ERECTION OF LINES ON
P.S.C.C. POLES AND TRANSFORMER IS NOT FAILED SINCE JUNE 2005. HOWEVER, ONE
MALE CONTACT A.B. SWITCH HAD FAILED AND THE SAME WAS TIDE WITH WIRES DUE TO
NON-AVAILABILITY OF SPARE MALE CONTACT IN THE STORES OF THE A.A.E. (OPERATION
SECTION. THEREFORE, ONE MALE CONTACT WAS SENT FROM DISTRICT STORES AND
REPLACE ON 20.11.2007. FURTHER NO PERSON HAD DIED DUE TO ELECTROCUTION NEAR
THIS TRANSFORMER SINCE JUNE 2005 TO TILL DATE. |
|
17/12/2007 2533. |
UDAY
SHANKAR ADVACATE BODHAN
(V) BODHAN
(M) |
IN BODHAN MUNICIPAL LIMITS OPPOSITE TO MUNICIPAL
COMPLEX MY RESIDENTIAL AND COMMERCIAL COMPLEX IS EXISTING - DURING NIGHT
TIMES LORRY OWNERS/ DRIVERS ARE PARKING THEIR VEHICLES INDISCRIMINATELY AND
CAUSING LOT OF NUISANCE AND DISTURBANCE DUE TO WHICH WE ARE UNABLE TO SLEEP
PROPERLY IN THE NIGHT - KINDLY INSTRUCT THE CONCERNED LIKE REVENUE/
MUNICIPAL/ POLICE AND TRANSPORT AUTHORITIES TO RESTRICT PARKING IN MUNICIPAL
LIMITS BY ARRANGING PARKING AWAY FROM RESIDENTIAL AND COMMERCIAL AREAS. |
THE R.D.O., BODHAN HAD REPORTED THAT THE D.S.P.
AND A.M.V. HAVE INSTRUCTED TO REMOVE ALL ILLEGAL PARKING IN MUNICIPAL AREA
INCLUDING AMBEDKAR CHOWRASTA WHERE THE CALLER IS RESIDING AND ALSO TO TAKE
STRINGENT ACTION AGAINST THE CULPRITS. |
|
17/12/2007 2534. |
AILAPUR
(V) NANDIPET
(M) |
ONE SMT. NATTUBAI W/o SAILOO R/o AILAPUR VILLAGE
OF NANDIPET MANDAL WAS ADMITTED IN GOVT. HOSPITAL, NIZAMABAD FOR OPERATION OF
A TUMOUR IN THE BELLY - FOR THE PAST FOUR DAYS NO DOCTOR HAD ATTENDED HER FOR
PERFORMING THE OPERATION - SHE IS A VERY POOR PERSON AND BELONG TO S.C.
COMMUNITY - KINDLY ARRANGE OPERATION URGENTLY. |
THE D.C.H.S. HAD REPORTED THAT HE HAS VERIFIED THE
IN PATIENT CASE SHEETS AND IT IS NOTICED THAT SMT. NATTU BAI W/o SAILU R/o
AILAPUR AS OT ADMITTED N THE DISTRICT HOSPITAL FOR OPERATION OF TUMOUR IN THE
BELLY. |
|
17/12/2007 2535. |
RAGHUVEER
RAO KALYANI
(V) YELLAREDDY
(M) |
I AM CALLING ON BEHALF OF THE TAIL END AYACUTDARS
OF KALYANI VILLAGE UNDER POCHARAM PROJECT - DURING LAST RAINY SEASON THE BUND
OF THE CANAL WAS WASHED OUT AND NOW IT IS RESTORED - SIDE WALL IS UNDER
CONSTRUCTION - THE CONTRACTOR IS NOT MAINTAINING QUALITY - INSTEAD OF MIXING
SAND IN CEMENT HE IS MIXING MORRAM -
RESULTING POOR QUALITY - THE LOCAL DY.EE. MR. HRISHIKESH IS NOT
RESPONDING TO THE COMPLAINTS AND ENSURING QUALITY - KINDLY DEPUTE A SENIOR
OFFICER FOR SURPRISE INSPECTION AND DO JUSTICE TO THE TILL END FARMERS. |
THE E.E.(IB), KAMAREDDY HAD REPORTED THAT THE
SUPERINTENDING ENGINEER, IRRIGATION CIRCLE NO.3, NIZAMABAD VISITED THE
SURPRISINGLY THE WORK SITE ON 22.12.2007. THE QUALITY CONTROL STAFF,
HYDERABAD ALSO INSPECTED THE WORK. FURTHER, HE REPORTED THAT THE CONTRACTOR,
IS MIXING SAND AND GETTING THE SAND FROM APPROVED QUARRY ONLY AND MAINTAINING
THE QUALITY NOT USED THE MORRAM.. |
|
17/12/2007 2536. |
SRINIVAS CEC
PRERAK MACHAREDDY
(V) MACHAREDDY
(M) |
I AM C.E.C. PRERAK IN MACHAREDDY AND SINCE APRIL
2007 SALARY T.A., D.A. AND PAPER BILLS ETC. ARE NOT RELEASED AND PAID -
FURTHER THE M.L.O., MACHAREDDY IS NOT DISCHARGING HIS DUTIES PROPERLY BY
VISITING THE CENTRES - HE IS INSTRUCTING TO GET THE RECORDS TO HIS HOUSE AND
CHECKING THERE ONLY - HE IS ALSO INDULGING IN CORRUPT PRACTICES - AMOUNT
RECEIVED TO THE CENTRES IS NOT BEING DISBURSED - HE IS FORCIBLY OBTAINING
SIGNATURES OF THE PRERAKS AND NOT PAYING THE AMOUNT - ON REFUSAL TO SIGN HE
IS THREATENING TO CLOSE DOWN THE CENTRE - KINDLY CAUSE THROUGH ENQUIRY AND DO
JUSTICE. |
THE D.D.(AE) HAD REPORTED THAT GOVT. OF INDIA, NEW
DELHI HAS RELEASED THE BUDGET PAYMENT WILL BE MADE WITHIN (15) DAYS. FURTHER
HE HAD REPORTED THAT ALLEGATIONS MADE AGAINST M.L.O. IS NOT PROVED. |
|
17/12/2007 2537. |
KURMA
BALAIAH YELLAREDDY
(V) YELLAREDDY
(M) |
IN YELLAREDDY TOWN BESIDES FIRE STATION AND
ADJACENT TO POCHARAM CANAL ONE ACRE GOVT. LAND IN SY.NO.822 WAS ILLEGALLY ENCROACHED BY SHIVA, PRESS REPORTER
OF EENADU - THIS LAND IS BEING USED FOR COMMON PURPOSE BY THE FARMERS - ON
QUESTIONING HE IS STATING THAT he IS A PRESS REPORTER AND ADVISING TO
COMPLAIN BEFORE ANY ONE AND NOTHING WOULD HAPPENED TO HIM - KINDLY CAUSE
ENQUIRY WITH A SENIOR OFFICER AND DO JUSTICE TO THE LOCAL FARMERS. |
THE TAHSILDAR, YELLAREDDY HAD REPORTED THAT
SY.NO.822 NOT ENCROACHED. HOWEVER, THE BOUNDARIES FIXED BY THE SURVEYOR. |
|
17/12/2007 2538. |
RAJAIAH RENJAL
(V) RENJAL
(M) |
I HAVE AN HOUSE AND SHOPPING COMPLEX ON THE MAIN
ROAD - THERE IS NO DRAINAGE FACILITY IN THIS STREET - THEREFORE, ALL THE
DRAIN WATER IS STAGNATED IN FRONT OF MY HOUSE ON THE MAIN ROAD CAUSING
INCONVENIENCE TO THE ROAD USERS, CUSTOMERS AND CREATING HEALTH PROBLEMS TO
THE INMATES OF THE HOUSE - SEVERAL REPRESENTATIONS TO THE G.P. DID NOT YIELD
ANY RESULT - KINDLY VISIT THE SPOT AND ARRANGE FOR A DRAINAGE. SIMILARLY, I HAVE APPLIED FOR DRINKING WATER TAP
CONNECTION - BUT THE G.P. IS NOT PROVIDING CONNECTION WITH OUT ANY REASON -
KINDLY ARRANGE PROVIDING OF DRINKING WATER SUPPLY PIPE LINE TO MY RESIDENCE. |
THE D.P.O. HAD REPORTED THAT REPORT HAS BEEN
CALLED FROM THE DL.P.O., BODHAN WHICH IS AWAITED. |
|
17/12/2007 2539. |
D.VIJAY
KUMAR BICHKUNDA
(V) BICHKUNDA
(M) |
I AM HAVING MY PATTA LAND IN BICHKUNDA PROPER JUST
BEHIND TAHSIL OFFICE - THIS LAND IS STANDING ON MY NAME FOR THE PAST 25 YEARS
- RECENTLY ONE PERSON STARTED CONSTRUCTION IN THIS PLOT - WHEN I HAVE RAISED
AN OBJECTION HE IS STATING THAT HE TOO HAVING REGISTERED DOCUMENTS - I HAVE
FILED OBJECTION PETITION BEFORE THE G.P. FOR IMMEDIATE STOPPING OF WORK -
THEY HAVE NOT RESPONDED - THEREFORE, I AM FILLING THIS REPRESENTATION
REQUESTING INTERVENTION OF DIST. PANCHAYAT OFFICER FOR DOING JUSTICE. I HAVE ALSO FILED APPLICATION FOR SURVEY WITH THE
S&LR OFFICE AT BODHAN - BUT THEY TOO HAVE NOT TAKEN ANY SURVEY WORK TO
SHOW THE POSITION OF THE MY LAND - KINDLY ARRANGE FOR IMMEDIATE SURVEY AS THE
TAHSILDAR IS STATING THAT IT IS A G.P. LAND AND THEY DO NOT HAVE ANY RECORD
WITH TAHSIL OFFICE. |
THE D.P.O. HAS REPORTED THAT THERE WAS NO
CONSTRUCTION WORK AT PRESENT. THE AD (S&LR) HAD REPORTED THAT 18 PATTEDARS
WERE GIVEN LAND IN SY.NO. 863 AT BICHKUNDA PROPER LONG BACK. AT PRESENT THIS
LAND IS INCLUDED IN ABADI AND HOUSES HAVE COME UP. THE CALLER IS ACTUALLY NOT
IN PHYSICAL POSSESSION OF THE LAND ASSIGNED. SINCE HOUSES WERE ALREADY
CONSTRUCTED DUE TO INCLUSION IN ABADI, NOW IT IS NOT POSSIBLE TO IDENTIFY HIS
LAND AND HANDOVER PHYSICAL POSSESSION. |
|
17/12/2007 2540. |
SUNKARI
NAGANNA CH.KONDUR
(V) NANDIPET
(M) |
IN CH.KONDUR UNDER "MALA CHERUVU" S.C.
COMMUNITY MEMBERS AREHAVING NEARLY 150 ACRES - THIS AYACUT IS BEING
CULTIVATED DULY DRAWING WATER FROM MALA CHERUVU - BUT RECENTLY SOME PERSONS
HAVE STARTED CULTIVATING IN THE SIKAM OF LAND BY DUMPING SOIL TO RAISE THE
SHIKAM - THIS WOULD RESULT IN CLOSER
OF TANK AND OUR LANDS WOULD BECOME FALLOW AS THE TANK WOULD GET NO WATER AND
EVEN THE BORE WELLS WOULD ALSO DRIED UP - THEREFORE, ARRANGE IMMEDIATE
INSPECTION OF MALA TANK AND REMOVE ALL THE ILLEGAL ENCROACHERS AND IF BY
MISTAKE ANY ASSIGNMENT IS GRANTED THE SAME MAY BE CANCELLED AS GOVT. HAVE
BANNED ASSIGNMENT OF WATER BODIES. SIMILARLY IN OTHER CHERUVU NAMELY YELLAMMA KUNTA
ENCROACHERS ARE DOING SAME WORK AS STATED ABOVE - THIS TANK MAY ALSO BE
INSPECTED AND JUSTICE DONE TO THE AYACUT FARMERS. |
THE TAHSILDAR, NANDIPET HAD REPORTED THAT NO
SIKKAM LAND UNDER MALA KUNTA (JAIN KUNTA). BUT SY.NO.274/20 IS K.K. EXTENT
`17.02 ACRES OUT OF WHICH AN EXTENT OF 74.04 ACRES HAS BEEN ASSIGNED. THE
BALANCE AREA OF 53.18 ACRES IS COVERED BY HOUSES, SCHOOL, GUTTA ETC. FURTHER, HE HAS REPORTED THAT THE AYACUT UNDER
YELLAMMA CHERUVU HAS BEEN SUBMERGED IN S.R.S.P. PROJECT, BUT TANK HAS NOT
SUBMERGED. SY.NO. 234/8 A, 1.22 ACRES, 234/9 A 2.02 ACRES, 234/10 TO 15 EXT.
59.28 ACRES OUT OF WHICH AN EXTENT 4.01 ACRES HAS BEEN ASSIGNED THE BALANCE
AREA OF 55.27 ACRES AS RECORDED K.K. |
|
17/12/2007 2541. |
K.PANDURANGAM PRESIDENT,
UNITED ELE. EMP. YADARAM
(V) DOMAKONDA
(M) |
I AM PRESIDENT OF THE CONTRACT ELECTRICAL WORKERS
IN KAMAREDDY DIVISION - UNDER ALL SUB-STATIONS THE CONTRACTORS HAVE NOT PAID
SALARIES FROM SEPTEMBER 2007 STATING THAT FRESH AGREEMENTS ARE NOT CONCLUDED
WITH N.P.D.C.L. - DUE TO ADMINISTRATIVE DELAY POOR WORKERS ARE NOT GETTING
SALARY FOR THE PAST FOUR MONTHS - KINDLY INSTRUCT THE CONCERNED AT DIST.
LEVEL TO EXPEDITE ADMINISTRATIVE FORMALITIES AND ARRANGE PAYMENT OF SALARY AS
EARLY AS POSSIBLE. |
THE S.E.(NPDCL) HAD REPORTED THAT THE SALARIES FOR
THE MONTH OF 09/2007 TO 11/2007 WAS PAID ON 18.12.2007. THE EARLIER AGREEMENT EXPIRED BY
31.08.2007, THE FRESH AGREEMENT FROM 01.09.2007 IS UNDER PROCESS OF
COMPLETION WITH THE COMPANY. THE EXTENSION OF AGREEMENT IS EXPECTED. |
|
17/12/2007 2542. |
GAYASUDDIN ZPTC YELLAREDDY
(V) YELLAREDDY
(M) |
IN YELLAREDDY MANDAL THE EXISTING H.P. DEALER HAD
STOPPED SUPPLY OF GAS CYLINDERS SINCE DASARA - ON OUR REPRESENTATION THE
SUPPLY IS TEMPORARILY TAGGED TO DEALER AT VARNI AND ALSO TEMPORARY SUPPLY IS
ARRANGED FROM KAMAREDDY - BUT THESE TWO DEALERS ARE NOT SENDING AT LEAST ONE
LOAD EVERY WEEK - THEY ARE SENDING ONE LOAD ONCE IN A MONTH WHICH IS
RESULTING IN DISPUTES AT YELLAREDDY FOR SECURING CYLINDERS - KINDLY MAKE
PERMANENT ARRANGEMENT ON PRIORITY BASIS AND TILL SUCH TIME ARRANGE SUPPLY OF
AT LEAST ONE LOAD EVERY WEEK. |
THE D.S.O. HAD REPORTED THAT THE STATE LEVEL
COORDINATOR, HYDERABAD WAS REQUESTED TO TAKE IMMEDIATE ACTION TO REOPEN
L.P.G. OUT LET OF D.M. APSCSCL, NIZAMABAD OR TO APPOINT A FRESH B.P.C. DEALER
AT YELLAREDDY. AS STOP GAP MEASURES NECESSARY ORDERS MAY BE ISSUED TO MADAV
SAI AGENCY, VARNI TO OPEN AND EXTENSION COUNTER AT YELLAREDDY TO ENABLE TO
SUPPLY REFILLS TO CONSUMERS OF YELLAREDDY. |
|
07/01/2008 2543. |
MOGALAIAH KATEPALLI
(V) PITLAM
(M) |
I HAVE APPLIED FOR FIELD ASSISTANT POST AS CALLED
FOR BY THE PD(DWMA) - I HAVE PASSED INTER AND THE DISTRICT COLLECTOR ASSURED
TO SELECT A CANDIDATE WITH HIGHER QUALIFICATIONS - I BELONG TO S.C. COMMUNITY
- BUT THE M.P.D.O. IS STATING THAT CANDIDATE WHO HAS RECOMMENDATIONS OF LOCAL
M.L.A. WOULD ALONE BE SELECTED - I REQUEST KINDLY TO DO JUSTICE AS I AM ONLY
CANDIDATE WITH INTERMEDIATE QUALIFICATION. |
THE P.D.(DWMA) HAD REPORTED THAT SO FAR NO FIELD
ASSISTANT IS APPOINTED IN KATEPALLY VILLAGE OF PITLAM MANDAL FOR WANT OF
RESOLUTION FROM G.P. AS AND WHEN RESOLUTION IS RECEIVED FURTHER ACTION WOULD
BE TAKEN. |
|
07/01/2008 2544. |
MAHESHWAR KOLIPAK
(V) JAKRANPALI
(M) |
I AM SELECTED FOR SANCTION OF LOAN UNDER P.M.R.Y.
SCHEME - MY APPLICATION WAS FORWARDED TO THE TORLIKONDA BRANCH BANK MANAGER -
BUT THE MANAGER IS REFUSING TO SANCTION THE LOAN AND GROUND THE SCHEME -
SIMILARLY, THE BRANCH MANAGER IS NOT CONSIDERING RELEASE OF LOAN UNDER ANY
SCHEME SPONSORED BY THE GOVERNMENT - KINDLY INSTRUCT THE MANAGER TO SANCTION
ALL THE SCHEMES SANCTIONED BY THE GOVERNMENT. |
THE G.M. DIC HAD REPORTED THAT HE HAD VISITED THE
BANK ON 09.01.08 AND CONTACTED THE BRANCH MANAGER, WHO STATED THAT THE CALLER
HAD NOT APPROACH THE BANK TILL DATE OF REPORTING FOR SANCTION OF LOAN. THE
CALLER WAS CONTACTED AND ADVISE TO CONTACT THE BRANCH MANAGER AND FULL FILL
OTHER FORMALITIES FOR CONSIDERING SANCTION OF LOAN. THE L.D.M. HAD INFORMED THAT THE REQUEST OF THE
CALLER SRI MAHESHWAR WAS FORWARDED TO THE MANAGER, S.B.H., TORLIKONDA WITH
INSTRUCTIONS TO CONSIDERED HIS REQUEST AS PER RULES. |
|
07/01/2008 2545. |
CHINDU
ARTISTS KORATPALLI
(V) DICHPALLI
(M) |
CHINDU ARTISTS FROM THIS VILLAGE HAVE GIVEN SHOWS
AT DICHPALLY MANDAL DURING THE CENTENARY CELEBRATIONS AT MANDAL LEVEL - BUT
SO FAR NO AMOUNT IS PAID - IT HAS COME TO KNOW THAT SOME MIDDLE MEN ARE
SWALLOWING THE AMOUNT - KINDLY ARRANGE IMMEDIATE PAYMENT TO THE GENUINE
ARTISTS WHO HAVE PERFORMED IN THE SHOW DURING CELEBRATIONS AS WE ARE VERY
POOR AND CAN NOT GO TO OFFICE EVERY DAY. |
THE E.D.(BC CORP.) HAD STATED THAT PAYMENTS AS PER
ELIGIBILITY WAS MADE TO ALL THE CHINDU ARTISTS WHO HAVE PERFORMED THE SHOW. |
|
07/01/2008 2546. |
BALAIAH PRESIDENT,ADHARSHA
RAITUSANGAM LINGAMPET
(V) LINGAMPET
(M) |
AN AGRICULTURE OFFICE BUILDING IS SANCTIONED TO
THIS MANDAL WITH AN ESTIMATED COST OF Rs.5.00 LAKHS - I.E. Rs.2.50 LAKHS CASH
AND Rs.2.50 LAKHS WORTH RICE - P.R. DEPARTMENT IS EXECUTING THIS WORK THROUGH
A CONTRACTOR - THE WORK IS COMPLETED UPTO 80% - AGRICULTURE DEPARTMENT HAD
RELEASED CASH COMPONENT BUT, P.R. DEPARTMENT HAD PAID Rs.85,000/- ONLY - DUE
TO THIS, THE CONTRACTOR HAD STOPPED THE WORK - KINDLY ARRANGE TO RELEASE
BALANCE CASH AND RICE TO COMPLETE THE WORK. |
THE J.D.A. HAD REPORTED THAT M.A.O. BUILDINGS ARE
TAKEN UP WITH AN ESTIMATED COST OF Rs.5.00 LAKHS EACH. THE CASH COMPONENT IS
Rs.2.50 LAKHS AND THE REMAINING Rs.2.50 LAKHS IS IN THE FORM OF RICE
COMPONENT. THE COMMISSIONER AGRICULTURE HAD RELEASED Rs.1.25 LAKHS TOWARDS
1ST INSTALMENT OF CASH COMPONENT. PROPOSAL SUBMITTED FOR RELEASE OF 2ND
INSTALMENT AND SANCTION IS AWAITED. AS SOON AS SANCTION IS RECEIVED THE
AMOUNT WOULD BE RELEASED. SIMILARLY, PROPOSAL SUBMITTED TO THE D.M. CSC, FOR
RELEASE OF RICE WORTH Rs.2.50 LAKHS. |
|
07/01/2008 2547. |
SUDARSHAN AILAPUR
(V) NANDIPET
(M) |
BENEFICIARIES IDENTIFIED UNDER INDIRAMMA PHASE-II
HAVE STARTED CONSTRUCTION OF HOUSES - DUE TO NON-PAYMENT OF AMOUNT WORKS HAVE
COME TO A HALT - THE CONCERNED M.P.D.O./ TAHSILDAR HAVE GIVEN VERIFICATION
CERTIFICATE TO THE A.E. BUT, HE IS DELAYING PAYMENTS FOR UNKNOWN REASONS,
RESULTING DISLOCATION IN THE CONSTRUCTION OF THE HOUSES - KINDLY ARRANGE
RELEASE OF AMOUNT AS PER ELIGIBILITY ON PRIORITY BASIS. |
THE D.M(HOUSING), HAD REPORTED THAT DUE TO CHANGES
MADE BY THE GOVT. IN PAYMENT BILLS, THE PROCEDURE IS BEING FOLLOWED AND THE
BILLS ARE BEING PAID EVERY FRIDAY AS PER THE RECOMMENDATIONS MADE BY THE
INSPECTING AUTHORITIES. BILLS CANNOT BE PAID ON SAME DAY OF COMPLETION OF
WORK. IN THE INSTANT CASES THERE IS NO DELAY IN PAYMENT OF BILLS. |
|
07/01/2008 2548. |
SAILU DOMALEDGI
(V)/ BODHAN BODHAN
(M) |
I AM NATIVE OF DOMALEDGI VILLAGE AND PRESENTLY
RESIDING AT BODHAN PROPER - THE HEADMASTER OF THE GOVT. SCHOOL NAMELY SRI
ILTEPU SHANKAR IS IRREGULAR TO DUTIES - HIS WIFE IS Z.P.T.C. AND CLOSE
SUPPORTER OF M.L.A., BODHAN - AS SUCH NO ACTION IS BEING TAKEN AGAINST THE
H.M. THOUGH CAUSING LOST TO THE STUDENTS. MOREOVER, HE IS UNDER TAKING CONTRACT WORKS
AVOIDING HIS LEGITIMATE DUTIES - THE ASST. ENGINEER SRI ASHOK KUMAR IS
RECORDING BOGUS ENTRIES AND MAKING PAYMENTS - KINDLY TAKES SEVERE ACTION
AGAINST THE H.M. AND A.E. |
THE D.E.O. HAD REPORTED THAT THE DY.E.O. BODHAN
HAD SURPRISED U.P.S. DOMALEDGI AND 10.01.2008 AROUND 02.00 P.M. AND FOUND
THAT SRI E.SHANKAR, HEAD MASTER VERY MUCH PRESENT IN THE SCHOOL. ENQUIRIES
WITH SCHOOL EDUCATION COMMITTEE MEMBERS, SARPANCH AND SOME OF THE PARENTS OF
THE STUDENTS REVEALED THAT THE H.M. IS REGULAR TO THE SCHOOL AND STRIVING FOR
THE WELFARE OF STUDENTS AND DEVELOPMENT OF SCHOOL. THE COMPLAINT FILED AGAIN
THE H.M. IS FOUND FALSE. THE E.E.(PR), BODHAN HAD REPORTED THAT NO WORKS
WERE ALLOTTED TO SRI SHANKAR, HEAD MASTER FROM P.R. ENGINEERING DEPARTMENT.
HIS INVOLVEMENT IS NOT ALSO OBSERVED IN ANY WORK. THEREFORE, QUESTION OF
PAYMENT TO SRI SHANKAR H.M. DOES NOT ARISE. |
|
07/01/2008 2549. |
BADAM
ANJI REDDY MUTHYAMPET
(V) DOMAKONDA
(M) |
DURING THE TENURE OF SRI D.V. RAIDU, I.A.S.,
COLLECTOR I HAVE FIELD COMPLAINT ON THE IRREGULARITIES IN TAKING UP I.S.Ls.
AND FARM PONDS AND LAYING OF PIPE LINE - SINCE THE ALLEGATIONS WERE GENUINE,
THE ACCUSED HAVE INDISCRIMINATELY BEATEN ME AND ALL MY FAMILY MEMBERS - I
HAVE MET THE COLLECTOR AND S.P. PERSONALLY AND FILED APPLICATIONS SEEKING
JUSTICE - BUT SO FAR NO ACTION IS TAKEN - I HAVE FILED APPLICATION WITH THE
M.P.D.O UNDER R.T.I. ACT FOR FURNISHING DETAILS OF DEVELOPMENTAL WORKS TAKEN
UP IN THE VILLAGE DURING THE YEAR 2005 IN THE MONTH OF APRIL 2007 BUT, SO FAR
THE DETAILS ARE NOT GIVEN - KINDLY ARRANGE FOR IMMEDIATE ACTION AGAINST THE
ACCUSED AND TO FURNISH THE INFORMATION REQUESTED UNDER R.T.I. ACT. SIMILARLY, IN MY LAND DISPUTE CASE THE THEN J.C.
SRI G.VENKATRAM REDDY HAD PASSED JUDGEMENT IN FILE NO. D2/703/2005, IN MY
FAVOUR - BUT SO FAR THE REVENUE AUTHORITIES HAVE NOT ISSUED P.B. AND T.D.
CAUSING LOST TO ME AND FAVOURING THE OPPOSITION PARTY - KINDLY ARRANGE IMMEDIATE
ISSUE OF P.B. & T.D. |
THE C.E.O. (ZP) HAD REPORTED THAT THE M.P.D.O. HAD
ALREADY FURNISHED REQUIRED INFORMATION TO SRI B.ANJI REDDY UNDER PROPER
ACKNOWLEDGMENT. IN SPITE OF THIS, THE CALLER ANJI REDDY HAD FILED A FALSE
COMPLAINT INFORMING THAT THE INFORMATION REQUESTED UNDER R.T.I. ACT WAS NOT
FURNISHED. COPIES OF THE ACKNOWLEDGMENT ARE ENCLOSED FOR READY
REFERENCE. THE TAHSILDAR, DOMAKONDA HAD REPORTED THAT SRI
BADDAM RAJI REDDY S/o BALL REDDY DIED ON 02.04.1994 LEAVING BEHIND THREE SONS
NAMELY BADDAM ANJIREDDY, MADHUSUDHAN REDDY AND NARSA REDDY. IN ALL THEY HAD
47.27 ACRES AND AFTER DISTRIBUTION EACH SON GOT 13.20 ACRES. SRI BADDAM NARSA
REDDY RETAINED 6.23 ACRES AND SOLD 6.19 ACRES FELL TO HIS SHARE. SINCE IT IS
PATTA LAND THE PATTEDAR HAS RIGHT TO SELL THE LANDS. SRI ANJI REDDY IS A
PETITION MONGER AND HAS NO RIGHT TO QUESTION SALE OF LANDS BY HIS BROTHER
FROM HIS PATTA LANDS. THE PETITIONER WERE ADVISED TO GET THE PROBLEM SOLVED,
IF ANY IN A CIVIL COURT AS THE LANDS ARE PATTA LANDS. |
|
07/01/2008 2550. |
DASARI
PRATAP BHIKNOOR
(V) BHIKNOOR
(M) |
I HAVE TWO GIRL CHILDREN AND I HAVE APPLIED FOR
G.C.P./ B.S.Y. IN THE YEAR 2004 - BUT SO FAR SANCTION IS NOT ACCORDED THOUGH
MY APPLICATION IS ACCEPTED AS ELIGIBLE - HOWEVER, SUBSEQUENTLY SANCTIONS WERE
ACCORDED TO (53) MEMBERS UPTO 2007 IGNORING MY APPLICATION - KINDLY ENQUIRE
AND DO JUSTICE. |
THE P.D.(DW&CDA) HAD REPORTED THAT AS PER THE
SENIORITY LIST MAINTAINED BY THE C.D.P.O., ICDS, DOMAKONDA NO APPLICATION WAS
RECEIVED FROM D.PRATAP, CALLER FOR SANCTION UNDER G.C.P.S. AS SUCH, HIS
APPLICATION WAS NOT CONSIDERED. |
|
07/01/2008 2551. |
K.SHANKAR RENJAL
(V) RENJAL
(M) |
I AM HAVING A STAMP WENDING LICENCE FOR THE PAST
FIVE YEARS - FOR RENEWAL I SUBMIT MY APPLICATION AT SUB-REGISTRAR OFFICE,
BODHAN WHO IN TURN SENDS TO DISTRICT REGISTRAR, NIZAMABAD FOR RENEWAL -
ACCORDINGLY, THE RENEWAL APPLICATION SUBMITTED BY ME FOR CURRENT YEAR IS
PENDING FOR THE PAST SEVERAL MONTHS CAUSING LOT OF INCONVENIENCE - KINDLY
ARRANGE FOR RENEWAL AS EARLY AS POSSIBLE. |
THE DIST. REGISTRAR HAD INFORMED THAT THE CALLER
HAD FILED APPLICATION FOR RENEWAL OF HIS LICENCE AFTER EXPIRY OF PRESCRIBED
TIME. THERE IS NO PROVISION FOR CONDONATION OF DELAY WAS SUBMITTING
APPLICATION FOR RENEWAL AS SUCH, HIS APPLICATION FOR RENEWAL OF LICENCE WAS
NOT CONSIDERED. FURTHER, THERE IS BAN ON APPOINTMENT OF FRESH STAMP VENDORS
TO CONSIDER HIS CASE AS A FRESH APPLICANT. |
|
07/01/2008 2552. |
PRABHAKAR DOMAKONDA
(V) DOMAKONDA
(M) |
I AM WORKING AS PRERAK AND THE C.E. CENTRE IS
FUNCTION IN A RENTED BUILDING - SINCE, APRIL LAST YEAR HONORARIUM IS NOT PAID
- SIMILARLY, HOUSE RENT, PAPER BILL ETC. ARE NOT PAID - THE HOUSE OWNER AND
PAPER DISTRIBUTOR IS PRESSING FOR PAYMENT - KINDLY ARRANGE IMMEDIATE RELEASE
OF FUNDS. |
THE D.D.(AE) HAD REPORTED THAT THE C.E.C. PRERAKS
WERE NOT RELEASED HONORARIUM AND OTHER BILLS FROM APRIL 2007 FOR WANT OF
RELEASE OF BUDGET. NOW, BUDGET IS RELEASED AND FILE IS UNDER PROCESS. THE
FUNDS WOULD BE RELEASE WITHIN A WEEK. |
|
07/01/2008 2553. |
YELLAREDDY
(V) YELLAREDDY
(M) |
IN YELLAREDDY MANDAL HEADQUARTERS EXISTING ROAD IS
BEING WIDENING - THE R&B DEPARTMENT HAVE REMOVED SOIL AND STONE METAL IS
DUMPED - AFTER THAT THE WORK IS STOPPED FOR THE PAST SIX MONTHS - PUBLIC WHO
WANT GO TO OFFICES ARE FACING LOT OF PROBLEM TO TREK THE ROAD - KINDLY INSTRUCT
THE R&B AUTHORITIES TO COMPLETE THE ROAD ON PRIORITY BASIS. |
THE E.E.(R&B), BODHAN HAD REPORTED THAT TRENCH
CUTTING IN THE WIDENING PORTION WAS DONE AND SIDE DRAINS ARE TO BE
CONSTRUCTED BEFORE FORMATION OF THE ROAD. SINCE, THERE WAS ENCROACHMENTS ON
EITHER SIDES, NOTICES WERE ISSUED FOR EVICTION BY THE PANCHAYAT SECRETARY AND
TAHSILDAR. AGGRIEVED BY THIS, THE ENCROACHERS HAVE APPROACHED HON'BLE HIGH
COURT. THE COUNTER WAS FILED AND NOW, THE HON'BLE COURT HAS DISMISSED THE
SUITE. AS SOON AS THE ENCROACHMENT IS
CLEARED DRAIN WOULD BE COMPLETED AND GRANULAR SUBWAYS AND WET MACADAM WOULD
BE LAID AS PER AGREEMENT. OTHER WISE THE DRAIN WATER WOULD DAMAGE THE NEW
FORMATION ROAD RESULTING COMPLAINTS OF NOT MAINTAINING STANDARDS WOULD COME
AFTER COMPLETION OF WORK. |
|
07/01/2008 2554. |
SANTOSH CH.KONDUR
(V) NANDIPET
(M) |
WE ARE IN OCCUPATION OF GOVT. LAND FOR PAST
SEVERAL YEARS - AFTER DEATH OF MY FATHER, I HAVE APPLIED FOR ASSIGNMENT AND
ISSUE OF PATTA CERTIFICATE WE ARE CULTIVATING THE LAND FROM OUR FATHERS TIME
- THE TAHSILDAR HAD FORWARDED MY APPLICATION TO THE SURVEYOR FOR SURVEY AND
REPORT - THE SURVEYOR HAD GIVEN (15) DAYS TIME BUT EVEN AFTER LAPSE OF
SEVERAL MONTHS HE IS NOT DOING SURVEY WORK AND SUBMITTING REPORT - KINDLY
INSTRUCT FOR EARLY SURVEY AND SANCTION OF ASSIGNMENT IN MY FAVOUR. |
THE TAHSILDAR, NANDIPET HAD REPORTED THAT THE
FATHER OF CALLER SRI SANTOSH WAS CULTIVATING AN EXTENT OF 1.00 ACRE IN
SY.NO.258/1. THE LAND COULD NOT BE ASSIGNED, AS THERE WAS A DISPUTE WITH THE
ADJACENT PATTEDARS. I HAVE INSPECTED THE LAND; HELD DISCUSSIONS WITH THE
ADJOINING PATTEDARS AND THE LAND WOULD BE ASSIGNED TO THE CALLER DURING THE
4TH PHASE OF LAND DISTRIBUTION. |
|
21/01/2008 2555. |
ULLENGULA
MUTTANNA GUMRIYAL
(V) MORTHAD
(M) |
I SUBMIT THAT I AM PATTEDAR OF SY.NO. 255 SITUATED
AT GUMMRIYAL VILLAGE OF MORTHAD MANDAL - MY NEIGHBOUR HAD ENCROACHED MY LAND
AND ILLEGALLY CULTIVATING - MY REQUEST TO EVICT FROM ENCROACHED LAND IS OF NO
USE - I REQUEST KINDLY TO INSTRUCT THE TAHSILDAR, MORTHAD TO ARRANGE SURVEY
AND HANDOVER MY LAND AS PER RECORDS. |
THE TAHSILDAR, MORTHAD HAD REPORTED THAT THE
CALLER WAS ASSIGNED GOVT. LAND IN SY. NO.255/3, EXTENT 0.35 ACRES. HE HAD
SOLD AWAY THIS LAND ON 07.02.2003 FOR CONSIDERATION OF Rs.53,550/- THE
TRANSACTION TOOK PLACE ON PLAIN PAPER. SINCE THE ALIENATION IS PROHIBITED U/S
(3) OF A.P. ASSIGNED LANDS P.O.T. ACT., ORDERS WERE PASSED ON 31.12.07 TO
RESTORE POSSESSION BACK TO THE ORIGINAL ASSIGNEE. PHYSICAL POSSESSION COULD
NOT BE HANDED OVER AS THE CALLER/ ASSIGNEE IS RESIDING IN ARMOOR AND REPRESENTING
FROM THERE. WHENEVER HE COMES TO GUMRIYAL VILLAGE PHYSICAL POSSESSION WOULD
BE HANDED OVER. |
|
21/01/2008 2556. |
VINOD
KUMAR HANUMAN
JUNCTION STREET BHEEMGAL
(V) BHEEMGAL
(M) |
I AM RESIDENT OF HANUMAN JUNCTION GALLI - IN OUR
STREET WE DO NOT HAVE DRAINAGE RESULTING STAGNATION OF WATER NEAR RESIDENTIAL
HOUSES CAUSING HEALTH PROBLEMS ON ACCOUNT OF MOSQUITOES - SIMILARLY, THERE IS
NO PROPER ROAD, STREET LIGHTS AND DRINKING WATER FACILITY - THE RESIDENTS OF
THIS STREET HAVE FILED APPLICATION ON 22.12.2007 - THE P.S. ASSURED TO SOLVE
THE PROBLEM WITHIN (3) DAYS - BUT, SO FAR NO ACTION IS TAKEN - KINDLY
INTERVENE AND DO JUSTICE BY IMPROVING BASIC MINIMUM FACILITIES. |
THE D.P.O. HAD REPORTED THAT THE G.P. HAD FILLED
LOW LAYING AREAS WITH MORRAM AND INSTALLED STREET LIGHTS AND ALSO SUPPLYING
DRINKING WATER AND THUS SOLVED THE GRIEVANCE. |
|
21/01/2008 2557. |
MALLESH VEERANNAGUTTA
(V) RENJAL
(M) |
THERE IS A P.W.D. VACANT LAND AT THE MAIN ROAD
LEADING TO OUR STREET - ONE PERSONS HAD ENCROACHED THIS LAND ILLEGALLY AND
TAKEN UP UNAUTHORISED CONSTRUCTION LEADING TO CLOSER OF APPROACH ROAD TO OUR
STREET - WE HAVE FILED COMPLAINT ON 17.12.2007 AND THE SARPANCH INSTRUCTED
HIM TO VACATE THE LAND - HE IS STATING THAT THE LAND BELONGS TO R&B
DEPARTMENT AND NOT TO G.P. AND AS SUCH SARPANCH HAS NO RIGHT TO ORDER FOR
EVICTION - KINDLY INSTRUCT CONCERNED TO EVICT THE ENCROACHER AND PROVIDE US
ROAD TO OUR STREET. |
THE D.P.O. HAD REPORTED THAT NOTICE WAS ISSUED BY
THE G.P. FOR REMOVAL OF ILLEGAL CONSTRUCTION ON P.W.D. ROAD. FURTHER ACTION WOULD
BE TAKEN AS PER RULES. |
|
21/01/2008 2558. |
RAMESH CH.KONDUR
(V) NANDIPET
(M) |
S.C. & S.T. COLONY MEMBERS ARE FACING DRINKING
WATER SHORTAGE AS THE RESIDENTS OF UPPER AREA ARE TAKING ILLEGAL CONNECTIONS
AND KEEPING THE TAPS OPEN RESULTING RESTRICTED FLOW TO S.C., S.T. COLONY -
KINDLY INSTRUCT THE CONCERNED TO REMOVE ALL ILLEGAL CONNECTIONS AND TO
INSTALL TAPS SO THAT WATER IS SUPPLIED TO S.C., S.T. COLONY. |
THE D.P.O. HAD REPORTED THAT THE FAILED ELECTRIC
MOTOR WAS REPLACED AND DRINKING WATER SUPPLY IS RESTORED. ENQUIRES MADE TO
TRACE OUT SRI CH.RAMESH, THE CALLER BUT, IT HAS COME TO NOTICE THAT NO PERSON
BY SUCH NAME IS RESIDING IN THE COLONY. AS SUCH, PERSONS DRAWING WATER
ILLEGALLY BY USING ELECTRIC MOTORS COULD NOT BE ESTABLISHED. |
|
21/01/2008 2559. |
KATTULA
SANKARAIAH MDL.
ORG. SECY., T.D.P. LAXMANDEVPALLY
(V) BHIKNOOR
(M) |
IN THE YEAR 1992 HOUSE SITE PLOTS WERE GIVEN TO
S.C., S.T. & B.C. MEMBERS - AROUND 10 MEMBERS WHO ARE ALLOTTED HOUSE
SITES ARE PRESENTLY NOT RESIDING IN THE VILLAGE AND THEIR WHEREABOUTS ARE NOT
KNOWN - WE HAVE REQUESTED FOR ALLOTMENT OF THESE TEN PLOTS TO ELIGIBLE
POOREST OF THE POOR FOR TAKING UP HOUSES UNDER INDIRAMMA HOUSING PROGRAMME,
AS THIS VILLAGE IS INCLUDED IN 2ND PHASE OF I.H.P. - BUT, THE SARPANCH IS
PROPOSING TO AUCTION THESE PLOTS WHICH IS IRREGULAR AND DEPRIVING THE POOR -
EARLIER TWICE WE HAVE STOPPED AUCTION ATTEMPT - NOW, THE SARPANCH IS TRYING
TO PASS A RESOLUTION IN G.P. MEETING FOR AUCTIONING OF THESE PLOTS -KINDLY
INSTRUCT THE TAHSILDAR TO TAKE THESE PLOTS INTO HIS CUSTODY AND ARRANGE FOR
DISTRIBUTION TO THE DESERVING POOREST OF THE POOR. |
THE TAHSILDAR, BHIKNOOR HAD REPORTED THAT GRAMA
SABHA WAS HELD ON 25.01.2008 AND THE ISSUE OF AUCTIONING OF PLOTS WAS
DISCUSSED. THE VILLAGERS UNANIMOUSLY RESOLVED TO ALLOT OPEN PLOTS OF PERSONS
NOT RESIDING IN THE VILLAGE TO THE ELIGIBLE S.Cs. UNDER INDIRAMMA PHASE-II
PROGRAMME 84 BENEFICIARIES WERE IDENTIFIED AND 80 BENEFICIARIES HAVE
CONSTRUCTED HOUSES. REMAINING FOUR BENEFICIARIES COULD NOT CONSTRUCT HOUSES
FOR WANT OF PLOTS. THE VACANT FOUR PLOTS WOULD BE ALLOTTED TO THESE FOUR
ELIGIBLE S.C. BENEFICIARIES AFTER CANCELLING THE EARLIER ALLOTMENT AS DESIRED
BY THE GRAMA SABHA. THUS THE PROBLEM IS SOLVED. |
|
21/01/2008 2560. |
Y.SATYANARAYANA VARNI
(V) VARNI
(M) |
I REQUEST TO BRING TO YOUR KIND NOTICE THE
FOLLOWING TWO PROBLEMS FOR TAKING IMMEDIATE REMEDIAL ACTION. 1) THERE IS A BONE FACTORY ON WAY FROM RUDRUR TO
BODHAN VERY NEARER TO RUDRUR SHIVAR - THIS FACTORY IS EMANATING FOUL SMELL
AND THE SMELL IS BEING SPREAD OVER 1 K.M. AS PER THE AIR MOVEMENT - THE ROAD
USERS HAVE TO COMPULSORILY USE HANKY TO COVER THEIR NOSES - SIMILARLY, THE
VILLAGERS ARE ALSO FACING LOT PROBLEM ON ACCOUNT OF THIS SMELL - KINDLY
INSTRUCT THE CONCERNED TO TAKE NECESSARY ACTION TO ARREST SPREADING OF SMELL
OR TO SHIFT THE FACTORY TO AN ISOLATED PLACE. 2) THE AUTO OWNERS/ DRIVERS HAVE INSTALLED SOUND
SYSTEMS IN THE AUTOS AND PLAYING SONGS AT HIGH FREQUENCY CAUSING SOUND
POLLUTION/ DISTURBANCE TO AGED, SICK PERSONS AND STUDENTS - IT IS ALSO
LEADING TO ACCIDENTS - KINDLY INSTRUCT THE CONCERNED TO REMOVE SOUND SYSTEM
FROM AUTOS IN THE INTEREST OF PUBLIC. |
THE D.P.O. HAD REPORTED THAT ON ACCOUNT OF BAKRID
ON 02.02.08 HUGE QUANTITY OF BONES WERE GATHERED AND DUE TO LACK OF LABOUR
THEY WERE NOT CLEANED AND DISPOSED, RESULTING EMANATING OF FOUL SMELL.
HOWEVER, THEY WERE CLEARED IN A WEEK AND SUCH OMISSIONS SHALL NOT REPEATED IN
FUTURE. THE D.T.C. HAD REPORTED THAT SUITABLE INSTRUCTIONS
WERE ISSUED TO M.V.I. FOR SEIZING AUTO RICKSHAWS THAT ARE PLYING DULY
INSTALLING SOUND SYSTEM UNAUTHORISEDLY. ACCORDINGLY, M.V.Is. HAVE INSPECTED
25 VEHICLES AND SEIZED 3 AUTO RICKSHAWS SO FAR. THE INSPECTION WOULD BE
CONTINUED. |
|
21/01/2008 2561. |
GANGA
REDDY PERKIT
(V) ARMOOR
(M) |
FOR WIDENING OF ROAD UNDER N.H.-7 OUR LANDS WERE
ACQUIRED - SO FAR NO LAND COMPENSATION IS PAID - IN SOME AREA COMMERCIAL
CROPS LIKE; TURMERIC, HYBRID MAIZE AND JOWAR IS EXISTING - THE CONTRACTOR IS
DAMAGING EXISTING CROPS FOR PURPOSE OF ROAD WIDENING - WE HAVE REPRESENTED
THE MATTER TO THE R.D.O., NIZAMABAD WHO ASSURED TO PAY COMPENSATION WITHIN 15
DAYS - BUT NO COMPENSATION IS PAID TILL DATE - KINDLY, STOP THE WORK TILL THE
CROPS ARE HARVESTED AND LAND COMPENSATION IS PAID SO THAT FARMERS MAY NOT
SUFFER AND PUT TO LOSS. |
THE R.D.O., NIZAMABAD HAD REPORTED THAT LAND
COMPENSATION FOR THE LANDS ACQUIRED UNDER PHASE-III AT PERKIT VILLAGE WAS
DISBURSED ON 25.01.2008 IN THE PRESENCE OF H.C.C. OFFICIALS. THEY HAVE
ASSURED TO PAY COMPENSATION FOR THE CROPS DAMAGED ON ACCOUNT OF ACQUISITION. |
|
21/01/2008 2562. |
DEVENDAR KYASAMPALLY
(V) KAMAREDDY
(M) |
I AM PATTEDAR OF LAND IN SY.NO.418 AND CULTIVATING
FOR THE PAST 18 YEARS - ONE PERSON NAMELY MANDA RAMAIAH S/o RAJAIAH, R/o
RAGHAVAPUR VILLAGE IS TRYING TO CLAIM TITLE OVER THIS LAND - I HAVE FILED
APPLICATION WITH THE TAHSILDAR AND R.D.O ON 18.09.2003 AND CONSTANTLY REMANDING NOT TO EFFECT ANY
CHANGES IN THE RECORDS - NOW, I HAVE COME TO KNOW THAT THE ABOVE NAMED PERSON
HAD SOLD AWAY MY LAND TO A R/o KAMAREDDY WITH OUT ANY RIGHT OVER THE LAND
WHEN I WENT TO DUBAI IN SEARCH OF EMPLOYMENT - I AM PUT TO LOT OF LOSS AND
HARDSHIP AS THIS IS ONLY LAND I HAVE TO EKE OUT MY LIVELIHOOD - KINDLY
INSTRUCT THE TAHSILDAR AND R.D.O. TO ENQUIRE INTO THE MATTER AND DO JUSTICE. |
THE R.D.O., KAMAREDDY HAD REPORTED THAT IN
SY.NO.101 GOVT. LAND WAS ASSIGNED TO MANY ELIGIBLE PERSONS (SY.NO.418 IS
WRONGLY REPORTED). THE CALLER WAS ASSIGNED 1.00 ACRE VIDE FILE NO.A2/1599/99
DATED 2.4.1999 AND HE IS POSSESSION OF THE LAND. ANOTHER PERSON BY NAME SRI
MANDA RAMAIAH IS ALSO CLAIMING POSSESSION OVER THIS LAND STATING THAT HE TOO
WAS ASSIGNED THIS LAND AND POSSESSION HANDED OVER. DURING THE COURSE OF
ENQUIRY, ON RECEIPT OF COMPLAINT SRI MANDA RAMAIAH WAS NOT AVAILABLE IN THE
VILLAGE. HE HAS BEEN SOME ONE TO APPEAR IN THE OFFICE ALONG WITH DOCUMENTARY
EVIDENCE. AS SOON AS HE COMES THE RECORD WOULD BE VERIFIED AND PROBLEM SORTED
OUT. |
|
21/01/2008 2563. |
BAPU
REDDY EX-SARPANCH YADARAM
(V) DOMAKONDA
(M) |
I HAVE LAID PIPELINE UNDER R.W.S. SCHEME AT
SIVARAMIREDDYPALLI VILLAGE - AFTER COMPLETION OF THE WORK RICE COUPONS WERE
ISSUED BUT THE F.P.S. DEALER IS STATING THAT NO RICE IS ALLOTTED FOR SUPPLY
ON THE COUPONS - THE S.E.(RWS) WHILE ENCLOSING THE COUPONS REQUESTED THE
D.M.(CS) TO RELEASE THE RICE - BUT SO FAR RICE IS NOT RELEASED AND I AM
SUFFERING FOR THE PAST TWO YEARS -KINDLY INSTRUCT THE D.M.(CS) TO RELEASE
RICE AS EARLY AS POSSIBLE. |
THE D.M.C.S. HAD REPORTED THAT NO RECORD
PERTAINING TO THE WORK ARE AVAILABLE IN HIS OFFICE SINCE IT PERTAINS TO YEAR
2000. AS SOON AS THE RECORD CALLED FOR IS RECEIVED THE SAME WOULD VERIFIED
AND ACTION TAKEN TO RELEASE THE ELIGIBLE RICE QUOTA. |
|
21/01/2008 2564. |
RAVINDER YERRAPAHAD
(V) TADWAI
(M) |
IN MY PATTA LAND "NANDIKUTTA CHERUVU" IN
ENDRIYAL SHIVAR WAS CONSTRUCTED - SO FAR NO COMPENSATION IS PAID - THE JOINT
COLLECTOR HAD INSPECTED THE SITE, HELD NEGOTIATIONS AND FIXED THE RATE AND
ASSURED TO PAY LAND COMPENSATION WITHIN 15 DAYS - BUT, SO FAR COMPENSATION IS
NOT PAID BY THE R.D.O., KAMAREDDY - KINDLY INSTRUCT THE R.D.O., KAMAREDDY TO
PAY LAND COMPENSATION AS EARLY AS POSSIBLE. |
THE R.D.O., KAMAREDDY HAD REPORTED THAT P.V. WAS
PREPARED PROPOSING LAND COMPENSATION OF Rs.80,000/- PER ACRE. THE
NEGOTIATIONS COMMITTEE WAS HELD IN THE CHAMBER OF J.C. ON 30.01.2008 AND THE
LAND COMPENSATION WAS FIXED BY ENHANCING TO Rs.85000/- PER ACRE. REVISED P.V.
WAS PREPARED AND SUBMITTED ON 01.02.08 IT SELF AND DRAFT AWARD PROPOSALS ARE
BEING PREPARED. AS SOON AS APPROVAL OF P.V. IS RECEIVED THE LAND COMPENSATION
WOULD BE DISBURSED. |
|
21/01/2008 2565. |
BHOOMAIAH YELLAREDDY
(V) YELLAREDDY
(M) |
EARLIER I HAVE REPRESENTED THAT THE APPROACH ROAD
OF 20 FEET TO CHILDREN'S PARK AT YELLAREDDY PROPER WAS ENCROACHED AND REDUCE
TO 15 FEET - SIMILARLY, DRAINS WERE CONSTRUCTED BY USING SUBSTANDARD MATERIAL
- ON THIS COMPLAINT THE D.P.O. HAD INSPECTED THE SPOT ON 17.03.2006 AND FOUND
THAT COMPLAINT MADE IS TRUE AND CORRECT - ( D.Y.C. NO.2327, DATED 13.03.2006)
- THE D.P.O. HAD SUBMITTED REPORT FOR EVICTION OF ENCROACHMENT OF 5 FEET ROAD
AND ALSO TO TAKE ACTION FOR SUBSTANDARD WORK - ORDERS OF THE COLLECTOR ARE
AWAITED IN THIS REGARD - KINDLY DISPOSE THE CASE EARLY AS CHILDREN ARE PUT TO
LOT OF INCONVENIENCE. |
THE D.P.O. HAD REPORTED THAT 20 FEET ROAD IS
EXISTING FROM P.W.D. ROAD TO CHILDREN PARK. IN NEW ABADI THE ROAD BETWEEN
NAGARATNAM AND ANANTHA RAO IS 14 FEET AFTER CONSTRUCTING SIDE DRAINS. THIS
ROAD EXISTS FOR THE PAST 30 YEARS. THERE IS NO FRESH ENCROACHMENT. THE SIDE
WERE CONSTRUCTED BY SPENDING FUNDS FROM M.P.D.O. AND THE QUALITY WAS
MAINTAINED. |
|
21/01/2008 2566. |
RAJU BHEEMGAL
(V) BHEEMGAL
(M) |
SRI SHANKAR, V.R.O. IS INDULGING IN LOT OF CORRUPT
PRACTICES - SRI SHANKAR IN COLLUSION WITH SRI TUKKAJI WHO IS RESIDING JUST
BEHIND POLICE STATION IS INDULGING IN PREPARING BOGUS PATTADAR PASS BOOKS AND
COLLECTING HUGE AMOUNT CAUSING LOSS TO THE GENUINE PATTEDARS - HE IS ALSO DEMANDING
AND COLLECTING Rs.400 TO 500 FOR ISSUE OF RESIDENTIAL AND OTHER CERTIFICATES
- KINDLY SURPRISE THE RESIDENCE OF SRI TUKKAJI AND SEIZE ALL THE PATTADAR
PASS BOOKS FROM HIS UNAUTHORISED CUSTODY AND TAKE SEVERE ACTION AGAINST SRI
SHANKAR, V.R.O. |
THE TAHSILDAR, BHEEMGAL HAD REPORTED THAT HE ALONG
WITH R.I. RUSHED AND SURPRISE H.NO.13-56/1 E IN WHICH RAMAVATH TUKKAJI IS
RESIDING AND SEARCHED ALL THE FIVE ROOMS IN THE PRESENCE OF PANCHAS. DURING
THE SEARCH NO PASS BOOKS AND TITLE DEEDS WERE FOUND IN THE HOUSE AND
ACCORDINGLY A PANCHANAMA WAS DRAWN. SIMILARLY, THE HOUSE OF V.R.O. WAS
SEARCHED AND NOTHING FOUND. SO FAR NO COMPLAINT OF COLLECTING AMOUNT FOR
ISSUE OF CERTIFICATES WAS RECEIVED AGAINST THE V.R.O. SHANKAR. EFFORTS WERE
MADE TO TRACE OF CALLER SRI RAJU. BY THIS NAME TWO PERSONS ARE RESIDING IN
THE VILLAGE OUT OF WHICH SRI BUKYA RAJU NAIK IS THE HUSBAND OF M.P.T.C.-4 OF
BHEEMGAL ANOTHER RAJU IS REPORTER OF SURYA NEWS PAPER AND BOTH OF THEM HAVE
DEPOSED THAT THE HAVE NOT CALLED D.Y.C. ON 21.01.2008. THE COMPLAINT AGAINST
THE V.R.O. SRI SHANKAR IS FALSE AND FABRICATED. |
|
04/02/2008 2567. |
MALLESH VEERANNAGUTTA
(V) RENJAL
(M) |
PLEASE REFER MY GRIEVANCE IN D.Y.C. ON 21.01.2008
REGARDING ENCROACHMENT OF P.W.D. LAND IN FRONT OF MY HOUSE AND TAKING UP
ILLEGAL CONSTRUCTION OF HOUSE AND COMPOUND WALL. THIS UNAUTHORISED
CONSTRUCTION IS BLOCKING APPROACH ROAD TO MY RESIDENCE. SINCE, NO ACTION IS
TAKEN FOR PAST 15 DAYS THE CONSTRUCTION IS GOING ON UNABATED. KINDLY INSTRUCT
THE CONCERNED TO INSPECT THE SITE AND STOP FURTHER CONSTRUCTION AND DISMANTLE
THE ILLEGAL CONSTRUCTION, SO THAT APPROACH ROAD TO MY HOUSE IS RESTORED. |
THE S.E.(R&B) HAD REPORTED THAT E.E.(R&B)
BODHAN HAD INSPECTED THE SITE AND FOUND THAT SRI VITTAL S/o SIDDAIAH HAD
ENCROACHED R&B ROAD TO EXTENT OF 12.5 FEET AT K.M. 6/4-6 RIGHT SIDE AND
CONSTRUCTED PUCCA HOUSE. THE TAHSILDAR, RENJAL WAS ADDRESSED TO EVICT THE
ENCROACHMENT. THE D.P.O. HAD REPORTED THAT 7 FEET ROAD WAS
ENCROACHED AND COMPOUND WALL CONSTRUCTED. AS SUCH THE G.P.P.S. WAS INSTRUCTED
TO REMOVE THE COMPOUND WALL AND REPORT COMPLIANCE. |
|
04/02/2008 2568. |
MALLA
SAILOO TADBILOLI
(V) RENJAL
(M) |
I HAVE APPLIED FOR SANCTION OF BORE WELL AND
ELECTRIC MOTOR IN THE YEAR 1996 - ACCORDINGLY, BORE WELL AND MOTOR WAS
SANCTIONED - THE BORE WELL WAS DRILLED IN 1996 IT SELF AND IT IS SUCCESSFUL -
BUT SO FAR ELECTRIC MOTOR IS NOT SUPPLIED DESPITE REPEATED REQUESTS AND
VISITS TO S.C. CORPORATION - THE PURPOSE OF DRILLING OF BORE WELL IS DEFEATED
WITHOUT SUPPLYING ELECTRICAL MOTOR FOR THE PAST 11 YEARS - KINDLY INTERVENE
AND ARRANGE SUPPLY OF ELECTRICAL MOTOR AS EARLY AS POSSIBLE. |
THE E.D.(S.C. CORP.) HAD REPORTED THAT THE CALLER
HAD NOT FILED APPLICATION FOR RELEASE OF MARGIN MONEY. THE UNIT COST OF
SUBMERSIBLE MOTOR IS Rs.33,000/-. THE BANK CONSENT FOR 50% I.E. Rs.16,500/-
ALONG WITH BENEFICIARY CONTRIBUTION IS FILED, ACTION TO RELEASE MARGIN MONEY
WOULD BE TAKEN. |
|
04/02/2008 2569. |
SOLOMON
JAUSHWA PASTOR NANDIPET
(V) NANDIPET
(M) |
I HAVE REQUESTED FOR ALLOTMENT OF GOVT. LAND FOR
BURIAL GROUND AT NANDIPET VILLAGE WHICH IS IN OUR CHURCH POSSESSION - R.D.O.,
NIZAMABAD HAD INSPECTED THE SPOT AND SUBMITTED PROPOSAL FOR GRANTING PATTA -
BUT SO FAR PATTA CERTIFICATE IS NOT ISSUED AND BOUNDARIES SHOWN - KINDLY
ARRANGE EARLY SANCTION SO THAT WE CAN PROTECT THE LAND BY CONSTRUCTING
COMPOUND WALL |
THE R.D.O., NIZAMABAD HAD REPORTED THAT PROPOSALS
WERE ALREADY SUBMITTED ON 19.12.2005. THE COLLECTORATE VIDE LR.NO.E2/532/06
HAVE CALLED FOR REPORT ON MARKET VALUE, SALE PARTICULARS AND JUSTIFICATION
REPORT. THE DETAILS ARE STILL AWAITED FROM TAHSILDAR, NANDIPET, WHO FAILED TO
FURNISH DETAILS DESPITE REMINDERS. AS SOON AS REPORT IS RECEIVED THE SAME
WOULD BE SUBMITTED TO THE COLLECTOR. |
|
04/02/2008 2570. |
SURESH
KUMAR YELLARAM
(V) BICHKUNDA
(M) |
THERE IS A U.P.S. SCHOOL IN OUR VILLAGE AND ONE
TEACHER NAMELY S.RAMULU IS NOT ATTENDING SCHOOL AND CLASSES FOR THE PAST TWO
MONTHS - ENQUIRY WITH THE H.M. REVEALED THAT HE IS ON ORAL DEPUTATION TO
NARSANNAPALLY VILLAGE AT KAMAREDDY WHICH IS NATIVE PLACE - NO SUBSTITUTE
ARRANGEMENT IS MADE RESULTING INCONVENIENCE TO THE STUDENTS - KINDLY CANCEL
HIS ORAL DEPUTATION OR DEPUTE ANOTHER TEACHER IN HIS PLACE AS ANNUAL EXAMS
ARE FAST APPROACHING - EARLY ACTION IS REQUESTED. |
|
|
04/02/2008 2571. |
MALLESH DEVAKKAPET
(V) BHEEMGAL
(M) |
OUR VILLAGE IS SELECTED UNDER INDIRAMMA ADARSHA
VILLAGE - 500 HOUSES WERE SANCTIONED - THE BRICK MANUFACTURER HAD COME TO AN
AGREEMENT TO SUPPLY BRICK FOR INDIRAMMA HOUSES AT Rs.1.00 EACH BRICK ON
CONDITION THAT THEY WOULD USE FOREST WOOD FOR BURNING OF KILNS - ACCORDINGLY,
THEY HAVE MANUFACTURED BRICK AND SUPPLIED TILL DECEMBER LAST YEAR - DURING
THIS YEAR THEY HAVE ENHANCE THE PRICE TO Rs.1.50 PER BRICK - THIS IS AGAINST
AGREEMENT AND CAUSING ADDITIONAL BURDEN ON POOR PERSONS WHO HAVE TAKEN UP
HOUSES UNDER INDIRAMMA HOUSING PROGRAMME - SINCE, THE MANUFACTURE HAD USED
FOREST TIMBER FOR BURNING OF KILNS, HE MAY BE DIRECTED TO SUPPLY AT Rs.1.00
PER BRICK ONLY - KINDLY INSTRUCT THE TAHSILDAR TO INTERVENE AND DO JUSTICE TO
THE POOR HOUSELESS PERSONS. |
THE TAHSILDAR, BHEEMGAL HAD REPORTED THAT THE
MANUFACTURER, VILLAGE ELDERS AND BENEFICIARIES UNDER INDIRAMMA HOUSING WERE
CALLED AND THE ISSUE DISCUSSED. THE MANUFACTURER HAVE STATED THAT DUE TO
ENHANCEMENT IN WAGE COMPONENT IT WOULD BE DIFFICULT TO SUPPLY BRICKS AT
Rs.1.50 PER BRICK. AFTER DISCUSSIONS IT WAS DECIDED TO SUPPLY BRICKS AT
Rs.1.25 AND DELIVER AT CONSTRUCTION SITE. ALL THE THREE PARTIES HAVE AGREED
AND ACCORDINGLY PANCHANAMA DRAWN AND THUS PROBLEM SOLVED. |
|
04/02/2008 2572. |
MAHENDER NALLAMADUGU
(V) LINGAMPET
(M) |
I HAVE APPLIED FOR SANCTION OF EDUCATION LOAN FOR
MY SON AT I.O.B., LINGAMPET - THE MANAGER IS REFUSING TO ADVANCE THE LOAN -
ANTICIPATING SANCTION I HAVE AVAILED LOANS FROM FINANCE COMPANIES AT HIGHER
RATE - KINDLY INTERVENE AND ARRANGE FOR SANCTION OF LOAN. |
|
|
04/02/2008 2573. |
NARENDER VIDYA
VOLUNTEER KAMAREDDY
(V) KAMAREDDY
(M) |
I AM WORKING AS VIDYA VOLUNTEER AT S.C. WADA
PRIMARY SCHOOL - HONORARIUM WAS PAID UP TO OCTOBER 2007 - THEREAFTER NO
HONORARIUM IS PAID - KINDLY ARRANGE FOR PAYMENT OF HONORARIUM FROM NOVEMBER
2007 TO JANUARY 2008 AS EARLY AS POSSIBLE. |
THE D.E.O. HAD REPORTED THAT HANARORIUM TO VIDHYA
VOLUNTEERS OF PRIMARY AND UPPER PRIMARY SCHOOLS COULD NOT BE PAID FROM
NOVEMBER 2007 TO JANUARY 2008 FOR WANT OF RELEASE OF BUDGET FROM S.P.D.,
RVM(SSA), HYDERABAD. NOW THE BUDGET IS RELEASED AND THE SAME WOULD BE RELEASE
TO M.E.Os WITHIN TWO DAYS. |
|
04/02/2008 2574. |
NADIPI
RAJESHWAR MUPKAL
(V) BALKONDA
(M) |
WE ARE IN PHYSICAL POSSESSION OF GOVT. LAND IN
125, 144/15 ETC. SINCE VERY LONG TIME - EARLIER WE WERE ALSO ISSUED PATTEDAR
PASS BOOKS - BUT SO FAR PATTA CERTIFICATES ARE NOT ISSUED - WE HAVE BEEN
APPROACHING THASILDAR, BALKONDA TIME AND AGAIN AND HE KNOWS THE FACT VERY
WELL - BUT DUE TO POLITICAL PRESSURE HE IS NOT GIVING PATTA CERTIFICATES AND
AS SUCH THOUGH WE ARE IN PHYSICAL POSSESSION COULD NOT AVAIL ANY LOANS -
KINDLY INSTRUCT THE TAHSILDAR TO ISSUE PATTA CERTIFICATES AS EARLY AS
POSSIBLE. |
THE THASILDAR, BALKONDA HAD REPORTED THAT BASING
ON THE PATTADAR PASS BOOKS AND TITLE DEEDS WERE ISSUED ON 30.01.2008. THE
LAND ASSIGNED REQUIRES DEVELOPMENT AND AS SUCH M.P.D.O. HAD SUBMITTED
PROPOSALS FOR DEVELOPING UNDER C.L.D.P. THE PROBLEM IS SOLVED. |
|
04/02/2008 2575. |
BANDI
NAGULU BHIKNOOR
(V) BHIKNOOR
(M) |
I SUBMIT THAT GOVT. HAVE ASSIGNED LAND LONG BACK
AND MY FATHER WAS IN PHYSICAL POSSESSION - NOW MY FATHER HAD EXPIRED AND I
HAVE APPLIED FOR TRANSFER ON MY NAME - BUT, THE TAHSILDAR IS REFUSING TO
EFFECT CHANGES - KINDLY INSTRUCT THE TAHSILDAR TO DO JUSTICE. |
THE TAHSILDAR, BHIKNOOR AN EXTENT OF 4.06 ½ ACRES
WAS ASSIGNED TO BANDI MALLAIAH LONG BACK AND AFTER HIS DEATH THE LANDS WERE
TRANSFERRED IN THE NAME OF BANDI NAGULU S/o MALLAIAH IN SY.NO.1116. THE LANDS
WERE KEPT FALLOW FOR LONG TIME AND THORNY BUSHES HAVE GROWN. ONE SRI RAMI
REDDY S/o RAMI REDDY HAD DEVELOPED THE LAND TO AN EXTENT OF 01.00 ACRE HENCE
THIS COMPLAINT. A NOTICE IN FORM-II UNDER RULE 3 FOR APAL (PT) RULES, 2007
WAS ISSUED TO KUNTA RAMI REDDY AND FURTHER, ACTION WOULD BE TAKEN ON RECEIPT
OF REPLY. |
|
04/02/2008 2576. |
GOLLA
GANGADHAR BEEDI
COLONY TADKOLE
(V) BANSWADA
(M) |
BEEDI WORKERS WERE SANCTIONED 102 HOUSES - OUT OF
WHICH 45 HOUSES ARE UNDER PROGRESS - REMAINING BENEFICIARIES ARE LIKELY TO
START ON VASANTHA PANCHAMI I.E. 11TH OF THIS MONTH - DUE TO IMPROPER SUPPLY
OF POWER WE ARE UNABLE TO DRAW WATER FROM THE BORE WELL - RESULTING SLOW
PROGRESS - KINDLY ARRANGE TO SANCTION ONE TRANSFORMER TO THIS COLONY FOR
BETTER POWER SUPPLY - ALSO E.G.S. WAGES FOR EARTH WORK DONE IS ALSO NOT PAID
- KINDLY ARRANGE IMMEDIATE PAYMENT FOR INVESTING IN HOUSE CONSTRUCTION. |
THE D.M. HOUSING HAD REPORTED THAT POWER SUPPLY IS
BEING DONE ON ROTATION BASIS AND DURING DAY TIME POWER CUT THE BENEFICIARIES
ARE FACING SHORTAGE OF WATER. MORE OVER THERE IS NO PROVISION FOR PROVIDING
TRANSFORMER UNDER BEEDI WORKERS HOUSING COLONY. IF THE BENEFICIARIES WANT A
SEPARATE TRANSFORMER THEY MAY CONTACT THE N.P.D.C.L. AUTHORITIES AND PAY THE
REQUIRED DEPOSITS FOR INSTALLATION OF NEW TRANSFORMER. |
|
04/02/2008 2577. |
SAYANNA KOLIPYACK
(V) JAKRANPALLY
(M) |
I AM AN HEART PATIENT AND SUFFERING ON ACCOUNT OF
FORMATION OF HOLE IN HEART - KINDLY EXTEND POSSIBLE HEALTH FOR HEART SURGERY
AS DOCTORS HAVE ADVISE SURGERY AS THERE IS NO OTHER ALTERNATIVE - EARLY
CONSIDERATION IS REQUESTED. |
THE D.C.H.S. HAD REPORTED THAT THE PATIENTS SRI
SAYANNA HAD BEEN REFERRED TO M.G.M. HOSPITAL, WARANGAL FOR FURTHER
INVESTIGATION AND HEART SURGERY, IF REQUIRED ON 05.02.2008. |
|
04/02/2008 2578. |
DATTU BIBIPET
(V) DOMAKONDA
(M) |
A DEFUNCT WELL IS EXISTING JUST BEHIND MY
RESIDENTIAL HOUSE - THE PLACE COVERED BY THIS WELL IS IN THE CUSTODY OF G.P.
- THE RESIDENTS AROUND THIS WELL ARE USING THIS WELL AS SEPTIC TANK BY
LETTING OUT THEIR WASTE DIRECTLY INTO THIS WELL - THIS IS LEADING TO
EMANATING OF FOUL SMELL WHICH IS CAUSING HEALTH PROBLEMS - KINDLY INSTRUCT
THE G.P. TO FILL THIS WELL AND INSTRUCT THE HOUSE HOLDS TO LET OUT THEIR
WASTE TO THE DRAINAGE - I HAVE BEEN REPRESENTING THIS ISSUE SINCE THE TENURE
OF SRI SHASHANK GOEL, I.A.S., - THE PANCHAYAT OFFICIALS FROM DISTRICT ARE
VISITING, HOLD DISCUSSIONS WITH THE HOUSE HOLDS AND LEAVING WITHOUT SOLVING
THE PROBLEM - KINDLY DO JUSTICE. |
THE D.P.O. HAD REPORTED THAT THE OLD WELL HAS TO
BE CLOSED UNDER N.R.E.G.S. AS NO OWNER IS CLAIMING THE WELL. FURTHER, THE
ADJACENT HOUSE HOLDERS WERE INSTRUCTED TO USE SEPTIC TANKS INSTEAD OF DIRECTLY
LETTING OUT THE WASTE INTO WELL. |
|
18/02/2008 2579. |
NARSINGA
RAO RAJANAGAR NANDIPET
(V) NANDIPET
(M) |
I HAVE CONSTRUCTED NEW HOUSE IN RAJANAGAR OF
NANDIPET PROPER - I HAVE REMITTED Rs.1400/- BY WAY OF D.D. AND APPLIED FOR
DOMESTIC CONNECTION ON 25.01.2008 - AFTER WAITING FOR A WEEK I HAVE
APPROACHED LINE MAN SRI RAJENDER, A.E. APPA RAO FOR PROVIDING DOMESTIC
CONNECTION, AS THERE WAS NO RESPONSE - BOTH OF THEM HAVE DEMANDED Rs.1000/-
AS BRIBE - I REFUSE TO PAY - THEY HAVE ABUSED ME IN FILTHY LANGUAGE AND
THREATENED TO REPORT TO ANY BODY - I REQUEST KINDLY TO ENQUIRE AND ARRANGE
FOR DOMESTIC CONNECTION ON PRIORITY BASIS. |
THE SE(NPDCL) HAS REPORTED THAT ENQUIRY WAS
CONDUCTED IN THE PRESENCE OF COMPLAINANT IN SRI NARSING RAO, K.RAJENDER,
LINEMAN AND S.APPA RAO, ASST. LINEMAN AND STATEMENTS RECORDED. THE
COMPLAINANT HAD STATED THAT HE FILED
COMPLAINT EMOTIONALLY AND NO MONEY WAS PAID. THE WORK RELATING TO COMPLAINANT
WAS COMPLETED ON 20TH FEBRUARY, 2008 AND THUS GRIEVANCE IS SOLVED. |
|
18/02/2008 2580. |
MADAPPA BODHAN
(V) BODHAN
(M) |
SMT. BAGARTHI BAI WAS PATTEDAR OF SY.NO. 704
SITUATED AT CHIMRAJPALLY VILLAGE OF NANDIPET MANDAL - I AM THE LEGAL HEIR OF
THE PATTEDAR - I HAVE NOT SOLD THIS LAND TO ANY ONE - WRITE FROM 1963-64 THE
NAME OF SMT. BARGATHI BAI IS FOUND - SOME UNSOCIAL ELEMENTS WITH MALAFIDE
INTENTION TO GRAB THE LAND HAVE CREATED FALLS DOCUMENTS AND GOT THE NAME
TRANSFERRED AND OBTAIN PATTADAR PASS BOOK AGGRIEVED BY THIS I HAVE FILED
PETITION BEFORE THE M.R.O., NANDIPET - BUT SO FAR NO ACTION IS TAKEN - KINDLY
ENQUIRE AND DO JUSTICE TO THIS OLD MAN AS THE CASE IS PENDING FOR THE PAST
SEVERAL YEARS. |
THE R.D.O., NIZAMABAD HAD REPORTED THAT LAND
BEARING SY.NO.704 EXTENT 2.04 ACRES SITUATED AT NANDIPET VILLAGE WAS STANDING
IN THE NAME OF BANJA SAMBASHIVA RAO AND SMT. BAGIRATTHI BAI AS PER PAHANI OF
1963-64. AND SRI LANKE KISTAIAH WAS RECORDED AS OCCUPANT . IN THE YEAR
1972-73 THE NAME OF LANKE KISTAIAH WAS RECORDED AS PATTEDAR AND HE SOLD THAT
LAND TO ONE SMT. GOPI CHINNI CHINNU BAI W/o MOGULAJI AND R.O.R. WAS
IMPLEMENTED VIDE PROC. NO.5876/95, DATED 03.10.1996 AND P.P.B. WAS ISSUED
VIDE KATHA NO.397. REGARDING SY.NO.354 AC 1.26 ACRES AND 362 AC 0.26
ACRES SITUATED AT CHIMRAJPALLY VILLAGE OF NANDIPET MANDAL, THE PATTEDAR
MADAPPA S/o DHARAMPURI HAD REGISTERED THESE LANDS IN FAVOUR OF PENTA SAYA
GONDA VIDE REGISTERED DOCUMENT NO.14/06 DATED 03.01.2006 AND SMT. THOTA PEDDA
SWAROOPA VIDE DOCUMENT NO.13/06 DATED 03.01.2006 |
|
18/02/2008 2581. |
YEMBARI
RAJU REDDYPET
(V) MACHAREDDY
(M) |
I AM A CANCER PATIENT AND UNDER GOING TREATMENT -
SO FAR I HAVE SPENT Rs.1.50 LAKHS FOR MY TREATMENT - NOW I HAVE NO MONEY WITH
ME - THEREFORE, I HAVE APPLIED FOR ASSISTANCE UNDER C.M.R.F. VIDE PRAJAVANI
APPLICATION NO.565, DATED 29.10.2007 - THE APPLICATION WAS FORWARDED TO THE
R.D.O., KAMAREDDY ON 12.11.2007 - BUT SO FAR MY PROPOSALS ARE NOT SENT TO
GOVT. - KINDLY EXPEDITE PROPOSAL AND ARRANGE ASSISTANCE FOR CONTINUING MY
TREATMENT. |
THE D.R.O. HAD REPORTED THAT THE CALLER HAD FILED
APPLICATION FOR ASSISTANCE UNDER C.M.R.F. BUT FAILED TO FILE THE APPLICATION
IN THE FORMAT PRESCRIBED BY THE GOVT. HOWEVER, THE TAHSILDAR, MACHAREDDY WAS
INSTRUCTED TO OBTAIN APPLICATION IN THE PRESCRIBED FORMAT AND SUBMIT PROPOSAL
THROUGH THE R.D.O., KAMAREDDY FOR ADDRESSING GOVT. |
|
18/02/2008 2582. |
NOOTHA
RAJANNA PALDA
(V) NIZAMABAD
(M) |
A POWER LINE IS PASSING THROUGH MY FIELDS - THE
SUPPLY LINES ARE VERY LOW ON ACCOUNT OF DAMAGE TO THE POLE - THE LOW LAYING
POWER LINES ARE COMING IN CONTACT WITH TREES RESULTING FREQUENT POWER
FAILURES - COMPLAINT WITH THE CONCERNED TO LIFT THE WIRES DID NOT YIELD ANY
RESULT - KINDLY INTERVENE AND INSTRUCT THE CONCERNED TO RECTIFY THE DEFECT. |
THE SE (NPDCL) HAD REPORTED THAT THE LOOSE LINES
HER RECTIFIED ON 22.02.2008 AND GRIEVANCE IS REDRESSED. |
|
18/02/2008 2583. |
SANTOSH
KUMAR OOTPALLY
(V) BODHAN
(M) |
IN OUR VILLAGE N.R.E.G.S. WORKS ARE GOING ON BUT
NO EMPLOYMENT IS PROVIDED TO THE WAGE SEEKERS - THE EARTH WORK IS BEING DONE
BY USING J.C.B. AND TRACTORS - ON OUR COMPLAINT THE WORKS WERE STOPPED AND NO
EMPLOYMENT IS BEING PROVIDED TO WAGE SEEKERS - KINDLY ENQUIRE AND ARRANGE
PROVIDING EMPLOYMENT TO WAGE SEEKERS. I HAVE APPLIED FOR INFORMATION UNDER R.T.I. ACT
WITH THE M.P.D.O., BODHAN - HE IS DEMANDING TO DEPOSIT Rs.1500/- - KINDLY DO
JUSTICE. |
THE C.E.O.(ZP) HAD REPORTED THAT IN OOTPALLY
VILLAGE WORKS WERE TAKEN UP FROM 01.04.2006. FOR FURNISHING INFORMATION OF
ALL THESE WORKS AROUND 500 PAGES ARE TO BE XEROXED. THE CALLER WAS THEREFORE
INSTRUCTED TO REMIT Rs.1500/- TOWARDS XEROX CHARGES WHICH HE FAILED TO OBLIGE
AND FILE COMPLAINT IN D.Y.C. |
|
18/02/2008 2584. |
G.SURENDER
REDDY C.E.C.
PRERAK REDDIPET
(V) MACHAREDDY
(M) |
I AM WORKING AS C.E.C. PRERAK AND LOOKING AFTER 14
CENTRES - SALARIES ARE NOT PAID FROM APRIL 2007 - SIMILARLY, OTHER CHARGES
ARE ALSO NOT RELEASED - WE ARE SUFFERING A LOT FOR WANT OF SALARIES AND HOUSE
OWNERS AND PAPER VENDORS ETC. ARE PRESSING FOR PAYMENT - KINDLY ARRANGE TO
RELEASE FUNDS. |
THE D.D. (AE) HAS REPORTED THAT THE BUDGET IS
RELEASED FOR TWO MONTHS TOWARDS HONORARIUM TO PRERAKS AND NODAL PRERAKS AND AS
PER DECISION TAKEN BY THE DIST. ADMINISTRATION. |
|
18/02/2008 2585. |
S.C.
WADA. KAMAREDDY
(V) KAMAREDDY
(M) |
I AM WORKING AS C.E.C. PRERAK- SALARIES ARE NOT
PAID FROM APRIL 2007 - SIMILARLY, OTHER CHARGES ARE ALSO NOT RELEASED - WE
ARE SUFFERING A LOT FOR WANT OF SALARIES AND HOUSE OWNERS AND PAPER VENDORS
ETC. ARE PRESSING FOR PAYMENT - KINDLY ARRANGE TO RELEASE FUNDS. |
THE D.D. (AE) HAS REPORTED THAT THE BUDGET IS
RELEASED FOR TWO MONTHS TOWARDS HONORARIUM TO PRERAKS AND NODAL PRERAKS AND
AS PER DECISION TAKEN BY THE DIST. ADMINISTRATION. |
|
18/02/2008 2586. |
GANGADHAR ARMOOR
(V) ARMOOR
(M) |
WHILE OBTAINING NEW TELEPHONE CONNECTION I HAVE
DEPOSITED N.S.S.s WORTH Rs.5000/- AS SECURITY DEPOSIT WITH B.S.N.L. DURING
THE YEAR 2000 - I HAVE BEEN PAYING TELEPHONE BILLS REGULARLY - NOW THE N.S.S.
CERTIFICATES ARE MATURED AND I HAVE APPLIED FOR RETURN OF THE N.S.C. WITH THE
CONCERNED AUTHORITIES - BUT B.S.N.L. AUTHORITIES ARE NOT RETURNING FOR THE
PAST SIX MONTHS - KINDLY INTERVENE AND DO JUSTICE. |
|
|
18/02/2008 2587. |
TODBILOLI
(V) RENJAL
(M) |
FOR CONSTRUCTION OF ALISAGAR L.I. SCHEME A CAMP
WAS ERECTED - APPROACH ROAD TO THIS CAMP IS PASSING THROUGH MY LAND IN
SY.NO.1008 - ON ACCOUNT OF THIS I COULD NOT RAISE ANY CROP IN THIS AREA FOR
THE PAST TWO YEARS - THE R.D.O. BODHAN HAS NOT ISSUED ANY NOTIFICATION FOR
ACQUIRING THIS LAND AND PAYMENT OF COMPENSATION - KINDLY INSTRUCT R.D.O. TO
ACQUIRE THIS LAND AND ARRANGE PAYMENT OF LAND COMPENSATION. |
|
|
18/02/2008 2588. |
PRATAP
REDDY H.NO.1-23 UGRAWAI
(V) KAMAREDDY
(M) |
I MET WITH AN ACCIDENT AND MY BODY BELOW ABDOMEN
HAS BECOME USELESS FOR THE PAST 8 YEARS - WE HAVE PATTA LAND AND ON ACCOUNT
OF MY POOR CONDITION I AM INTENDING TO SELL THE LAND THAT FELL TO MY SHARE -
BUT MY BROTHERS ARE OBJECTING - THEY ARE NEITHER ALLOWING TO SELL NOR TAKE
THE LAND BY THEMSELVES PAY THE LAND VALUE
- KINDLY INTERVENE AND DO JUSTICE AS I CAN NOT MOVE FROM MY BED. |
THE TAHSILDAR, KAMAREDDY HAD REPORTED THAT THE
CALLER N.PRATAP REDDY HAD ALREADY SOLD THE LAND FELL TO HIS SHARE. SIMILARLY
HIS BROTHER AND FATHER HAVE ALSO SOLD THE LAND FELL TO THEIR SHARE. ALL OF
THEM ARE HAVING PATTA PASS BOOKS. THE FAMILY DISPUTE WAS KEPT IN THE VILLAGE
COMMITTEE AND VILLAGERS HAVE SETTLED THE ISSUE BETWEEN PATTEDARS AND
PURCHASERS. ACCORDINGLY, THE LANDS ARE BEING CULTIVATED. |
|
03/03/2008 2589. |
AKULA
SAILOO DADGI
BIG (V) BICHKUNDA
(M) |
I AM A SURRENDERED EXTREMIST AND RESIDENT OF DADGI
BIG VILLAGE OF BICHKUNDA MANDAL - I WAS ALLOTTED ONE HOUSE PLOT OPP. S.B.H. BICHKUNDA UNDER REHABILITATION
PACKAGE - A CASE WITH THE NEIGHBOUR ON THE REAR SIDE WAS PENDING IN THE COURT
OF JOINT COLLECTOR - WHILE THE CASE IS PENDING, ANOTHER PLOT IN THE SAME AREA
IS ISSUED BY THE TAHSILDAR - KINDLY ARRANGE TO DISPOSE THE PENDING CASE SO AS
TO ENABLE ME TO TAKE UP CONSTRUCTION. |
THE TAHSILDAR, BICHKUNDA HAD REPORTED THAT THE
CALLER IS NOT RESIDING IN THE VILLAGE AND PRESENTLY RESIDING IN HYDERABAD.
THERE IS A DISPUTE OVER THE HOUSE SITE PATTA CERTIFICATE ISSUED AND THE CASE
IS PENDING IN M.M. COURT, BICHKUNDA. AFTER DISPOSAL OF CASE FURTHER ACTION
WOULD BE TAKEN. |
|
03/03/2008 2590. |
EX-SARPANCH OLD
VARNI (V) VARNI
(M) |
IN OLD VARNI A SENDHI SHOP IS ESTABLISHED BETWEEN
LAXMI TEMPLE AND G.P. OFFICE CAUSING INCONVENIENCE TO THE DEVOTEES AND TO THE
PUBLIC ATTENDING G.P. OFFICE - SEVERAL REPRESENTATIONS BY THE PUBLIC TO SHIFT
THE SENDHI SHOP DID NOT YIELD ANY RESULT AND THERE IS NO PROPER RESPONSE FROM
EXCISE OFFICIALS - KINDLY ARRANGE FOR INSPECTION OF SITE AND SHIFT THE SHOP
TO VILLAGE BOUNDARY TO AVOID INCONVENIENCE TO THE PUBLIC. |
THE SUPERINTENDENT (P&E), NIZAMABAD HAD
REPORTED THAT THE EXCISE INSPECTOR VISITED OLD VARNI AND ENQUIRED ABOUT
RUNNING OF UNAUTHORISED SENDHI SHOP NEAR LAXMI TEMPLE. IT WAS REVEALED THAT
NO SUCH SHOP IS EXISTED AND FUNCTIONING IN BETWEEN LAXMI TEMPLE AND G.P.
OFFICE. THE LICENSED SHOP WAS ALSO VERIFIED AND FOUND THAT IT IS FUNCTIONING
IN THE PREMISES AS AUTHORISED IN THE LICENCE. AS SUCH, THERE IS NO TRUTH IN
THE COMPLAINT FILED. THE SAME MAY BE CLOSED. |
|
03/03/2008 2591. |
EX-SARPANCH VARNI
(V) VARNI
(M) |
IN VARNI VILLAGE HOUSE SITE PLOTS ARE BEING
ALLOTTED TO ELIGIBLE PERSONS - BUT, THE TAHSILDAR IS SHOWING PARTIALITY AND
NOT ALLOTTING PLOTS TO S.C. BENEFICIARIES - HE IS ALLOTTING PLOTS TO BCs AND
INELIGIBLE PERSONS INCLUDING THOSE WHO ARE GIVING BRIBE - KINDLY ENQUIRE IN
TO THE DETAILS OF ELIGIBILITY OF ALLOTTERS AND DO JUSTICE TO S.C./ ELIGIBLE
BENEFICIARIES. |
|
|
03/03/2008 2592. |
MEESALA
SRINIVAS BHEEMGAL
(V) BHEEMGAL
(M) |
IN BHEEMGAL VILLAGE PUBLIC ARE FACING ACUTE
DRINKING WATER PROBLEM SEVERAL
REPRESENTATION TO THE E.O. DID NOT YIELD ANY RESULT AND HE IS NOT READY TO
SOLVE THE PROBLEM - KINDLY VERIFY THE FACT BY DEPUTING A DISTRICT LEVEL
OFFICER AND SOLVE THE DRINKING WATER PROBLEM. |
THE E.E.(RWS) HAD REPORTED THAT THE FOLLOWING
DRINKING WATER SUPPLY SCHEMES ARE FUNCTIONING IN THE VILLAGE I.E. OHSRs OF 60
K.L. TWO, 90 K.L. ONE, 250 K.L. ONE, 2500 LTRS 20 NOS., HAND PUMPS 52 Nos.,
AND WATER IS BEING PUMPED THROUGH INFILTRATION WELL FROM VAGU. THE SARPANCH
AND SECRETARY HAVE INFORMED THAT THERE IS NO WATER PROBLEM IN THE VILLAGE. IN
FUTURE, IF ANY SUCH PROBLEM ARISES THE G.P. HAS FUNDS TO TAKE UP BORE WELLS
ON WAR FOOTING BASIS TO SOLVE THE PROBLEM. |
|
03/03/2008 2593. |
VENKATESHWAR
RAO SALOOR
CAMP (V) BODHAN
(M) |
I HAVE APPLIED FOR LOAN IN SYNDICATE BANK, BODHAN
- THE MANGER HAD ASSURED TO ADVANCE LOAN AFTER TWO MONTHS - THE CROP LOAN
AVAILED HAD BEEN CLEARED AND NO DUES ARE OUTSTANDING - DESPITE OF THIS, THE
MANAGER IS MAKING US TO GO ROUND THE BANK FOR THE PAST ONE YEAR - LAST WEEK
WE HAVE ASK THE MANAGER TO INFORM THE DATE ON WHICH THE LOAN WOULD BE GIVEN -
AGGRIEVED BY THIS, THE MANAGER HAD FILED A FALSE COMPLAINT IN THE POLICE
STATION - KINDLY ARRANGE ENQUIRY INTO THE MATTER AND DO JUSTICE. |
THE L.D.M., HAD REPORTED THAT REPLY IS AWAITED
FROM BRANCH MANAGER, SYNDICATE BANK, BODHAN. |
|
03/03/2008 2594. |
RACHAPPA OLD
VARNI (V) VARNI
(M) |
BUSES TO NIZAMABAD ARE NOT AVAILABLE AT 06.00 A.M. EITHER FROM BANSWADA DEPOT OR FROM BODHAN DEPOT - THE G.P. HAD PASSED A RESOLUTION REQUESTI | |