Click for Dial Your Collector Replies from 18.06.2007 to 31.12.2008

 

DIAL YOUR COLLECTOR REPORTS - 2009

DATE & ID NO.

CALLER NAME & ADDRESS

GRIEVANCE

REPLY

19/01/2009

2713.

SATYANANDAM     

PERKIT (V) 

ARMOOR (M)

EARLIER IN OUR G.P. BRANCH LIBRARY WAS FUNCTIONING - DUE TO SOME UNAVOIDABLE CIRCUMSTANCES THE LIBRARY WAS CLOSED - ON CONSTANT REPRESENTATIONS FROM THE PUBLIC A RESOLUTION WAS PASSED ONE YEAR BACK TO RESTART THE BRANCH LIBRARY IN THE PREMISES OF G.P. - BUT, SO FAR NO ACTION IS TAKEN BY THE SARPANCH TO RESTART THE LIBRARY.

 

SIMILARLY, A POLE IS REQUIRED TO ARRANGE STREET LIGHT AT A VULNERABLE POINT - BUT THE SARPANCH IS NOT TAKING ANY ACTION TO SECURE THE POLE - KINDLY INSTRUCT THE SARPANCH TO COMPLETE THE ABOVE WORKS ON PRIORITY BASIS.

THE D.P.O. HAD REPORTED THAT LIBRARY BUILDING IS DUE FOR INAUGURATION AND AS SOON AS INAUGURATIONS OVER THE LIBRARY WOULD BE STARTED. SIMILARLY SECRETARY, Z.G.S. HAD ALSO INFORMED THAT THE G.P. WAS REQUESTED TO IDENTIFY A SUITABLE PERSON TO RUN THE LIBRARY FOR WHICH A REMUNERATION OF Rs.300/- WOULD BE PAID.

19/01/2009

2714.

Y.RAJASHEKAR

KAMMARPALLI (V) 

KAMMARPALLI (M)

THE TAHSILDAR, KAMMRPALLI IS INSISTING FOR NOTARY FOR OBTAINING CERTIFICATE OF RESIDENCE - THOUGH WE OBTAINED CERTIFICATE FROM THE V.R.O./MRI/EPIC CARD, THE TAHSILDAR IS STILL INSISTING FOR NOTARY - TO GET A NOTARY ONE HAS TO GO TO ARMOOR AND OBTAIN THE SAME BY SPENDING A MINIMUM OF RS.150/- - THIS IS NOT ONLY BURDEN ON THE POOR STUDENTS BUT ALSO CONSUMING TIME - SINCE THIS PROCEDURE IS NOT BEING FOLLOWED IN OTHER MANDALS KINDLY ISSUE SUITABLE INSTRUCTIONS TO THE TAHSILDAR NOT TO INSIST FOR NOTARISED AFFIDAVIT.

THE TAHSILDAR, KAMMARPALLI HAD REPORTED THAT NOTARY IS NOT BEING DEMANDED IN ROUTINE MANNER. IN CASE WHERE THE RESIDENCE CERTIFICATE IS REQUIRED FOR PASSPORT AND WHERE SUFFICIENT EVIDENCE COULD NOT BE SECURED IN LOCAL ENQUIRY NOTARY IS BEING DEMANDED. THERE IS NO TRUTH IN THE COMPLAINT.

19/01/2009

2715.

CH.SANJEEVULU

RAMPUR KALAN 

PITLAM (M)

IN MADNOOR VILLAGE WE HAVE A HOUSE STANDING IN THE NAME OF MOTHE RAMAVVA WHO IS MY GRAND MOTHER - AT PRESENT I AM RESIDING AT RAMPUR KALAN VILLAGE OF PITLAM MANDAL - TAKING ADVANTAGE OF THIS, THE E.O. HAD CHANGED THE OWNERSHIP IN THE NAME OF AKULA VEERANNA UNAUTHORISEDLY - I HAVE APPLIED FOR COPY OF MUTATION PROCEEDINGS AND REVISION RECORD WHICH THE E.O. IS REFUSING TO ISSUE - KINDLY ARRANGE FOR ISSUE OF THE ABOVE RECORD FOR TAKING LEGAL ACTION.

THE D.P.O. HAD REPORTED THAT H.NO. 1-36, 37 & 39 STANDS IN THE NAME OF MOTHE RAMAVVA. SRI AKULA VEERANNA FILED AN AGREEMENT IN MARATI CLAIMING SALE. ACCORDINGLY, THE HOUSE WAS TRANSFERRED IN THE NAME OF AKULA VEERANNA WITHOUT VERIFYING WHAT IS WRITTEN IN THE DOCUMENT. HOWEVER, ON RECEIPT OF COMPLAINT THE DOCUMENT WAS GOT VERIFIED WITH MARATI KNOWING PERSON AND AFTER KNOWING CONTENTS, THE OWNERSHIP IS RESTORED TO MOTHE RAMAVVA.

19/01/2009

2716.

BAIRAIAH 

REDDYPET (V)

MACHAREDDY (M)

I HAVE REGISTERED FOR PROVIDING EMPLOYMENT AS UDYOGA MITRA UNDER RAJIV UDYOGA SREE TWO MONTHS BACK - BUT SO FOR NO COMMUNICATION IS RECEIVED IN THIS REGARD - I REQUEST KINDLY TO ARRANGE EMPLOYMENT AS EARLY AS POSSIBLE FOR MY SURVIVAL.

THE C.E.O.(STEP) HAD REPORTED THAT SO FAR NO G.O. ISSUED REGARDING EMPLOYMENT UNDER RAJIV UDYOGA MITRA. AS SOON AS INSTRUCTIONS ARE RECEIVED FURTHER ACTION WOULD BE TAKEN.

19/01/2009

2717.

CHINNU MIYA

OOTPALLY (V)

BODHAN (M)

SRI ALEEMUDDIN IS WORKING AS TEACHER IN URDU MEDIUM SCHOOL AND NEVER ATTEND SCHOOL TO TEACH THE STUDENTS - HE ALWAYS INVOLVES IN POLITICS AND MOVES WITH POLITICAL LEADERS IGNORING HIS LEGITIMATE DUTIES, BUT RECEIVE SALARY PROMPTLY - KINDLY TAKE SUITABLE ACTION AGAINST HIM AND ARRANGE TEACHING TO THE POOR STUDENTS.

THE D.E.O. HAD REPORTED THAT THE M.E.O. HAD ENQUIRED INTO THE MATTER IN THE SCHOOL PREMISES IN THE PRESENCE OF OTHER TEACHERS AND STUDENTS AND FOUND THAT SRI ALEEMUDDIN IS A GOOD TEACHER AND REGULAR TO SCHOOL. DUE TO SOME PERSONAL DISPUTES BETWEEN THE CALLER AND ALEEMUDDIN A COMPLAINT IS REGISTERED IN THE D.Y..C. TO DEFAME SRI ALIMUDDIN. THERE IS NO TRUTH IN THE COMPLAINT.

19/01/2009

2718.

ARE RAVINDAR

MENDORA (V)

BHEEMGAL (M)

VANNELAVARI @ TURAKAVARI KUNTA IS SPREAD OVER SIX ACRES AND HAS A FIXED AYACUT - THE ADJOINING FARMERS HAVE STARTED ENCROACHING THE SHIKAM FOR THE PAST THREE YEARS AND REDUCED THE TANK BED TO THREE ACRES - THE REGISTERED AYACUTDARS ARE NOT GETTING WATER TO RAISE THE CROPS - I HAVE BEEN COMPLAINING BEFORE THE MRO/ TAHSILDAR FOR THE PAST THREE YEARS BUT NO ACTION IS TAKEN TO EVICT THE ENCROACHERS - I HAVE ALSO FILED PETITION IN PRAJAVANI VIDE RECEIPT NO. 12253 - KINDLY ENQUIRE AND DO JUSTICE.

THE TAHSILDAR, BHEEMGAL HAD REPORTED THAT FIVE PERSONS HAVE ENCROACHED 5.30 ACRES OF SHIKAM LAND BY REMOVING THE BOUNDARY STONES AND CULTIVATING ILLEGALLY. THE A.D.(S&LR) WAS REQUESTED TO DEPUTE INSPECTOR TO FIXUP THE BOUNDARIES TO ENABLE EVICTION OF ENCROACHERS. IN THE MEAN TIME NOTICES WERE ISSUED U/s 7 OF LAND ENCROACHMENT ACT 1905 ON 21.01.2009. FURTHER ACTION WOULD BE TAKEN AFTER EXPIRY OF PRESCRIBED PERIOD.

19/01/2009

2719.

B.SHANKAR

MALKAPUR A (V)

NIZAMABAD (M) 

I HAVE TAKEN UP CONSTRUCTION OF SIDE DRAIN WORKS FROM NYALKAL CHOWRASTA IN THE YEAR 1999-2000 - ON MY CONSTANT PERSUASION IN THE YEAR 2004 AN AMOUNT OF Rs.8.00 LAKHS WAS PAID LEAVING IN BALANCE Rs.1.90 LAKHS - I HAVE BEEN REQUESTING SE/EE (R&B), NIZAMABAD FOR ARRANGING BALANCE PAYMENT - I HAVE ALSO REPRESENTED IN D.Y.C. - THEY ARE STATING FUNDS ARE NOT AVAILABLE - I HAVE COMPLETED THE WORK 8 YEARS BACK AND SO FAR PAYMENT NOT COMPLETED RESULTING LOSS TO ME - KINDLY ARRANGE IMMEDIATE PAYMENT.

THE E.E.(R&B), NIZAMABAD HAD REPORTED THAT ADMINISTRATIVE SANCTION WAS ACCORDED FOR Rs.8,76,064/- TO TAKE UP SIDE WALL FOR OPEN DRAIN FROM K.M. 0/0 TO 0/500 ON VARNI ROAD, NIZAMABAD. THE WORK WAS COMPLETED AND M.B. RECORDED FOR Rs.8,67,778/-  ONLY. ACCORDINGLY, PROPOSAL WAS SUBMITTED TO THE COLLECTOR (H2-SECTION OF COLLECTORATE) AND SANCTION WAS ACCORDED FOR Rs.8.00 LAKHS ONLY AND ACCORDINGLY CHEQUE ISSUED. THE AMOUNT WAS PAID TO THE CONTRACTOR SRI B.SHANKAR.

 

THE CONTRACTOR IS PRESSING FOR PAYMENT OF BALANCE OF Rs.67,778/- AND WITH HELD F.S.D. @ 7.5% AMOUNTING TO Rs.70,085/- TOTALLING Rs.1,37,863/-. SINCE NO OTHER FUNDS ARE AVAILABLE WITH THE DEPARTMENT, I REQUEST THE COLLECTOR TO RELEASE BALANCE OF Rs.67,778/- TO SETTLE THE LONG PENDING GRIEVANCE.

19/01/2009

2720.

BASWANTH REDDY

GODEMEGOAN (V)

PITLAM (M)

PLEASE REFER MY D.Y.C. COMPLAINT NO. 2628, DATED 07.07.2008 - RESPONDING TO THE COMPLAINT THE TAHSILDAR, PITLAM HAD ISSUED NOTICE CALLING FOR OBJECTION BUT EVEN AFTER EXPIRY OF PRESCRIBED TIME NOT ISSUED P.P.B./ T.D. - SINCE ALREADY SIX MONTHS ARE OVER KINDLY INSTRUCT THE TAHSILDAR TO ISSUE P.P.B./T.D. ON PRIORITY BASIS.

THE TAHSILDAR, PITLAM HAD REPORTED THAT THE ENQUIRY HAS BEEN COMPLETED, STATEMENTS RECORDED AND P.P.Bs & T.Ds WERE ISSUED TO ALL THE FOUR LEGAL HEIRS. 

19/01/2009

2721.

BANDI RAMULU

OOTPALLI (V)

BODHAN (M)

IN AN ACCIDENTAL FIRE ACCIDENT ON 01.01.2009 OUR TWO RESIDENTIAL HUTS WERE TOTALLY DESTROYED IN SPITE OF FIRE ENGINE TRIED ITS BEST TO PUT OF THE FIRE - I HAVE APPROACH THE M.R.O./ V.R.O. WITH FIRE SERVICE REPORT FOR PROVIDING RELIEF - BUT SO FAR NO ACTION IS TAKEN TO VISIT THE SPOT AND CONDUCTING PUNCHANAMA - KINDLY ARRANGE FOR IMMEDIATELY RELIEF AND SANCTION OF PERMANENT HOUSE.

THE R.D.O. AND TAHSILDAR, BODHAN HAVE REPORTED THAT FIRE WAS NOTICED IN THE HUT OF BANDI RAMULU AND IMMEDIATELY THE NEIGHBOURS HAVE PUT OFF THE FIRE BY POURING WATER WITH POTS. NO DAMAGE WAS DONE EITHER TO HUT OR PROPERTY. SIMILARLY, NO FIRE WAS GUTTED TO THE HUT OF OTHER PERSON AND AS SUCH THEY ARE NOT ELIGIBLE FOR ANY RELIEF.

19/01/2009

2722.

RAJESH

ADLOOR YELLAREDDY (V), SADASHIVNAGAR (M)

IN WARD NO.11 OF ADLOOR YELLAREDDY VILLAGE A O.H.S.R. WAS CONSTRUCTED ONE YEAR BACK TO PROVIDE DRINKING WATER - DUE TO SOME DISPUTE BETWEEN THE SARPANCH AND CONTRACTOR MOTOR IS NOT FIXED AND CONNECTED TO THE O.H.S.R. - DUE TO THIS PUBLIC IN WARD NO.11 TO 17 ARE FACING ACUTE DRINKING WATER PROBLEM - KINDLY INSTRUCT THE CONCERNED TO COMPLETE THE INSTALLATION OF MOTOR AND INAUGURATE THE SCHEME TO SOLVE THE DRINKING WATER PROBLEM.

THE S.E. (RWS) & D.P.O. HAVE REPORTED THAT THE PUMP SET IS SECURED AND WOULD BE ERECTED IN TWO DAYS AND DRINKING WATER PROBLEM WOULD BE SOLVED.

19/01/2009

2723.

KALLAGUTLA VITTAL

SADASHIVNAGAR (V)

SADASHIVNAGAR (M)

I HAVE PATTA LAND AND CULTIVATING WITH PADDY AND VEGETABLES - MY ADJACENT PATTEDAR SRI P.BEERAIAH S/o VEERAIAH, KURMA HAS CONVERTED HIS AGRICULTURAL LAND INTO POULTRY FARM AND DRILLED A BORE WELL WITHIN 50 METERS FROM MY EXISTING BORE WELL CAUSING DEPLETION OF GROUND WATER - AT THE TIME OF DRILLING I HAVE FILED COMPLAINT BEFORE THE TAHSILDAR WHO ADVISED THE R.I. TO INSPECT AND TAKE NECESSARY ACTION - BUT THE R.I. FAILED TO TAKE ANY ACTION - ON 29.12.2008 I HAVE FILED APPLICATION BEFORE THE J.C. AND THE SAME WAS AGAIN HANDED OVER TO THE TAHSILDAR - ON THIS ALSO NO ACTION IS TAKEN - THE A.P. TRANSCO AUTHORITIES HAVE PROVIDED POWER SUPPLY ON 17.01.2009 - IF THIS BOREWELL IS COMMISSIONED MY AGRICULTURAL LANDS ARE LIKELY TO BE BECOME BARREN LANDS AND I WILL LOOSE MY SOURCE OF LIVING - KINDLY ENQUIRE AND DO JUSTICE IMMEDIATELY.

THE TAHSILDAR, SADASHIVNAGAR HAD REPORTED THAT THERE IS A OLD BORE WELL IN THE LAND OF K.VITTAL WHICH IS BEING USED FOR RAISING VEGETABLES ETC. SRI BEERAIAH HAD CONSTRUCTED A SHED WITH 300 Sq.Ft. FOR POULTRY FARM. SO FAR NO BIRDS ARE RAISED. APART FROM THIS, HE HAS NO OTHER LAND FOR USING THE BORE. IF THE WATER IS DRAWN FOR DRINKING PURPOSE OF CHICKEN IT WILL NOT AFFECT. THE AGRICULTURAL BORE WELL OF CALLER SRI VITTAL. HOWEVER, THE BORE IS DRILLED WITHIN 100 METERS OF THE EXISTING BORE WELL OF THE CALLER.

 

 

THE S.E.(NPDCL) HAD REPORTED THAT SRI BEERAIAH S/o VEERAIAH HAD APPLIED FOR POWER SUPPLY UNDER CATEGORY -II I.E. COMMERCIAL PURPOSE. AFTER RECEIPT OF NECESSARY CHARGES, CONNECTION WAS RELEASED AND THE SUPPLY IS BEING USED FOR POULTRY FARM. SINCE IT IS A COMMERCIAL CONNECTION FOR POULTRY FARM IT NEED NOT BE DISCONNECTED.

02/02/2009

2724.

NALUKA RAMULU

SHIVAIPALLY (V)

BHIKNOOR (M)

OUR VILLAGE IS SELECTED UNDER INDIRAMMA PROGRAMME AND HOUSES WERE SANCTIONED -AROUND 24 BENEFICIARIES CONSTRUCTED THE HOUSES UPTO LINTEL LEVEL - DURING THE MONTH OF NOVEMBERS 2008 PHOTOGRAPHS WERE TAKEN AND SUBMITTED IN D.M. HOUSING OFFICE AND CONCERNED OFFICIALS HAVE VISITED THE SITE AND INSPECTED THE HOUSES IN THE MONTH OF DECEMBER 2008 - SO FAR EVEN BILL UPTO BASEMENT LEVEL IS NOT PAID - IN VIEW OF ENSUING SUMMER FEARING SHORTAGE OF WATER FOR CURING, LOANS WERE OBTAINED FROM PRIVATE PERSONS AND SLAB ALSO LAID - LOCAL HOUSING OFFICIALS ARE STATING THAT THEY WOULD RELEASE INSTALMENTS AS AND WHEN THEY WISH - THEY ARE GIVING RASH REPLIES - KINDLY ENQUIRE INTO THE MATTER AND ARRANGE FOR RELEASE OF DUE INSTALMENTS ON PRIORITY BASIS TO COMPLETE THE WORK IN ALL ASPECTS AND ALSO TO SAVE US FROM THE BURDEN OF PAYING INTEREST TO PRIVATE LENDERS.

THE G.M.(HOUSING) HAD REPORTED THAT IN SHIVAIPALLI VILLAGE 168 HOUSES WERE SANCTIONED UNDER INDIRAMMA PHASE-III PROGRAMME. OUT OF WHICH 25 HOUSES ARE IN DIFFERENT STAGES. TEN BAGS OF CEMENT WAS SANCTIONED AND BILLS PAYMENT IS BEING DONE THROUGH GRAMA SAMAIKYA. FOR SHIVAIPALLI VILLAGE GRAMA SMAIKYA WAS AUTHORISED FOR PAYMENT OF BILLS FROM 05.02.2009 ONLY. ACTION IS IN PROGRESS TO ARRANGE PAYMENTS AND THE SAME WOULD BE COMPLETED WITHIN A WEEK.

02/02/2009

2725.

ANJI REDDY

MUTHYAMPET (V)

DOMAKONDA (M)

DURING THE TENURE OF SRI D.V.RAIDU, I.A.S.., COLLECTOR I HAVE FIELD COMPLAINT ON THE IRREGULARITIES IN TAKING UP ISLS. AND FARM PONDS AND LAYING OF PIPE LINE - SINCE THE ALLEGATIONS WERE GENUINE, THE ACCUSED HAVE INDISCRIMINATELY BEATEN ME AND ALL MY FAMILY MEMBERS - I HAVE MET THE COLLECTOR AND S.P. PERSONALLY AND FILED APPLICATIONS SEEKING JUSTICE - BUT SO FAR NO ACTION IS TAKEN - I HAVE FILED APPLICATION WITH THE MPDO AND RWS AUTHORITIES UNDER RTI ACT FOR FURNISHING DETAILS OF DEVELOPMENTAL WORKS TAKEN UP IN THE VILLAGE DURING THE YEAR 2005, IN THE MONTH OF APRIL 2007 - BUT, SO FAR THE DETAILS ARE NOT GIVEN - KINDLY ARRANGE FOR IMMEDIATE ACTION AGAINST THE ACCUSED AND TO FURNISH THE INFORMATION REQUESTED UNDER RTI ACT. ( DYC NO. 2549, DATED 07.01.2008, THE CEO ZP WHO ENQUIRED INTO THE MATTER HAD REPORTED THAT IT IS A FALSE COMPLAINT).

 

DUE TO INDISCRIMINATE MAN HANDLING MY WIFE IS ADMITTED IN AREA HOSPITAL, KAMAREDDY AND DOCTORS HAVE ADVISED FOR MAJOR OPERATION - I HAVE NO MONEY TO MEET THE MEDICAL EXPENSES WHICH WOULD BE AROUND RS.15000 TO 20000/-. KINDLY ARRANGE RELEASE OF AMOUNT AND SAVE LIFE OF MY WIFE.

THE TAHSILDAR, DOMAKONDA HAD REPORTED THAT THE TAHSILDAR HAD VISITED THE VILLAGE AND ENQUIRE INTO THE REQUEST MADE BY THE CALLER. THOUGH THE CALLER IS HAVING WHITE RATION CARD AND AAROGYASREE CARD HE DID NOT APPROACH ANY SUPER SPECIALITY OR GOVT. HOSPITAL FOR TREATMENT OF HIS WIFE WHO UNDER WENT HYSTERECTOMY OPERATION. THIS IS NOT CONCERNED WITH ANY BEATING AS ALLEGED IN THE COMPLAINT. HE IS HAVING 2.34 ¼ ACRES OF LAND AT CHINTAMANPALLI VILLAGE, ONE PAKKA HOUSE AND ONE HOUSE PLOT. THE FAMILY IS NOT ELIGIBLE TO GET ANY ASSISTANCE UNDER C.M.R.F./ P.M.R.F. THE SAME MAY BE INFORMED TO THE CALLER.

02/02/2009

2726.

MUSTAF

BANSWADA (V)

BANSWADA (M)

IN BANSWADA LARGE NUMBER OF PIGS AND OTHER ANIMALS ARE ROAMING FREELY AND DAMAGING THE KACHA DRAINS & ROADS AND ALSO MAKING THE PLACE DIRTY - I HAVE FILED COMPLAINT THE G.P. BUT SO FAR NO ACTION IS TAKEN - ( DYC NO. 2707, DATED 01.12.2008 - DPO REPLY - THE MENACE PIGS IN BANSWADA TOWN IS ON THE HIGHER SIDE AND NOTICES WERE ISSUED TO ALL THE OWNERS TO SHIFT THEM 2 K.MS. AWAY FROM GP LIMITS. AROUND 300 PIGS WERE ELIMINATED. THE OWNERS HAVE REQUESTED FOR FORTNIGHT TIME TO SHIFT THEM INTO FOREST AREA. THE COMMITTEE ACCORDINGLY GRANTED 15 DAYS TIME AND ON EXPIRY OF TIME GRANTED PIGS NOT SHIFTED WOULD BE ELIMINATED.)

THE D.P.O. HAD REPORTED THAT ON THE EARLIER COMPLAINT BY THE CALLER, NOTICES WERE ISSUED TO PIG OWNERS TO SHIFT THE PIGS 2 KMs AWAY FROM THE G.P. LIMITS OF BANSWADA. WHEN THERE WAS NO RESPONSE 300 PIGS WERE ELIMINATED IN THE MONTH OF DECEMBER 2008. THE OWNERS HAVE REPRESENTED TO GIVE ONE MONTH TIME TO SHIFT THE PIGS. THE CALLER HAD AGAIN COMPLAINT IN THE D.Y.C. AGAIN 200 PIGS WERE ELIMINATED IN THE MONTH OF FEBRUARY SO FAR AND FINAL NOTICE WAS ISSUED TO THE OWNERS. AS SOON AS THE TIME GIVEN IS EXPIRED FURTHER ACTION WOULD BE TAKEN TO ELIMINATE ALL THE PIGS, IF THEY ARE NOT SHIFTED.

02/02/2009

2727.

RAMULU

MADNOOR (V)

MADNOOR (M)

IN MADNOOR BELT COTTON IS MAJOR CROP IN KHARIF SEASON. AROUND 25 TO 30 GINNING MILLS ARE FUNCTIONING IN MADNOOR PROPER. THEY ARE INDULGING IN FOLLOWING IRREGULARITIES AND CAUSING LOSS TO THE FARMERS.

1. THEY ARE COLLECTING NEARLY 2 KGS OF COTTON AS SAMPLE AND NOT INCLUDING THE WEIGHT IN THE COTTON SOLD.

2. THEY ARE SUPPOSED TO COLLECT RS.1.56 PAISE TOWARDS TAX BY PASSING A PRINTED RECEIPT, WHERE AS COLLECTING RS. 3 TO 4 BY PASSING A RECEIPT ON A PLAIN PAPER.

3. RECENTLY A PURCHASE CENTRE IS OPENED BY THE GOVERNMENT TO PURCHASE THE COTTON FROM FARMERS AT MSP. BUT THIS CENTRE IS NOT PURCHASING COTTON DIRECTLY FROM THE FARMERS BUT FROM THE TRADERS. THE TRADERS ARE PURCHASING AT LESSER PRICE FROM FARMERS AND SELLING TO GOVERNMENT CENTRE AT MSP AND DEPRIVING FARMERS MSP.

4. THE GINNING MILLS FUNCTION DURING ALL 24 HOURS AND WOMEN ARE WORKING IN NIGHT SHIFT WHERE MINIMUM FACILITIES LIKE TOILETS ETC. ARE NOT AVAILABLE.

5. SIMILARLY IN ALL THE GINNING MILLS CHILD LABOUR IS ENGAGED AND WORK EXTRACTED AGAINST RULES.

KINDLY SURPRISE THE ABOVE MILLS AND TAKE UP APPROPRIATE ACTION AGAINST EARRING MILLS MANAGEMENT.

THE J.D.A./ AD (MARKETING) HAVE REPORTED THAT THEY HAVE VISITED MADNOOR COTTON MARKET ON 02.02.2009 AROUND 03.00 P.M. AND FOUND THAT ALL THE GINNING MILLS ARE CLOSED SINCE MONDAY IS A WEEKLY HOLIDAY. HOWEVER, THEY HAVE CONTACTED SRI SHASHIKANTH OWNER OF RAGHAVENDRA INDUSTRIES IS ALSO VICE-PRESIDENT OF THE TRADERS ASSOCIATION. THEY HAVE ALSO INTERACTED WITH SOME OF THE FARMERS AND THE COMPLAINT IS ANSWERED AS UNDER.

 

1. THEY ARE COLLECTING NEARLY 2 KGS OF COTTON AS SAMPLE AND NOT INCLUDING THE WEIGHT IN THE COTTON SOLD.

ANS=> THE FARMERS HAVE STATED THAT 1 TO 2 KGs OF COTTON IS BEING DRAWN AS SAMPLE AND THE TRADERS ARE NOT INCLUDING THIS COTTON IN THE ACTUAL WEIGHT. THE TRADERS ARE DOING THIS TO RECOUP THE LOSS ON ACCOUNT OF TRANSPORTATION. THIS IS A LOST TO THE FARMERS.

2. THEY ARE SUPPOSED TO COLLECT RS.1.56 PAISE TOWARDS TAX BY PASSING A PRINTED RECEIPT, WHERE AS COLLECTING RS. 3 TO 4 BY PASSING A RECEIPT ON A PLAIN PAPER.

ANSč THE COMMISSION AGENTS ARE DEDUCTING 2% OF THE TOTAL VALUE AND PAYING THE BALANCE TO THE FARMERS. THE FARMERS HAVE STATING THAT THE DEDUCTION IS HIGHER SIDE AND CAUSING LOSS TO THE FARMERS.

3. RECENTLY A PURCHASE CENTRE IS OPENED BY THE GOVERNMENT TO PURCHASE THE COTTON FROM FARMERS AT MSP. BUT THIS CENTRE IS NOT PURCHASING COTTON DIRECTLY FROM THE FARMERS BUT FROM THE TRADERS. THE TRADERS ARE PURCHASING AT LESSER PRICE FROM FARMERS AND SELLING TO GOVERNMENT CENTRE AT MSP AND DEPRIVING FARMERS MSP.

ANSč THE NAFED OFFICIALS ARE PURCHASING COTTON FROM THE FARMERS WERE PRODUCING P.P.B. NO PURCHASERS ARE BEING MADE EITHER THROUGH THE TRADER OR BROKER. THEY WERE ADVISED TO PAY M.S.P. OF Rs.3000/- AS PER NORMS.

4. THE GINNING MILLS FUNCTION DURING ALL 24 HOURS AND WOMEN ARE WORKING IN NIGHT SHIFT WHERE MINIMUM FACILITIES LIKE TOILETS ETC. ARE NOT AVAILABLE.

ANSč THE WOMEN LABOUR AND MAN LABOUR ARE BEING ALLOTTED DIFFERENT TYPES OF WORKS AND WAGES ARE BEING PAID AS PER THE WORK DONE. GENERALLY WOMEN LABOUR ARE NOT ENGAGED DURING NIGHT SHIFTS.

5. SIMILARLY IN ALL THE GINNING MILLS CHILD LABOUR IS ENGAGED AND WORK EXTRACTED AGAINST RULES.

ANSč NO CHILD LABOUR IS FOUND IN THE FACTORIES AS FACTORIES ARE CLOSED. HOWEVER, THE FARMERS HAVE STATED THAT CHILD LABOUR IS BEING ENGAGED DURING NIGHT SHIFTS.

FURTHER WEIGHMENT IS BEING DONE THROUGH ELECTRONIC WEIGH BRIDGES. THERE IS NO WEIGHING BRIDGE AT A.M.C. MADNOOR. FOR A TEST TWO LORRY LOADS OF COTTON WAS WEIGHT AT GURURAJ WEIGH BRIDGE C/O M/s ALANKAR GINNING FACTORY, MADNOOR AND THE SAME WAS WEIGHED AT TIRUMALA WEIGH BRIDGE C/o T.G.&F PVT. LTD., MADNOOR. THERE IS VARIATION OF 10 TO 20 KGs. THE DEFECT AS TO BE RECTIFIED BY THE WEIGHTS AND MEASURES DEPARTMENT.

 

IT IS ALSO NOTICED THAT ON THE WHOLE TRANSACTIONS NO PURCHASER HAD PAID M.S.P. OF THE Rs.3000/- PER QUINTAL. THE PAYMENTS ARE ROUTED THROUGH THE COMMISSION AGENTS / BROKERS. NO DIRECT PAYMENTS ARE MADE TO THE FARMERS.

02/02/2009

2728.

VENKATESH

OOTPALLY (V)

BODHAN (M)

IN OOTPALLY VILLAGE OF BODHAN MANDAL SEVERAL BENEFICIARIES BELONGING TO SC/ ST/ BC AND MINORITIES ARE IN OCCUPATION OF NSF LANDS FOR THE PAST 20 YEARS AND CULTIVATING THE SAME. WE REQUEST THE GOVERNMENT KINDLY TO ALLOT EACH BENEFICIARY 1.00 ACRE BY PURCHASING THE LAND FROM NSF UNDER LAND PURCHASING SCHEME AND HELP THE POOR BENEFICIARIES. 

THE TAHSILDAR, BODHAN HAD REPORTED THAT NO N.S.F. LAND IS AVAILABLE FOR ALLOTMENT UNDER LAND PURCHASE SCHEME. IN MITTAPUR VILLAGE WHICH IS ADJACENT TO OOTPALLY 66.00 ACRES OF LAND IS AVAILABLE OUT OF WHICH 40.00 ACRES WAS ALREADY ALLOTTED TO S.C. BENEFICIARIES OF ERRAJPALLY AND REMAINING 26.00 ACRES IS PROPOSED FOR ALLOTMENT TO THE S.T. BENEFICIARIES WHICH IS PENDING BEFORE THE CORE COMMITTEE OF N.S.F. AS SUCH, AT PRESENT THERE IS NO N.S.F. LAND FOR ALLOTMENT FOR LANDLESS BENEFICIARIES OF OOTPALLI VILLAGERS.

02/02/2009

2729.

YADARAM (V)

DOMAKONDA (M)

IN MY IRRIGATION WELL SILT IS FARMED AND WATER STORAGE IS DRASTICALLY REDUCED. I REQUEST KINDLY TO PERMIT ME TO TAKE UP THIS WORK UNDER EGS, WHICH HELPS IN PROVIDING TO THE LOCALS AND DEEPENING OF MY IRRIGATION WELL.

THE P.D.(DWMA) HAD REPORTED THAT THE M.P.D.O., DOMAKONDA WAS INSTRUCTED TO ENQUIRE AND REPORT ON THE FEASIBILITY. AS SOON AS THE REPORT IS RECEIVED FURTHER ACTION WOULD BE TAKEN.

02/02/2009

2730.

UMAMHESWAR RAO

DHARMARAM (V)

DICHPALLI (M)

DURING THE TENURE OF SRI D.V.RAIDU, IAS, COLLECTOR, NIZAMABAD AND IN THE SUBSEQUENT YEARS NIZAMABAD DISTRICT GOT 1ST PLACE IN IMPLEMENTATION OF TELUGU AS OFFICIAL LANGUAGE. BUT SLOWLY THIS IS LOOSING GRIP AS SEVERAL COMMERCIAL ESTABLISHMENTS ARE NOT EXHIBITING THEIR NAMES IN TELUGU INSTEAD USING ONLY ENGLISH. FOR EXAMPLE AT BORGAON P VILLAGE OF NIZAMABAD MANDAL PRAKASH HYNDAI MOTORS AND VARUN MOTORS HAVE EXHIBITED SIGNBOARDS ONLY IN ENGLISH. KINDLY TAKE NECESSARY ACTION TO ENSURE THAT THE SIGNBOARDS ARE ALSO WRITTEN IN TELUGU FOR ENSURING USAGE OF TELUGU AND CONVENIENCE OF COMMON MAN.

THE D.R.O. HAD REPORTED THAT INSTRUCTIONS WERE ISSUED TO THE COMMI-SSIONER OF LABOUR TO ENSURE THAT SIGN BOARDS ARE ALSO WRITTEN IN TELUGU BY ALL COMMERCIAL ESTA-BLISHMENTS AND REPORT COMPLIANCE.

16/02/2009

2731.

KOMANPALLI RAJANNA, VELMAL (V),

NANDIPET (M)

IN OUR VILLAGE WORKS UNDER E.G.S. WERE TAKEN UP - THE SARPANCH IN COLLUSION WITH FIELD ASSISTANT HAVE BOOSTED THE NUMBER OF WORKING DAYS OF LABOUR AND SWALLOWED THE AMOUNT DRAWN FOR EXCESS NUMBER OF DAYS RECORDED - FOR EXAMPLE IF THE RECORDS SHOW THAT Rs.20,000/- IS PAID TO A LABOUR, THE ACTUAL AMOUNT PAID IS AROUND Rs.6,000/- TO 7,000/- ONLY - THUS, NEARLY Rs.13.00 LAKHS HAVE BEEN SWALLOWED BY SARPANCH AND FIELD ASSISTANT BY RECORDING BOOSTED WORKING DAYS - WE HAVE OBTAINED THE DETAILS OF PAYMENTS UNDER R.T.I. ACT AND SUPPLIED THE COPIES TO THE LABOUR TO KNOW THE ACTUAL AMOUNT THEY HAVE RECEIVED - MOST OF THE LABOUR ARE STATING THAT THE AMOUNT SAID TO HAVE BEEN PAID IS TWICE HIGHER THAN THE ACTUAL AMOUNT RECEIVED BY THEM - THIS CLEARLY SHOWS THAT THE SARPANCH AND FIELD ASSISTANT HAVE INDULGED IN ILLEGAL ACTIVITY AND THUS CAUSED LOSS TO THE GOVERNMENT - KINDLY CAUSE DISCREET ENQUIRY AND DO JUSTICE IN THE MATTER.

THE P.D. (DWMA) HAD REPORTED THAT THE MATTER WAS GOT ENQUIRED AND THE ENQUIRY REVEALED THAT Rs.13.00 LAKHS WERE NOT MISAPPROPRIATED BY THE SARPANCH IN COLLUSION WITH FIELD ASSISTANT AS ALLEGED IN THE COMPLAINT BY THE CALLER. THEREFORE, THE ALLEGATIONS ARE BASELESS AND NO FURTHER ACTION IS REQUIRED.

16/02/2009

2732.

BAPU REDDY

YADARAM (V)

DOMAKONDA (M) 

EARLIER D.Y.C. NO. 2729, DATED 02.02.09 - IN MY PRIVATE IRRIGATION WELL SILT IS FARMED AND WATER STORAGE IS DRASTICALLY REDUCED. I REQUEST KINDLY TO PERMIT ME TO TAKE UP THIS WORK UNDER EGS, WHICH HELPS IN PROVIDING TO THE LOCALS AND DEEPENING OF MY IRRIGATION WELL.

 

THE P.D.(DWMA) HAD ADDRESSED A LETTER TO THE M.P.D.O. TO EXAMINE FEASIBILITY AND SUBMIT REPORT - REPORT IS AWAITED.

 

2) EARLIER I HAVE WORKED FOR TAKING UP DRINKING WATER WORKS IN THE VILLAGE AND A QUANTITY OF 9 QUINTALS OF RICE IS STILL DUE - I HAVE BEEN REPRESENTING BEFORE THE AE/EE/SE(RWS) BUT SO FAR RICE IS NOT RELEASED - I AM PUT TO LOT OF INCONVENIENCE AND LOSS - KINDLY ARRANGE FOR IMMEDIATE RELEASE OF 9 QUINTALS OF RICE.

THE P.D.(DWMA) HAD REPORTED THAT THE REQUEST OF SRI BAPU REDDY, EX-SARPANCH CAN NOT BE CONSIDERED IMMEDIATELY AS SOFTWARE FROM THE COMMISSIONER, RURAL DEVELOPMENT, HYDERABAD FOR TAKING UP SUCH WORKS IS STILL AWAITED. AS SOON AS THE PATCH IS INSTALLED AND IF THE WORK IS ELIGIBLE SUITABLE PROPOSAL WOULD BE OBTAINED FROM THE M.P.D.O. AND FURTHER ACTION TAKEN.

 

THE E.E.(RWS), NIZAMABAD HAD REPORTED THAT RICE IS NOT AVAILABLE AND A PROPOSAL WAS ALREADY SUBMITTED TO THE GOVERNMENT FOR PROVIDING CASH IN LIEU OF RICE AND THE SAME IS STILL PENDING AT GOVT. LEVEL. THE SAME WAS INFORMED TO THE CALLER ON HIS EARLIER REPRESENTATION IN D.Y.C.

16/02/2009

2733.

MUTHYAM

NANDIPET (V&M)

THE DRINKING WATER BORE WELL IN WARD NO.12 HAD FAILED SOME TEN DAYS BACK - THE MEMBERS HAVE REPRESENTED THE MATTER TO THE WARD MEMBER AND ALSO TO THE SARPANCH  - BUT SO FAR NO ACTION IS TAKEN TO REPAIR THE SYSTEM - A PIPE LINE WAS CONNECTED FROM THE O.H.S.R. WHICH IS AT A DISTANT PLACE - BUT SO FAR NOT EVEN SINGLE DROP OF WATER RECEIVED FROM THIS NEW CONNECTION - KINDLY INSTRUCT THE D.P.O. FOR RESTORING THE FAILED BORE WELL WATER SUPPLY AND ALSO S.E. (RWS) TO ENSURE REGULAR WATER SUPPLY THROUGH THE PIPE LINE CONNECTED TO O.H.S.R. AND SOLVE THE DRINKING WATER PROBLEM IN WARD 12 KEEPING IN VIEW ENSUING SUMMER.

THE D.P.O. AND E.E.(RWS), NIZAABAD HAVE REPORTED THAT THE HAND PUMP FIXED TO THE BORE IN WARD NO.12 HAD BEEN REPAIRED AND WATER SUPPLY RESTORED IN THE WARD. THE PROBLEM IS REDRESSED.

16/02/2009

2734.

SANTOSH KUMAR

OOTPALLI (V)

BODHAN (M)

WE HAVE APPLIED FOR SANCTION OF LOAN UNDER RAJIV YUVA SHAKTHI - WE ALSO MET THE DISTRICT COLLECTOR WITH THE APPLICATION FORWARDED BY C.M. OFFICE - THE DISTRICT COLLECTOR HAD ADVISED US TO APPLY FOR SANCTION OF  8 UNITS OF MILCH ANIMALS UNDER PASUKRANTHI PATHAKAM WITH THE J.D.(AH) - ACCORDINGLY WE HAVE APPLIED WITH THE J.D. AND AFTER COMPLETION OF DOCUMENT OUR PROPOSAL WAS SENT TO THE S.B.H. BODHAN FOR CONSENT - SINCE ONE YEAR THE MANAGER IS NOT GIVING CONSENT TO SANCTION THE LOAN AND THE CASE IS PENDING - KINDLY TAKE UP THE ISSUE WITH THE MANAGER,S.B.H., BODHAN AND ARRANGE FOR CONSENT TO GROUND THE SCHEME AND HELP UNEMPLOYED YOUTH TO SECURE SELF EMPLOYMENT.

THE J.D.(AH) HAD REPORTED THAT SINCE THE BANK MANAGER S.B.H., BODHAN HAD NOT RESPONDED FOR GIVING CONSENT FOR GROUNDING EIGHT SHEEP UNITS, THE L.D.M. WAS ADDRESSED IN THE MATTER TO TAKE UP ISSUE WITH THE BANK MANAGER TO ARRANGE ISSUE OF CONSENT FOR RELEASING 50% SUBSIDY. THE VETERINARY ASST. SURGEON, BODHAN WAS ALSO INSTRUCTED TO PURSUE THE MATTER AND ENSURE GROUNDING OF SCHEME.

16/02/2009

2735.

POSHETTY

OOTPALLI (V)

BODHAN (M)

N.S.F. LAND IN SY.NO. 1040 OF OOTPALLI WAS ALLOTTED TO MY MOTHER SMT. AKKAMMA W/O YELLAIAH, CASTE ODDERA, BC, BY B.C. CORPORATION, NIZAMABAD - DUE TO IGNORANCE, MY MOTHER FAILED TO PAY THE REQUIRED AMOUNT THROUGH D.D. AND GOT THE LAND REGISTER oN HER NAME - NOW WE WANT TO PAY THE AMOUNT AND GET THE LAND REGISTERED IN THE NAME OF ALLOTTEE - KINDLY, HELP US IN GETTING THE REGISTRATION.

THE E.D. (BC CORP.) HAD REPORTED THAT THE KEY REGISTER WAS VERIFIED AND FOUND THAT THE NAME OF SMT. AKKAMMA W/o YELLAIAH IS NOT REGISTERED IN THE B.C. CORPORATION. THE CALLER WAS ADVISED TO APPROACH WITH DOCUMENTARY EVIDENCE IF SMT. AKKAMMA IS IN POSSESSION OF LAND IN SY.NO. 1040 AND ARRANGE PAYMENT OF Rs.50,000/- PER ACRE AS FIXED BY THE DIST. COLLECTOR FOR TAKING FURTHER ACTION IN THE MATTER. THE SAME WAS INFORMED TO THE CALLER.

16/02/2009

2736.

K.MALLAREDDY

NADIKUDA (V)

NANDIPET (M)

IN OUR VILLAGE THE SARPANCH BELONGS TO CONGRESS RULING PARTY AND INDULGING IN LARGE SCALE MISAPPROPRIATION OF GOVT. FUNDS BY MAKING FALSE CLAIMS SUCH AS HE HAD CREATED 50 BOGUS JOB CARDS ( LIKE SMT. SALLA RAJAVVA W/o NARSA REDDY, EX-,MPTC, GATTU NARSAVVA D/o BHOOMANNA, SAMA SAYAVVA W/o MALLAREDDY, NAGMAPET SHYAMALLA W/o GANGAREDDY, BEGAMA GANGAVVA W/o SATYAM REDDY ETC.) WITH THE COLLUSION OF FIELD ASSISTANT AND DRAWN LABOUR AMOUNT ON THIS CARDS AND MISAPPROPRIATED THE ENTIRE AMOUNT - SIMILARLY, NEARLY 20 TO 25 OLD HOUSES WERE WHITE WASHED AND TRY COLOUR COATED AND AMOUNT DRAWN UNDER INDIRAMMA HOUSING PROGRAMMER WITH OUT ACTUALLY TAKING UP ANY SUCH PROGRAMME - CHAKALI MALLAIAH, PERMILLA GANGARAM, PERMILLA GODAVARI W/o GANGARAM, NAGAMPET GANGA REDDY S/o BHOOMANNA ETC. - KINDLY CAUSE THROUGH ENQUIRY AND TAKE APPROPRIATE ACTION AGAINST SARPANCH APART FROM RECOVERY OF AMOUNT.

THE P.D. (DWMA) HAD REPORTED THAT THE CALLER WAS NOT PRESENT IN THE VILLAGE AT THE TIME OF ENQUIRY AND WAS CONTACTED ON THE CELL PHONE THROUGH WHICH HE HAD FIELD COMPLAINT. BUT, THERE IS NO RESPONSE FROM THE CALLER. HOWEVER, HE WOULD BE TRACED OUT AND DETAILED ENQUIRY CONDUCTED AND FURTHER REPORT SUBMITTED AFTER COMPLETION OF ENQUIRY.

 

THE G.M. (HOUSING) HAD REPORTED THAT THE D.E. HOUSING ARMOOR WAS DIRECTED TO CONDUCT DETAIL ENQUIRY AND SUBMIT REPORT WITHIN THREE DAYS. HIS REPORT IS STILL AWAITED. FURTHER REPORT WOULD BE SUBMITTED ON RECEIPT OF ENQUIRY REPORT FROM D.E. (HOUSING), ARMOOR.

16/02/2009

2737.

RAYALAVARI KUNTI POCHAIAH,

LINGAREDDYPET (V)

YELLAREDDY (M)

I AM A PHYSICALLY CHALLENGED PERSON AND CAN NOT WALK - I AM GETTING DISABLED PENSION OF Rs.200 ONLY WHEREAS, OTHERS ARE GETTING Rs.500/- PER MONTH - I HAVE REPRESENTED BEFORE THE SARPANCH, M.P.D.O. BUT MY PENSION IS NOT ENHANCED - AS I CAN NOT WALK AND COME TO NIZAMABAD KINDLY CONSIDER MY REQUEST AND ENHANCE MY PENSION TO Rs.500/- PER MONTH.

THE P.D.(DRDA) HAD REPORTED THAT PHYSICALLY CHALLENGED PERSONS WITH A MINIMUM OF 40% DISABILITY ARE ELIGIBLE FOR PENSION OF Rs.500/- PER MONTH FROM DECEMBER 2008. ANY OLD AGE PENSIONER WHO IS RECEIVING PENSION OF Rs.200/- PER MONTH AND ALSO A DISABLED PERSON AND APPLIED FOR ENHANCEMENT OF PENSION DISABILITY CERTIFICATES WERE OBTAINED FROM THE DOCTORS AND PROPOSALS SUBMITTED TO THE GOVERNMENT FOR SANCTION OF DIFFERENCE OF PENSION. AS SOON AS FUNDS ARE RECEIVED FROM THE GOVT. DIFFERENCE PENSION WOULD BE RELEASED.

02/03/2009

2738.

ANDEM BARGAIAH

PENTA KURD (V)

BODHAN (M) 

I AM  A POOR PERSON WITHOUT HOUSE PLOT AND HOUSE - GOVT. HAVE ACQUIRED PATTA LANDS FOR PROVIDING HOUSE SITES TO THE POOR - AFTER GIVING TO ELIGIBLE PERSONS 74 PLOTS ARE LEFT UN ALLOTTED - I HAVE APPLIED FOR ALLOTMENT OF ONE PLOT AS WE THREE BROTHERS WITH FATHER ARE HAVING ONLY ONE HOUSE - BUT, THE TAHSILDAR, BODHAN IS REFUSING TO ALLOT PLOT ON MY NAME FOR TAKING UP HOUSE UNDER INDIRAMMA HOUSING PROGRAMME - KINDLY DO JUSTICE.

THE TAHSILDAR, BODHAN HAD REPORTED THAT SRI RAMULU FATHER OF THE CALLER HAS THREE SONS HAD PATTA CERTIFICATE WAS ISSUED IN THE YEAR 1998. AT THAT TIME THE SONS WERE MINORS. NOW THEY ARE ASKING FOR INDIVIDUAL PLOT. AT PRESENT NO UN-ASSIGNED PLOT IS AVAILABLE. THE REQUEST OF CALLER WOULD BE CONSIDERED DURING THE 3RD PHASE OF INDIRAMMA HOUSING PROGRAMME.

02/03/2009

2739.

AHMED KHAN

NANDIPET (V)

NANDIPET (M)

I HAVE APPLIED FOR SANCTION OF LOAN FOR DOING BUSINESS UNDER SELF EMPLOYMENT DULY OBTAINING BANK CONSENT WITH THE A.P.S.M.F.C. - BUT, SO FAR SANCTION IS NOT RECEIVED - SINCE FINANCIAL YEAR IS COMING TO A CLOSE, KINDLY ARRANGE IMMEDIATE SANCTION OF LOAN.

THE E.D., APSMFC HAD REPORTED THAT THE APPLICATION OF THE CALLER WAS FORWARDED TO THE BANK FOR CONSIDERATION AND THE SAME WAS INFORMED TO THE CALLER AT THE GIVEN ADDRESS THROUGH A POST CARD.

02/03/2009

2740.

GANESH 

BHEEMGAL (V)

BHEEMGAL (M)

IN BHEEMGAL PROPER F.P. SHOP DEALERS ARE SUPPLYING KEROSENE @ 2 LITRES PER CARD AS AGAINST 3 LITRES - SIMILARLY THEY ARE COLLECTING Rs.14/- PER LITRE AS AGAINST THE GOVT. PRICE OF Rs.13.50 PER LITRE - THE DEALERS ARE NOT MAINTAINING TIMINGS AND OPENING THE SHOP THROUGH OUT THE MONTH - THEY ARE INDULGING MANY TYPES OF IRREGULARITIES AND FRAUD - KINDLY SURPRISE THE FAIR PRICE SHOPS AND DO JUSTICE TO THE CONSUMERS.

THE D.S.O. HAD REPORTED THAT THE ACTUAL REQUIREMENT OF KEROSENE TO BHEEMGAL MANDAL IS 43,050 LITRES. WHEREAS, THE SUPPLY IS ONLY 31,629 LITRES. THERE IS A SHORT SUPPLY OF 11,421 LITRES. THE TAHSILDAR HAS THEREFORE ALLOTTED 2 LITRES TO CARD HOLDERS WITH L.P.G. CONNECTION AND 3 LITRES TO OTHERS. THERE IS NO WILFUL SHORT SUPPLY BY THE F.P.S. DEALER. FURTHER, THE DEALERS ARE SUPPLYING KEROSENE @ Rs.13.50 PER LITRE AND NOT COLLECTING ANY EXCESS AMOUNT.

02/03/2009

2741.

VENKATESH

OOTPALLY (V) 

BODHAN (M)

HOUSE UNDER INDIRAMMA HOUSING PROGRAMME WAS SANCTIONED IN THE NAME OF MY WIFE SMT. PADMAVATHI - YESTERDAY I HAVE LAID THE SLAB ALSO - BUT SO FAR 30 BAGS OF CEMENT AND Rs. 3000/- FOR THE BASEMENT WORK DONE IS NOT RELEASED - THE LOCAL WORK INSPECTOR IS STATING THAT THE SANCTION IS AWAITED FROM G.M. (HOUSING), NIZAMABAD WHERE AS, THE STAFF AT NIZAMABAD ARE STATING THAT THE SANCTION WAS ALREADY SENT TO BODHAN - VERIFICATION REVEALED THAT THE WORK INSPECTOR HAD DRAWN THE CEMENT AND CASH IN THE NAME OF BENEFICIARY AND MISAPPROPRIATED THE SAME - KINDLY ENQUIRE AND DO JUSTICE.

THE G.M. HOUSING HAD REPORTED THAT HAD ENQUIRED INTO THE MATTER AND FOUND THAT SMT. PADMAVATHI WITH I.D.NO.2741 WAS SANCTIONED Rs.3000/- AND ISSUED 10 BAGS OF CEMENT THROUGH VILLAGE ORGANISATION AS PER ELIGIBILITY UPTO BASEMENT LEVEL.

02/03/2009

2742.

GAINI SAILOO

PENTAKURD (V)

BODHAN (M)

ONE SRI MAKSUD ALI DESAI, MANDAL COOPTED MEMBER WAS ALLOTTED HOUSE PLOT AND SANCTIONED HOUSE UNDER INDIRAMMA HOUSING PROGRAMME - THE INDIVIDUAL INSTEAD OF CONSTRUCTING HOUSE SOLD THE PLOT FOR Rs.6,000/- TO A NON LOCAL AND ALSO DISPOSING OF THE CEMENT BAGS SUPPLIED IN THE BLACK MARKET AT HIGHER RATE - MANY OF THE POOR LOCALS ARE WITHOUT HOUSE PLOT AND HOUSE - INELIGIBLE PERSONS WHO WERE ALLOTTED HOUSE PLOT AND HOUSES ARE INDULGING IN ILLEGAL ACTIVITIES CAUSING LOSS TO THE GOVT. AND DEPRIVING ELIGIBLE LOCALS - KINDLY ENQUIRE AND TAKE NECESSARY ACTION AGAINST SUCH ERRANT AND DO JUSTICE TO THE POOR LOCALS.

SRI TAHSILDAR, BODHAN HAD REPORTED THAT HE HAD ENQUIRED INTO THE MATTER AND FOUND THAT SRI MAQSOOD ALI, CO-OPTED MEMBER WAS NEITHER ISSUED ANY HOUSE PLOT NOR RELEASED ANY CEMENT. THE ALLEGATION MADE IS FALSE.

02/03/2009

2743.

G.RAMULU

PENTA KURD (V)

BODHAN (M)

THE VILLAGERS OF PENTA KURD REQUEST FOR SANCTION OF FOLLOWING WORKS ON PRIORITY BASIS FOR THE WELFARE OF SCHOOL GOING CHILDREN AND SICK PEOPLE - 1) SANCTION OF C.C. ROAD AND DRAINAGE FOR THE ROAD BEHIND SCHOOL BUILDING WHICH IS IN BAD SHAPE AND MAINLY USED BY SCHOOL GOING CHILDREN - 2) TO SANCTION PERMANENT BUILDING TO RUN P.H.C. WHICH IS PRESENTLY BEING OPERATED FROM COMMUNITY HALL.

THE D.P.O. HAD REPORTED THAT THE ADJACENT RESIDENTS ARE KEEPING THEIR MILCH ANIMALS ON THE ROAD CAUSING INCONVENIENCE TO THE ROAD USERS AND ALSO THE WASTE IS BLOCKING THE DRAINAGE. AN EMERGENCY MEETING WAS CALLED AND NOTICES ISSUE TO ALL THE OWNERS NOT TO USE THE ROAD AS CATTLE SHED. IF ANY ONE DEVIATES THIS A PENALTY OF Rs.500/- WOULD BE IMPOSE. NOW THE ROAD IS CLEAR.

02/03/2009

2744.

GAINI SAILOO

PENTA KURD (V)

BODHAN (M)

OUR VILLAGE REVENUE OFFICER IS DEMANDING Rs.1,000/- FOR SUPPLY OF APPLICATION FOR OBTAINING NEW RATION CARD - WHEN THE MATTER WAS BROUGHT TO THE NOTICE OF TAHSILDAR, BODHAN HE ALSO SUPPORTED THE DEMANDED OF V.R.O. SRI MANOHAR - KINDLY ENQUIRE AND DO JUSTICE.

THE D.S.O. HAD REPORTED THAT APPLICATIONS WERE ISSUED AT IRIS CENTRE FREE OF COST. AND COMPLETED IN THE MONTH OF DECEMBER 2008. AT PRESENT NO IRIS CENTRES ARE OPENED TO ISSUE FRESH CARDS AS SUCH DEMANDING OF ACCOUNT FOR ISSUE OF FRESH CARD DOES NOT ARISE.

02/03/2009

2745.

C.BHOOPATHI

KAMAREDDY (V)

KAMAREDDY (M)

IN TAHSIL OFFICE, KAMAREDDY FAMILIES WHO HAVE APPLIED FOR SANCTION UNDER N.F.B.S. ARE AWAITING SANCTION FOR THE PAST 15 MONTHS FOR WANT OF BUDGET - KINDLY ARRANGE RELEASE OF BUDGET BEFORE END OF THIS FINANCIAL YEAR AND HELP THE POOR FAMILIES.

 

APPLICATIONS FOR APPOINTMENT OF AGENTS UNDER N.S.S. SCHEME ARE ALSO NOT AVAILABLE IN TAHSIL OFFICES - KINDLY, ARRANGE SUPPLY OF FORMS.

THE TAHSILDAR (NSS) HAD REPORTED THAT APPLICA-TION WAS SUPPLIED TO THE CALLER SRI C.BHOOPATHI IMMEDIA-TELY AFTER HIS REQUEST. THERE IS NO SHORTAGE OF FORMS AND THEY ARE BEING SUPPLIED WHENEVER DEMANDED. THERE IS NO TRUTH IN THE ALLEGATION.

02/03/2009

2746.

AREEFUDDIN

PERKIT (V)

ARMOOR (M) 

IN ZILLA PARISHAD HIGH SCHOOL MOST OF THE STUDENTS ARE GIRLS AND THERE ARE NO TOILET FACILITIES IN THE SCHOOL - MOREOVER THERE IS NO SPACE FOR PROVIDING THESE FACILITIES - I REQUEST THE COLLECTOR KINDLY TO TAKE ADJACENT LAND AND PROVIDE THIS BASIC FACILITY SO THAT THE GIRL STUDENTS MAY NOT SUFFER AND WASTE THEIR TIME TO GO TO HOME TO ATTEND THEIR CALL OF NATURE.

THE D.E.O. HAD REPORTED THAT THERE IS NO SUFFICIENT AND SUITABLE LAND FOR CONSTRUCTION OF TOILETS IN EXISTING SCHOOL PREMISES AS SUCH REQUESTED THE TAHSILDAR ARMOOR TO ACQUIRE 0.20 ACRES OF LAND ADJACENT EXISTING SCHOOL FOR CONSTRUCTION OF TOILETS.

02/03/2009

2747.

GAINI GANGADHAR

PENTA KURD (V)

BODHAN (M)

I HAVE TWO GIRL CHILDREN AND UNDER WENT FAMILY PLANNING OPERATION TWO YEARS BACK AND FILED APPLICATION UNDER G.S.Y. - BUT SO FAR SANCTION IS NOT RECEIVED - ON ENQUIRY IN HEAD OFFICE AT NIZAMABAD IT HAS COME TO KNOW THAT THE SANCTION WAS ALREADY ACCORDED AND SENT TO BODHAN - WHEREAS THE OFFICERS AT BODHAN ARE STATING THAT NO SANCTION IS RECEIVED - KINDLY VERIFY AND DO JUSTICE.

THE P.D.(DW&CDA) HAD REPORTED THAT THE CALLER WAS SANCTIONED UNDER G.C.P. DURING THE YEAR 2006-07 AND THE SANCTIONED PROCEEDINGS WERE SENT ON 13.04.2009.

01/06/2009

2748.

SRI RAM

SEETHAIPET (V)

DHARPALLI (M)

IN OUR VILLAGE THERE ARE TWO BORE WELLS TO MEET THE DRINKING WATER REQUIREMENT OF THE PUBLIC - ONE BORE HAD DRIED UP AND THE MOTOR OF OTHER BORE WELL FAILED - THE OFFICIALS ARE NOT TAKING ANY ACTION TO REPAIR THE FAILED MOTOR - MOREOVER POWER SUPPLY TO THE VILLAGE IS ALSO NOT PROPER - KINDLY ARRANGE SINGLE PHASE CONNECTION TO THE DRINKING WATER BORE WELLS TO ENSURE UNINTERRUPTED POWER SUPPLY.

THE S.E.(RWS) HAD REPORTED THAT GROUND WATER LEVEL IS VERY LOW IN CHETRU AND BAGAVATH THANDAS. TO OVER COME DRINKING WATER PROBLEM 40 K.L. O.H.S.R. WAS SANCTIONED BUT NOT COMMISSIONED FOR WANT OF SUFFICIENT FUNDS. NOW Rs.5.00 LAKHS IS SANCTIONED UNDER CRITICAL GAP WORKS AND THE SCHEME WOULD BE COMMISSIONED WITHIN 4 DAYS.

01/06/2009

2749.

MUTHYAM

AILAPUR (V)

NANDIPET (M)

WE ARE ORGANISING PADDY PURCHASE CENTRE AT GOVT. HIGH SCHOOL AND IN ALL PURCHASED 6,063 BAGS OUT OF THIS STOCK STILL 500 BAGS ARE LEFT UN-LIFTED SINCE 15 DAYS - SINCE MONSOON IS FAST APPROACHING AND SCHOOLS ARE LIKELY TO BE REOPENED ON 12TH JUNE 2009 THIS STOCK HAS TO BE LIFTED ON PRIORITY BASIS - FURTHER FUNDS TOWARDS PADDY ALREADY SUPPLIED ARE NOT RELEASED AND THE FARMERS ARE PRESSING FOR IMMEDIATE PAYMENT - KINDLY ARRANGE FOR RELEASE OF FUNDS.

THE P.D.(DRDA) HAD REPORTED THAT THE ENTIRE STOCK OF 6,063 BAGS OF PADDY PURCHASED BY THE SELF HELP GROUP HAS BEEN SHIFTED TO GODOWN. OUT OF THE TOTAL VALUE OF Rs.22,55,436/- AN AMOUNT OF Rs.8,79,780/- WAS RELEASED ON 01.06.2009. THE BALANCE OF Rs.13,75,656/- WOULD BE RELEASED AS SOON AS FUNDS ARE RECEIVED FROM A.P.STATE CIVIL SUPPLY CORPORATION.

01/06/2009

2750.

DHARPALLI (V)

DHARPALLI (M)

I AM SANCTIONED RURAL E-SEVA UNDER RAJIV INTERNET PROGRAMME BY STEP OFFICE, NIZAMABAD - BUT SO FAR SCHEME IS NOT GROUNDED IN SPITE OF REPEATED REQUESTS TO THE C.E.O. (STEP) - KINDLY ARRANGE FOR IMMEDIATE GROUNDING OF SCHEME AND PROVIDE SELF EMPLOYMENT

THE C.E.O. (STEP) HAD REPORTED THAT RURAL E-SEVA SANCTIONED TO THE CALLER WAS GROUNDED DULY SANCTIONING THE LOAN AND SUBSIDY. THE CALLER AS STARTED FUNCTIONING OF E-SEVA CENTRE.

01/06/2009

2751.

P.LAXMI

PENTA KURD (V)

BODHAN (M)

MY MOTHER IS SANCTIONED HOUSE UNDER INDIRAMMA PHASE-III - I AM A PHYSICALLY CHALLENGED PERSON AND AS SUCH COULD NOT GET MARRIED - MY AGE IS 26 YEARS - AT THE TIME OF SANCTION I HAVE REQUESTED FOR SEPARATE HOUSE AND THE OFFICIALS ADVISED ME TO GO AHEAD WITH THE CONSTRUCTION - NOW THE HOUSE IS AT SLAB LEVEL - SO FAR NO PAYMENT IS RELEASED AND MATERIAL SANCTIONED - ON MY CONSTANT PERSUASION THE OFFICIALS ARE NOW STATING THAT I HAVE TAKEN UP CONSTRUCTION WITHOUT SANCTION FROM HEAD OFFICE & NOT ELIGIBLE FOR ANY ASSISTANCE - I HAVE BARROWED MONEY AND INVESTED IN THIS CONSTRUCTION - I MAY KINDLY BE ACCORDED SANCTION UNDER DISABLED QUOTA AND FUNDS RELEASED TO COMPLETE THE CONSTRUCTION - EARLY ACTION IS REQUESTED.

THE G.M. (HOUSING) HAD REPORTED THAT THE CALLER P.LAXMI D/o RAMULU WAS SANCTIONED HOUSE UNDER INDIRAMMA PHASE-III. AT THE TIME OF DOCUMENTATION IT WAS FOUND THAT FOR MOTHER P.RAJAVVA W/o RAMULU WAS ALSO SANCTIONED HOUSE UNDER INDIRAMMA PHASE-III. BOTH THE INDIVIDUALS ARE HAVING ONE WHITE RATION CARD ONLY. AS SUCH TWO HOUSES CANNOT BE SANCTIONED ON ONE SINGLE WHITE RATION CARD. THEREFORE, CALLER P.LAXMI D/o RAMULU IS NOT ELIGIBLE FOR SANCTION OF SEPARATE HOUSE.

01/06/2009

2752.

KASIRAM

BIRKOOR (V)

BIRKOOR (M)

I HAVE WORKED AS C.C. IN VELEGU PROGRAMME FOR PAST FOUR YEARS - DUE TO SUDDEN DEATH OF MY WIFE I HAVE NOT ATTENDED DUTIES - THE MANDAL SAMAIKYA AFTER PASSING A RESOLUTION HAS TERMINATED MY SERVICES - KINDLY CONSIDER MY REAPPOINTMENT ON HUMANITARIAN GROUNDS.

 

01/06/2009

2753.

SAYANNA

VENCHIRIYAL (V)

BALKONDA (M)

IN OUR VILLAGE TWO TRANSFORMERS ARE LOCATED AT SAME PLACE THAT TOO IN THE MIDDLE OF THE ROAD - THE DISTANCE BETWEEN EACH POLL IS VERY LONG AND THE AGRICULTURE MOTORS ARE AT FAR PLACES - DUE TO WIND THE WIRES ARE SHORT-CIRCUITING CAUSING DAMAGE TO THE MOTORS - WE HAVE REPRESENTED MATTER TO THE TRANSCO AUTHORITIES BUT NO ACTION IS TAKEN TO SHIFT THEM - KINDLY ARRANGE FOR IMMEDIATE SHIFTING OF THESE TRANSFORMERS.

THE S.E. (NPDCL) HAD REPORTED THAT THE TWO TRANSFORMERS ARE LOCATED ON S.S.-01, 63 KVA. AND SS-16, 63 KVA AT VENCHIRIAL. THERE IS NO REQUIREMENT OF SHIFTING OF THESE TRANSFORMERS AS THEIR TECHNICAL FEASIBILITY IS GOOD IN THE EXISTING LOCATION. HENCE THE REQUEST OF THE CALLER DESERVES NO CONSIDERATION.

01/06/2009

2754.

AMRUTH RAO

GUNKOOL (V)

NIZAMSAGAR (M)

I AM A PHYSICALLY HANDICAPPED PERSON AND APPLIED FOR SANCTION OF PENSION IN SEPTEMBER 2008 - MY APPLICATION IS PROCESSED THROUGH V.R.O. AND M.P.D.O. BUT SO FAR I HAVE NOT RECEIVED ANY KIND OF PENSION - SINCE, I AM SUFFERING A LOT KINDLY ARRANGE FOR IMMEDIATE RELEASE OF DISABLED PENSION.

THE P.D.(DRDA) HAD REPORTED THAT THE APPLICATION OF THE CALLER IS ALREADY RECEIVED FROM THE M.P.D.O. AND KEPT IN WEBSITE FOR ADDITIONAL SANCTIONS FROM GOVERNMENT. AS SOON AS ADDL. SANCTIONS ARE RECEIVED HIS REQUEST WOULD BE CONSIDERED.

01/06/2009

2755.

GOPAL NAIK

KAREPALLI (V)

BHEEMGAL (M)

AT THE INSTRUCTIONS OF THE SARPANCH I HAVE LAID A ROAD AT JAMLANAIK AREA UNDER 11TH FINANCE IN THE YEAR 2007 - THE M.B. IS RECORDED AND CHECK MEASUREMENT DONE - BUT SO FAR THE PAYMENT OF Rs.15,000/-  IS NOT DONE - THE SARPANCH IS REFUSING TO PAY - KINDLY ARRANGE FOR IMMEDIATE PAYMENT.

THE D.P.O. HAD REPORTED THAT THE BILL IS PRESENTED IN S.T.O., BHEEMGAL FOR DRAWAL OF FUNDS FROM 11TH FINANCE GRANT. AS SOON AS THE BILL IS PASSED THE PAYMENT WOULD BE CLEARED.

01/06/2009

2756.

ISMAIL

JAKORA (V)

VARNI (M)

I HAVE AVAILED LOAN UNDER P.M.R.Y. - BEFORE ELECTIONS GOVERNMENT HAVE ANNOUNCED LOANS AVAILED BY SCs, STs, BCs AND MINORITIES ARE WAIVED - AS SUCH I HAVE NOT PAID THE INSTALMENTS - NOW THE MANAGER IS PRESSING FOR PAYMENT OF INSTALMENTS STATING THAT GOVT. OF INDIA LOANS ARE NOT WAIVED - KINDLY ARRANGE FOR WAIVER OF LOAN.

 

01/06/2009

2757.

SUMEER AHMED

ARMOOR (V)

ARMOOR (M)

AN AMOUNT OF Rs.1.80 LAKHS WAS SANCTIONED FROM WAKF BOARD UNDER FOOD FOR WORK PROGRAMME IN THE YEAR 2005 WITH Rs.1.00 LAKH AS CASH COMPONENT AND Rs.80,000/- AS RICE COMPONENT FOR MASJID-E-AMEEN IN ARMOOR - THE CASH COMPONENT IS RELEASED BUT RICE WORTH Rs.80,000/- IS YET TO BE RELEASED - KINDLY ARRANGE EITHER FOR RELEASE OF RICE OR CASH TO COMPLETE THE WORK.

THE D.R.O. HAD REPORTED THAT THE CALLER WAS ADVISED TO APPROACH THE AGENCY, WHICH WAS ENTRUSTED WITH CONSTRUCTION BY RELEASING FUNDS FROM WAKF THROUGH M.P.D.O., ARMOOR.

15/06/2009

2758.

GANESH

KAMMARPALLI (V&M)

IN TADPAKAL VILLAGE OF MORTHAD MANDAL THERE IS A PUSHKAR GHAT ON RIVER GODAVARI - EVERY MONDAY & FRIDAY THOUSANDS OF PEOPLE VISIT THIS PLACE FOR HOLY DIP / BATHING IN RIVER GODAVARI, FROM VARIOUS VILLAGES AND MANDALS IN THE DISTRICT - THE VILLAGE DEVELOPMENT COMMITTEE OF TADPAKAL IS COLLECTING HUGE AMOUNTS FOR VEHICLE PARKING, BATHING, COOKING ETC. BUT THEY ARE NOT PROVIDING BASIC AMENITIES LIKE TOILETS, DRESSING ROOM, KITCHEN ETC. - KINDLY INTERVENE AND ARRANGE EITHER FOR NON-COLLECTION OF AMOUNT OR PROVIDING BASIC AMENITIES FOR THE WELFARE OF THE VISITING PUBLIC.

THE D.P.O. HAD REPORTED THAT VILLAGE DEVELOP-MENT COMMITTEE IS NOT INVOLVED EITHER IN MAINTENANCE OF PUSHKAR GHAT OR COLLECTION OF PARKING FEES. THE PUSHKAR GHAT IS BEING MAINTAINED BY THE ENDOWMENTS DEPARTMENT AND THE PARKING FEE ETC. IS BEING COLLECTED BY VILLAGE ENDOWMENT COMMITTEE. THEREFORE, THE ENDOWMENT DEPART-MENT MAY BE ADDRESSED FOR PROVIDING FACILITIES AND REDUCTION IN PARKING FEE BEING COLLECTED.

15/06/2009

2759.

SANGAM ANIL KUMAR

MORTHAD (V&M) 

THE APS RTC BUS STAND OF MORTHAD MANDAL IS LOCATED ON NATIONAL HIGHWAY - LARGE NUMBER OF BUSES FROM NIZAMABAD AND KARIMNAGAR DISTRICTS PLY ON THIS ROUTE AND PASS THROUGH MORTHAD BUS STAND - THE BUS STAND IS LOCATED IN A B.C. SOIL AREA AND BIG POT HOLES ARE FARMED RESULTING MOVEMENT OF BUSES VERY DIFFICULT AND CAUSING INCONVENIENCE TO STUDENTS, DISABLED PERSONS, PREGNANT WOMEN AND SENIOR CITIZENS - THE PITS WERE LEVELLED SEVERAL TIMES BY G.P. BUT THE POT HOLES ARE RECURRING -  IT REQUIRES B.T. OR C.C. FLOORING - KINDLY INSTRUCT THE D.P.O./ R.M.(RTC) TO RELEASE FUNDS FOR LAYING B.T/C.C. FLOORING.

THE R.M., APS RTC HAD REPORTED THAT THE TEMPORARY REPAIRS HAVE BEEN DONE TO ENSURE MOVEMENT OF BUSES. DUE TO LACK OF FUNDS DURING CURRENT YEAR C.C. FLOORING CAN NOT BE TAKEN UP AND CIVIL ENGINEERING DEPARTMENT WAS INSTRUCTED TO INCLUDE THIS WORK NEXT FINANCIAL YEAR.

15/06/2009

2760.

 

DUBBAK (V) 

DHARPALLY (M)

A LIFT IRRIGATION IS SANCTIONED FROM RAMADUGU PROJECT TO DUBBAKA VILLAGE IN DHARPALLY MANDAL - AVAILABILITY OF WATER REPORT ETC. IS DUE FROM E.E. (IB), KAMAREDDY TO C.E., IRRIGATION, HYDERABAD - WE HAVE APPROACH E.E. SEVERAL TIMES BUT THERE IS NO RESPONSE - KINDLY ARRANGE FOR FURNISHING REQUIRE REPORT SO THAT FUNDS COULD BE RELEASED AND THE DRY BELT OF DUBBAKA TURNS INTO GREEN FIELDS AND UP LIFT THE LIVING CONDITIONS OF POOR FARMERS.

THE E.E.(IB), KAMAREDDY HAD REPORTED THAT PROPOSAL WAS SUBMITTED TO THE E.N.C. MEDIUM IRRIGATION, HYDERABAD ON 12.12.2008. THE E.N.C. HAS CALLED FOR COMMAND AREA MAP OF 2000 ACRES OF ADDITIONAL AYACUT OF RAMADUGU PROJECT. DULY SUPER IMPOSING THE AREA OF 300 ACRES PROPOSED UNDER L.I. SCHEME ANNOUNCED BY HON'BLE CHIEF MINISTER ON 26.04.2006. THE MAPS ARE UNDER PREPARATION AT I.B. SUB-DIVISION, KAMAREDDY AND THE SAME WOULD BE SUBMITTED TO E.N.C. BY 15.07.2009.

15/06/2009

2761.

VASANTH  

SREENGAR (V)

VARNI (M)

UNDER INDIRAMMA HOUSING PROGRAMME HOUSES WERE SANCTIONED TO 7 TO 8 FAMILIES IN AMBEDKAR COLONY, SRINAGAR VILLAGE, VARNI MANDAL - SRI CHALAPATHI, SUPERVISOR IS NOT ISSUING CEMENT AND ARRANGING PAYMENTS FOR THE WORKS COMPLETED - HE IS ALSO ABUSING US IN FILTHY LANGUAGE WHEN REQUESTED FOR RELEASE OF CEMENT AND AMOUNT - KINDLY ENQUIRE AND DO JUSTICE.

THE G.M. (HOUSING) HAD REPORTED THAT THE CALLER HAD CONSTRUCTED HOUSE UNDER INDIRAMMA HOUSING PROGRAMME AND IT IS AT R.C. LEVEL. CEMENT WAS RELEASED BUT DUE TO LAKE OF CEMENT IN THE GODOWN IT WAS NOT RELEASED. THE M.B., AP HOUSING CORPORATION AS INTRODUCED NEW ACTION PLAN FROM 01.06.2009 AND THE DY.E.E. WAS INSTRUCTED TO TAKE ACTION ACCORDINGLY. 

15/06/2009

2762.

GANGA MANI

NANDIPET (V&M)

A SCHOOL BUILDING WAS CONSTRUCTED IN MY PATTA LAND AND IN LIEU OF THIS GOVT. HAVE GIVEN ME ALTERNATE LAND FOR 0.30 GTS. AND PATTA CERTIFICATE ISSUED - BUT SO FAR THE LAND IS NOT SURVEYED AND PHYSICAL POSSESSION NOT HANDED OVER - MY REPEATED REQUESTS TO THE TAHSILDAR, NANDIPET FOR THE PAST ONE YEAR DID NOT YIELD ANY RESULT - KINDLY INTERVENE AND DO JUSTICE.

THE A.D.(S&LR), NIZAMABAD AND TAHSILDAR, NANDIPET HAVE REPORTED THAT SRI TUNGENA RAJARAM S/o LAXMAIAH WAS ASSIGNED 0.30 ACRES IN LIEU OF LAND TAKEN FOR POLICE STATION AND SIMILARLY 0.30 ACRES WAS ALLOTTED TO VANNELA GANGAMANI IN LIEU OF LAND TAKEN FOR SCHOOL BUILDING. BUT SRI TUNGENA RAJARAM HAD OCCUPIED 1.20 ACRES AS AGAINST 0.30 ACRES ASSIGNED. AT PRESENT IS NOT AVAILABLE IN THE VILLAGE. A NOTICE IS ISSUED AND 0.30 ACRES WOULD BE TAKEN FROM HIS POSSESSION AND HANDED OVER TO VANNELA GANGAMANI.

15/06/2009

2763.

 

MAYAPOOR (V)

NANDIPET (M)

IN OUR VILLAGE SARPANCH IS A LADY CANDIDATE AND UNABLE TO DISCHARGE HER DUTIES - TAKING ADVANTAGE OF THIS SEVERAL HOUSE HOLDS ARE TAKING ILLEGAL TAP CONNECTIONS WITHOUT ASSISTANCE OF TECHNICAL PERSONS - THIS IS RESULTING LEAKAGE OF WATER AND PUMPING OF ADULTERATED WATER TO ALL THE HOUSE HOLDS RESULTING HEALTH PROBLEMS - KINDLY INSTRUCT THE CONCERNED TO DISCONNECT ALL ILLEGAL CONNECTIONS AND REPAIR THE LEAKAGES TO ENSURE SUPPLY OF SAFE WATER TO THE PUBLIC.

THE D.P.O. HAD REPORTED THAT SUITABLE INSTRUCTIONS WERE ISSUED TO THE PANCHAYAT SECRETARY, G.P., AND SARPANCH TO DISCONNECT ALL ILLEGAL TAP CONNECTIONS AND REPORT COMPLIANCE WITHIN 15 DAYS. ACTION IS IN PROGRESS.

15/06/2009

2764.

 

REDDYPET (V)

MACHAREDDY (M)

I AM WORKING AS A PRERAK AT BOOK DEPOSIT CENTRE UNDER RAMAREDDY BRANCH LIBRARY - MY SALARY FOR THE MONTH OF APRIL/ MAY 2009 IS RELEASED BUT THE BRANCH SUPERVISOR SRI RAM MOHAN RAO WHOSE TELEPHONE NO. IS 08468-255009 IS NOT PAYING THE SALARY OF Rs.300/- PER MONTH - KINDLY ARRANGE FOR PAYMENT AT AN EARLY DATE.

THE SECRETARY (Z.G.S.) HAD REPORTED THAT THE PRERAK OF BOOK DEPOSIT CENTRE UNDER RAMAREDDY BRANCH LIBRARY DID NOT SUBMIT MONTHLY AND DAILY NEWS PAPERS TO THE BRANCH LIBRARY TO ENABLE PAYMENT OF SALARY FOR THE MONTH OF APRIL 2009. THE BRANCH LIBRARIAN WAITED UPTO 09.06.2009 AND WHEN THE MAGAZINES AND NEWS PAPERS NOT DEPOSITED HE REMITTED THE AMOUNT TO GOVT. ACCOUNT THROUGH CHALLAN NO. 3492, DATED 10.06.2009 SUITABLE INSTRUCTIONS WERE ISSUED NOT TO REPEAT SUCH INCIDENTS IN FUTURE.

15/06/2009

2765.

 

HEGDOLI (V)

KOTAGIR (M)

THERE IS A LINK ROAD FROM HEGDOLI TO KOTGIR VIA. YADGARPUR -THIS ROAD PASSES THROUGH AGRICULTURE FIELDS FOR THE BENEFIT OF MANY FARMERS TO TAKE THEIR PRODUCE TO MARKET - PIPES ARE SANCTIONED BY THE M.L.A. - THE ROAD HAS TO BE CUT AND PIPES ARE LAID FOR FLOW OF WATER - KINDLY SANCTION AMOUNT/ WORK UNDER N.R.E.G.S. AT AN EARLY DATE FOR THE BENEFIT OF FARMERS.

THE P.D.(DWMA) HAD REPORTED THAT RECENTLY GOVERNMENT HAVE PERMITTED TO TAKE UP LINK ROADS CONNECTING AGRICULTURE FIELDS. THE SOFTWARE TO THIS EFFECT IS TO BE RELEASED FROM T.C.S. IN THE MEAN TIME THE MPDO, KOTAGIRI WAS INSTRUCTED TO PROCESS THE PROPOSAL FOR ACCORDING ADMINISTRATIVE SANCTION UNDER N.R.E.G.S.

15/06/2009

2766.

SATYANANDAM

PERKIT (V)

ARMOOR (M)

ON BEHALF OF THE AYACUTDARS UNDER DISTRIBUTORY NO.7 OF NIZAMSAGAR PROJECT I HAVE FILED APPLICATION UNDER GRIEVANCES CELL WITH REGISTER NO.15663, DATED17.09.2007 FOR DE-SILTING OF DISTRIBUTORY NO.7 - BUT SO FAR NO ACTION IS TAKEN AND THE FIELDS ARE NOT RECEIVING WATER UNDER N.S. CANAL - KINDLY ARRANGE FOR DE-SILTING TO HELP THE POOR FARMERS.

THE E.E.(IB), NIZAMABAD HAD REPORTED THAT THE FARMERS HAVE ENCROACHED DISTRIBUTORY NO. 82/7 SOME CHEPUR FEEDER CHANNEL TO CHEPUR SHIVAR. AT PRESENT THERE IS NO TRACE OF THE CANAL. HOWEVER, ESTIMATES HAVE BEEN PREPARED AND AS ADMINISTRATIVE APPROVAL IS RECEIVED ACTION WOULD BE TAKEN TO EVICT THE ENCROACHERS AND TO RECONSTRUCT THE FEEDER CHANNEL. 

15/06/2009

2767.

 

RUDRUR (V)

VARNI (M)

IN A ROAD ACCIDENT MY SON NARAYANA, AGED 35 YEARS DIED AND MY SELF AND MY WIFE SUFFERED FRACTURED LEGS - I HAVE SUBMITTED FOR ASSISTANCE UNDER APATHBANDU DULY SUBMITTING ALL DOCUMENTS - BUT SO FAR ASSISTANCE IS NOT RECEIVED - SINCE MY LEG IS FRACTURED I AM UNABLE TO GO TO THE OFFICES TO KNOW THE POSITION - KINDLY VERIFY AND ARRANGE IMMEDIATE SANCTION.

THE D.R.O. HAD REPORTED THAT PROPOSAL HAD ALREADY BEEN SUBMITTED TO THE STAR HEALTH AND ALLIED INSURANCE VIDE LR.NO. D4/505/09, DATED 17.06.2009. AS SOON AS SANCTION IS RECEIVED AMOUNT WOULD BE DISBURSED TO THE CALLER UNDER APATHBANDU SCHEME.

15/06/2009

2768.

SOLMON JAUSHWA

NANDIPET (V&M)

 

I HAVE SUBMITTED PROPOSAL FOR RELEASE OF FUNDS TO COMPLETE THE BALANCE WORK OF CHURCH CONSTRUCTION - BUT THE PROPOSALS ARE NOT FORWARDED TO THE GOVT. CAUSING DELAY IN RELEASING OF FUNDS - FURTHER, WE HAVE APPLIED FOR ALLOTMENT OF LAND FOR BURIAL GROUND - BUT SO FAR LAND IS NOT ALLOTTED WHICH IS CAUSING LOT OF INCONVENIENCE TO BURRY THE DEAD - KINDLY DO THE NEEDFUL.

THE D.M.W.O. HAD REPORTED THAT PROPOSAL WAS SUBMITTED TO THE V.C.&M.D., APSCFC LTD., HYDERABAD ON 23.06.2009 AND SANCTION IS STILL AWAITED. AS SOON AS SANCTION IS RECEIVED AND FUNDS RELEASED THE SAME WOULD BE PAID TO THE CHURCH FOR COMPLETION OF BALANCE WORK.

06/07/2009

2769.

VITTAL GOUD

AMDAPUR (V)

BODHAN (M)

OUR VILLAGE IDENTIFIED UNDER INDERAMMA PHASE-III PROGRAMME - AT THE TIME OF SURVEY SOME OF THE BENEFICIARIES COULD NOT PRODUCE WHITE RATION CARDS, AS SOME WERE DAMAGED IN FIRE ACCIDENT AND NOW SOME BENEFICIARIES BECOME ELIGIBLE DUE TO CONVERSION OF PINK CARDS INTO WHITE - AROUND 200 BENEFICIARIES ARE TO BE SANCTIONED HOUSES OUT OF WHICH AROUND 25 FAMILIES HAVE ALREADY STARTED CONSTRUCTION IN ANTICIPATION OF SANCTION - KINDLY ARRANGE FOR IMMEDIATE SANCTION TO ALL THE ELIGIBLE BENEFICIARIES.

THE G.M. (HOUSING) HAD REPORTED THAT THE BENEFICIARY WISE STATUS REPORT FOR 175 BENEFICIARIES AND STAGE OF 25 HOUSES UNDER CONSTRUCTION IS AWAITED FROM DY.EE, HOUSING, BODHAN.

06/07/2009

2770.

WARD NO.30

BODHAN (V)

I HAVE SUBMITTED D.D. TOWARDS MY SHARE FOR CONSTRUCTION OF INDIVIDUAL SANITARY LATRINE IN THE YEAR 2003 - THE COMMISSIONER, MUNICIPALITY PROMISED TO COMPLETE THE WORK IN THE MONTH OF JANUARY THIS YEAR - BUT SO FAR THE WORK HAS NOT STARTED - THERE IS NO RESPONSE FROM THE COMMISSIONER - SINCE MORETHAN 5 YEARS ARE OVER I REQUEST YOU ISSUE SUITABLE INSTRUCTIONS TO THE COMMISSIONER, M.C., BODHAN TO COMPLETE THE WORK ON PRIORITY BASIS. 

THE COMMISSIONER, M.C., BODHAN HAD REPORTED THAT THE MUNICIPALITY NOT HAVING I.L.C.S. FUND. THE C&DMA, A.P. HYDERABAD WAS ADDRESSED TO RELEASE THE FUND. AFTER RECEIPT OF FUND THE WORK WOULD BE COMPLETED. 

06/07/2009

2771.

RAVINDER

MENDORA (V)

BHEEMGAL (M)

VANNELAVARI @ TURAKAVARI KUNTA IS SPREAD OVER SIX ACRES AND HAS A FIXED AYACUT - THE ADJOINING FARMERS HAVE STARTED ENCROACHING THE SHIKAM FOR THE PAST THREE YEARS AND REDUCED THE TANK BED TO THREE ACRES - THE REGISTERED AYACUTDARS ARE NOT GETTING WATER TO RAISE THE CROPS - I HAVE BEEN COMPLAINING BEFORE THE MRO/ TAHSILDAR FOR THE PAST THREE YEARS BUT NO ACTION IS TAKEN TO EVICT THE ENCROACHERS - I HAVE ALSO FILED PETITION IN PRAJAVANI VIDE RECEIPT NO. 12253 - KINDLY ENQUIRE AND DO JUSTICE.- (DYC LR.NO.2718, 19.01.2009)

THE TAHSILDAR, BHEEMGAL HAD REPORTED THAT IN SY.NO. 156 THE SHIKAM LAND IS RECORDED AS 7.01 ACRES. THE MANDAL SURVEYOR HAD SURVEYED THE LAND AND FIXED BOUNDARIES. ENCROACHMENTS HAVE BEEN EVICTED. ONE SRI PEDDA NARSAIAH S/o GANGARAM HAD DRILLED A BORE WELL IN SHIKAM LAND AS BORE WELLS IN HIS PATTA LANDS FAILED. WHEN THE REVENUE INSPECTOR TRY TO REMOVE THIS BORE HE HAD THREATENED TO COMMIT SUICIDE. AT PRESENT EXCEPT THIS BORE WELL THERE IS NO ENCROACHMENT IN THE SHIKAM LAND. 

06/07/2009

2772.

SARPANCH

AMDAPUR (V)

BODHAN (M)

IN OUR VILLAGE HOUSE HOLDS WHO ARE HAVING WHITE RATION CARDS ARE NOT ISSUED AAROGYA SREE CARDS - KINDLY ARRANGE TO ISSUE AAROGYA SREE CARDS TO ALL THE ELIGIBLE FAMILIES AS EARLY AS POSSIBLE FOR AVAILING THE MEDICAL BENEFITS BEING PROVIDED BY THE GOVERNMENT.

THE TAHSILDAR, BODHAN HAD REPORTED THAT IN AMDAPUR 839 WHITE AND AAY CARDS WERE ISSUED. OUT OF THIS AAROGYA SREE CARDS WERE ISSUED TO 606 CARD HOLDERS. THE REMAINING 233 CARDS WERE ISSUED IN 2ND AND 3RD PHASE FOR WHICH AAROGYA SREE CARDS WERE NOT PRINTED AND SUPPLIED. AS SUCH THEY WERE NOT ISSUED AAROGYASREE CARDS. HOWEVER, MEDICAL TREATMENT IS BEING GIVEN ON PRODUCTION OF WHITE RATION CARD WITH OUT INSISTING FOR AAROGYA SREE CARD.

06/07/2009

2773.

SWAMY

DOMAKONDA (V)

DOMAKONDA (M)

MY DOMESTIC DRINKING WATER TAP CONNECTION NUMBER IS 17 - ALONGWITH ME ANOTHER 10 FAMILIES WHO HAVE TAKEN TAP CONNECTION - BUT WE ARE NOT GETTING ANY WATER THROUGH THIS TAP - WE HAVE BEEN REPRESENTING TO THE SARPANCH AND SECRETARY FOR ENSURING SUPPLY OF DRINKING WATER - BUT THEY ARE NOT TAKING ANY ACTION - THIS YEAR WHEN THEY HAVE COME FOR TAX COLLECTION WE RAISE THE ISSUE - THEY HAVE ADVISED NOT TO PAY WATER TAX - IT IS NOT FOR PAYMENT OF TAX, BUT OUR GRIEVANCE IS TO ENSURE SUPPLY OF DRINKING WATER AS WE HAVE TO FETCH THE WATER FROM A FAR OF PLACE.

THE D.P.O. HAD REPORTED THAT THE CALLER SRI SWAMY S/o NARAYANA HAD NOT PAID PROPERTY TAX AND WATER TAX FOR THE PAST THREE YEARS. HOWEVER, DUE TO SUMMER THE WATER LEVEL IN BORE WELLS DROPPED AND WATER WAS SUPPLIED FOR A LIMITED TIME. NOW, WORK IS GOING ON LAYING ANOTHER PIPE LINE IN THIS WARD AND AS SOON AS IT IS COMPLETED THE NORMAL WATER SUPPLY IS RESTORED. THE SAME WAS INFORMED TO THE CALLER.

20/07/2009

2774.

GOLLA GANGADHAR

TADKOLE (V)

BANSWADA (M)

IN TADKOLE VILLAGE OF BANSWADA MANDAL NEARLY 750 HOUSES WERE SANCTIONED -OUT OF WHICH NEARLY 350 HOUSES ARE UNDER CONSTRUCTION AND AT DIFFERENT LEVELS - ANOTHER 25 INDIVIDUALS WHO DO NOT POSSESS WHITE RATION CARD ARE INTERESTED TO TAKE UP CONSTRUCTION - KINDLY INSTRUCT THE HOUSING AUTHORITIES TO IDENTIFY THEM AND ISSUE SANCTION ORDERS.

 

THERE IS ONLY ONE A.E. LOOKING AFTER BANSWADA AND BIRKUR MANDALS WHERE MORE NO NUMBER OF HOUSES ARE UNDER CONSTRUCTION AND AS SUCH RECORDING OF M.B. AND PAYMENT OF BILLS IS GETTING DELAYED RESULTING POOR PROGRESS IN THE CONSTRUCTION OF HOUSES - SINCE 60 HOUSES ARE HELD UP FOR WANT OF PAYMENT, KINDLY ARRANGE EITHER FOR IMMEDIATE RECORDING OF M.B. OR POST ANOTHER A.E. TO BIRKUR MANDAL TO EXPEDITE PAYMENTS AND CONSTRUCTION OF HOUSES.

THE G.M. (HOUSING) HAD REPORTED THAT THE MATTER WAS GOT VERIFIED TO THE DY. E.E.(HOUSING), BANSWADA AND THE DETAILS ARE AS UNDER.

IN ALL 618 HOUSES WERE SANCTIONED UNDER INDIRAMMA PHASE-III. OUT OF WHICH 52 HOUSES WERE COMPLETED AND 149 HOUSES ARE IN PROGRESS AT DIFFERENT LEVELS. 417 HOUSES ARE NOT STARTED UNDER DETAILS FOR NOT STARTING ARE UNDER VERIFICATION. FINAL REPORT WOULD BE SUBMITTED SHORTLY.

REGARDING 25 ELIGIBLE PERSONS WHO WERE NOT SANCTIONED HOUSES UNDER PHASE-III, THE DY.EE. HAD STATED THAT ONLY 10 PERSONS ARE RESIDING IN THE VILLAGE AND THEY ARE NOT HAVING EITHER WHITE RATION CARD, PATTA CERTIFICATE OR POSSESSION CERTIFICATE NOT SUBMITTED, MIGRATED TO OTHER VILLAGES AT THE TIME OF SURVEY. NOW THEIR DETAILS ARE BEING OBTAINED AND SUITABLE PROPOSALS WOULD BE SUBMITTED AFTER COMPLETION OF FORMALITIES. REGARDING WORKING OF ONE A.E. FOR TWO MANDALS THE DY.E.E. HAD REPORTED THAT ONE SRI SRINIVAS WAS APPOINTED AS A.E. FOR BANSWADA BUT HE FAILED TO JOIN DUTY AND ACTION IS IN PROCESS TO POST ANOTHER A.E. AT PRESENT ALL THE BILLS TO THE ELIGIBLE PERSONS WERE PAID AND NO BILLS ARE PENDING FOR PAYMENT.

20/07/2009

2775.

VENKATESHAM

KAMAREDDY (V)

KAMAREDDY (M)

ASHOK NAGAR COLONY IS LOCATED WITHIN THE MUNICIPAL LIMITS OF KAMAREDDY MUNICIPALITY, BUT IT IS ON THE OUTSKIRTS OF THE MUNICIPALITY - MUNICIPALITY IS TOTALLY NEGLECTING DEVELOPMENT OF THIS COLONY - SEVERAL REPRESENTATIONS DID NOT YIELD ANY RESULT - THE FOLLOWING PROBLEMS MAY KINDLY BE SOLVED ON PRIORITY BASIS.

 

1. FIXING OF STREET LIGHTS TO THE POLLS ALREADY ERECTED.

2. THE EXISTING APPROACH ROAD IS FULL OF DITCHES AND PEOPLE CANNOT EVEN WALK ON THIS ROAD. KINDLY SANCTION AT LEAST GRAVEL ROAD TO SOLVE THE PROBLEM IN RAINY SEASON.

3. DRINKING WATER PIPELINE IS BEING LAID ONLY TO COLONIES WHICH HAVE HOUSES BY RICH PEOPLE. KINDLY ARRANGE EXTENSION OF DRINKING WATER PIPE LINE TO OUR COLONY ALSO.

THE COMMISSIONER, M.C., KAMAREDDY HAD REPORTED THAT STREET LIGHTS IN ALL THE STREETS ARE BEING FIXED FROM 20TH OF THIS MONTH AND THE WORK IS COMPLETED. NOW THERE IS NO STREET IS LEFT WITHOUT STREET LIGHTING. REGARDING ROADS AND DRAINAGES THE COMMISSIONER HAD STATED THAT THIS WORK IS UNDER PROGRESS IN THE ENTIRE MUNICIPAL AREA WITH AN ESTIMATED COST OF Rs.24.50 CRORES UNDER U.I.D.S.S.M.T. SCHEME. ONCE THIS WORK IS OVER ALL THE ROADS AND DRAINAGES WOULD BE COMPLETED.

20/07/2009

2776.

PAPI REDDY

YADARAM (V)

DOMAKONDA (M)

OUR UPPER PRIMARY SCHOOL WAS UPGRADED INTO HIGH SCHOOL 2 YEARS BACK - THE SCHOOL IS HAVING FOUR CLASS ROOMS ONLY - ANOTHER FOUR ADDITIONAL CLASS ROOMS ARE REQUIRED TO ACCOMMODATE ALL THE CLASS  - IN VIEW OF THE RAINY SEASON CLASS COULD NOT BE CONDUCTED IN OPEN AREA OR UNDER THE SHADE OF TREES - KINDLY ARRANGE FOR SANCTION OF FOUR ADDITIONAL CLASS ROOMS IMMEDIATELY.

THE D.E.O. HAD REPORTED THAT CLASSES 6 TO 10TH ARE FUNCTIONING WITH ON P.G. HEAD MASTER, SCHOOL ASST. MATHS/ SOCIAL AND ONE S.G.T. THE SCHOOL IS HAVING THREE CLASS ROOMS.

 

ADDITIONAL REQUIRED STAFF WOULD BE ALLOTTED WHEN DSC-2008 RECRUITMENT TAKES PLACE AND FIVE ADDITIONAL CLASS ROOMS AND KITCHEN SHED WOULD BE SANCTIONED AS SOON AS BUDGET IS RECEIVED.

20/07/2009

2777.

SUDHARSHAN

KHANAPUR (V)

NIZAMABAD (M)

IN OUR VILLAGE THERE IS ONLY ONE FAIR PRICE SHOP - THERE ARE TWO HAMLET VILLAGES AT A DISTANCE OF MORE THAN 1 K.M. - THE NUMBER OF CARDS ARE ALSO MORE THAN 1,000 - KINDLY SANCTION ONE MORE FAIR PRICE SHOP FOR THE CONVENIENCE OF HAMLET VILLAGES.

THE D.S.O. HAD REPORTED THAT THERE ARE 947 RATION CARDS IN THE F.P. SHOP AT KHANAPOOR. ONE NEW F.P. SHOP IS SANCTIONED KEEPING IN VIEW ISSUE OF NEW CARDS AND CONVERSION OF PINK CARDS IN TO WHITE RATION CARDS. THE R.D.O., NIZAMABAD WAS REQUESTED TO APPOINT DEALER DULY BIFURCATING THE CARDS TO TWO F.P. SHOPS. THE WORK IS UNDER PROCESS. AS SOON AS NEW DEALER IS APPOINTED THE PROBLEM OF THE COMPLAINT WOULD BE SOLVED.

20/07/2009

2778.

RAJANNA

PALDA (V)

NIZAMABAD (M)

MY ELECTRICAL SERVICE NO. IS 138 UNDER TRANSFORMER SS-8 - WIRES FROM THIS TRANSFORMER TO THE BORE WELLS ARE VERY LOW - MY TWO ACRES OF CROP WAS BURNT AWAY DUE TO FIRE ACCIDENT CAUSED BY CROSS CONNECTION OF WIRES DUE TO WIND - I HAVE FILED APPLICATION FOR COMPENSATION BUT SO FAR NO ACTION IS TAKEN - KINDLY ARRANGE FOR IMMEDIATE LIFTING OF WIRES AND ARRANGING COMPENSATION FOR CROP DAMAGED.

 

THERE IS ONE IDULA KALVA THROUGH WHICH WATER USED TO REACH OUR FIELDS - P.R. DEPARTMENT HAD FORMED A ROAD WITH AN ESTIMATED COST OF RS.1.90 LAKHS BUT THEY HAVE CLOSED THE EXISTING CANAL - THEREFORE WATER IS NOT REACHING OUR FIELDS AND CROPS ARE GETTING DRIED UP - KINDLY ARRANGE FOR DESALTING OF EXISTING CANAL.

THE S.E.(NPDCL) HAD REPORTED THAT THE LOOSE LINES EXISTED ON S.S.-08 OF PALDA VILLAGE D.T.R. HAVE BEEN RECTIFIED BY RE-STRINGING. THE OTHER ASPECT OF CROP BURNT IN 2.00 ACRES DUE TO FIRE CAUSED BY SHORT-CIRCUIT OF LOOSE LINES IS NOT CORRECT. NO COMPLAINT WAS REGISTERED AT SECTION OFFICE, SARANGAPUR IN THIS REGARD AND NO SUCH COMPLAINT FIELD WITH N.P.D.C.L. OR PRINT MEDIA PUBLISH SUCH INCIDENT. HENCE, THE COMPLAINT OF CROP DAMAGE IN 2.00 ACRES IS FAKE AND INCORRECT.

 

THE E.E.(PR) HAD REPORTED THAT A ROAD FROM REDDY FARM TO MAHA LAXMI TEMPLE AT PALDA VIA. ANJUMAN FARM WAS FORMED WITH AN ESTIMATED COST OF Rs.1.70 LAKHS AND THIS ROAD WAS NOT LAID ON ANY CANAL. IT WAS LEARNT THAT I.B. OFFICIALS HAVE BLOCK THE CANAL FOR COMPLETION OF LINING OF CANAL. AFTER COMPLETION OF LINING WORK THE BLOCK WAS REMOVED AND NOW WATER IS FLOWING UNOBSTRUCTED. WHEREAS, THE E.E.(IB) HAD REPORTED THAT THE PRESIDENT, W.U.A. NO.49 KALUR OF NIZAMSAGAR PROJECT INSPECTED THE CANAL AND REPORTED THAT THE CANAL IS SILTED UP DUE TO FORMATION OF ROAD BY P.R. DEPARTMENT. HOWEVER, THE DE-SILTING WORK WOULD BE TAKEN UP AND COMPLETED BY 01.08.2009.

20/07/2009

2779.

RACHAPPA

VARNI (V)

VARNI (M)

THERE IS A BUS FROM BODHAN TO HUMNAPUR VIA OLD VARNI PARTICULARLY RUNNING FOR CONVENIENCE FOR SCHOOL GOING STUDENTS - THE TIMING IS 09.00 A.M. IN THE MORNING AND 04.30 P.M. IN THE AFTERNOON - BUT, TIMINGS ARE NOT BEING MAINTAINED AND CAUSING LOT OF INCONVENIENCE FOR SCHOOL GOING CHILDREN - WE HAVE REPRESENTED THE ISSUE TO THE DEPOT MANAGER, BODHAN BUT HE HAS NOT TAKEN ANY ACTION - KINDLY ENSURE FOR MAINTAINING TIMINGS OF 09.00 A.M. IN THE MORNING AND 04.30 P.M. IN THE AFTERNOON.

THE R.M. (APS RTC) HAD REPORTED THAT BODHAN DEPOT IS OPERATING FOUR TRIPS FROM BODHAN TO OLD VARNI VIA. HUMNAPUR AND THE DETAILS ARE AS UNDER

BODHAN - OLD VARNI 07.15 A.M. VIA AMBAM, 08.50 A.M. VIA HUMNAPUR, 03.15 P.M. VIA HUMNAPUR, 03.20 P.M. DIRECT.

OLD VARNI TO BODHAN 08.20 A.M. VIA AMBAM, 09.55 A.M. TO BODHAN, 04.00 P.M. TO BODHAN VIA. OLD VARNI, 04.15 P.M. TO BODHAN.

03/08/2009

2780.

GAYASUDDIN

ZPTC, YELLAREDDY (V)

YELLAREDDY (M)

IN YELLAREDDY PROPER AND ADJOINING VILLAGES LIKE; VELLUTLA, VELLUTLAPETA, VENKATAPUR, LAXMAPUR, GANDIMASANIPET, ADVILINGAL, LINGA REDDY PET,  ETC. WHICH ARE UNDER THE COMMAND OF POCHARAM PROJECT AND TANKS FED BY POCHARAM CANAL HAVE DRIED UP - THIS HAS RESULTED IN SERIOUS DRINKING WATER PROBLEM IN THE VILLAGES INCLUDING YELLAREDDY PROPER WHICH HAS MORE THAN 10,000 POPULATION - KINDLY DEPUTE A TEAM AND ASSESS THE SITUATION AND TAKE URGENT ACTION FOR SUPPLY OF DRINKING WATER.

THE S.E.(RWS) HAD INFORMED THAT THE OFFICIALS HAVE VISITED THE VILLAGES AND IDENTIFIED THE LOCATIONS FACING DRINKING WATER PROBLEM AND OBTAINED APPROVAL OF THE DISTRICT COLLECTOR FOR SUPPLYING OF THE DRINKING WATER THROUGH TANKERS.

03/08/2009

2781.

KASIMMA

MOSHAMPUR (V)

NIZAMSAGAR (M)

MY HUSBAND ANJAIAH DIED IN A ROAD ACCIDENT AND I HAVE APPLIED FOR ASSISTANCE UNDER APATHBANDU SCHEME - BUT, SO FAR NO ONE HAD COME FOR ENQUIRY - ON MY EARLIER REPRESENTATION THE TAHSILDAR, NIZAMSAGAR WAS DIRECTED TO EXPEDITE ENQUIRY AND PROVIDE ASSISTANCE - BUT, NO ACTION IS TAKEN - KINDLY DO JUSTICE TO THIS POOR WIDOW. 

THE TAHSILDAR, NIZAMSAGAR HAD REPORTED THAT THE HUSBAND OF THE CALLER NAMELY ANANDAPALLY ANJAIAH, AGED ABOUT 45 YEARS DIED ON 24.04.2007 IN A MOTOR CYCLE ACCIDENT AT DINDIGALL OF HYDERABAD, WHERE HE WAS WORKING AS MASON. THE CAUSE OF DEATH WAS DUE TO HEAD INJURY AND THE DECEASED HAD CONSUMED ALCOHOL. THE FAMILY IS HAVING WHITE RATION CARD AND THE INCOME IS Rs.15000/- P.A. AND NOT ELIGIBLE UNDER APATHBANDU SCHEME.

 

THE APPLICANT HAD FILED APPLICATION ON 10.11.2008 FOR ASSISTANCE VIDE PRAJAVANI NO.11311 WHICH IS TIME BARRED. THE SAME WAS INFORMED TO THE COLLECTOR VIDE LR.NO.B/5250/2008, DATED 30.12.2008. THIS IS FOR KIND INFORMATION.

03/08/2009

2782.

BHOOMESHWAR

BHEEMGAL (V)

BHEEMGAL (M)

IN BHEEMGAL PROPER GRAVEL WORK IS GOING ON - THESE ROADS WERE FORMED RECENTLY WITH R.R.M. GRANTS - THERE IS NO NEED FOR LAYING GRAVEL ON THESE ROADS - THEY ARE JUST SPRAYING THE GRAVEL WITH BAD INTENTION TO CLAIM BILLS - IN SRIRAMNAGAR COLONY ROADS ARE NOT FORMED AND RESIDENTS ARE UNABLE TO WALK ON THE UN-LAID ROADS - PRIORITY MAY BE GIVEN TO FORM THESE ROADS AND CONSTRUCTION OF DRAINS - KINDLY CAUSE ENQUIRY AND TAKE NECESSARY ACTION.

THE E.E.(PR), NIZAMABAD HAD REPORTED THAT THE WORK WAS INSPECTED AND FOUND THAT THE WORK IS BEING TAKEN UP BY HOUSING DEPARTMENT. REQUESTED TO OBTAIN DETAILS FROM HOUSING DEPARTMENT.

 

THE DPO HAD REPORTED THAT THE G.P. BHEEMGAL TAKEN THE WORKS IN SRIRAMNAGAR COLONY ON PRIORITY BASIS ON AVAILABILITY OF G.P. FUNDS.

03/08/2009

2783.

RACHAPPA

OLD VARNI (V)

VARNI (M)

IN OLD VARNI VILLAGE OF VARNI MANDAL THE MONKEY MENACE IS INCREASING DAY-BY-DAY - THESE MONKEYS ARE BITING CHILDREN AND OTHERS WHO ARE CARRYING PACKETS IN THEIR HANDS AND ALSO ENTERING INTO THE HOUSES AND SPOILING KITCHEN ITEMS LIKE FOOD GRAINS, UTENSILS AND COOKED FOOD ETC. - KINDLY INSTRUCT THE FOREST OFFICIALS TO LAY TRAPS AND REHABILITATED THEM TO FAR OF FOREST AND PROTECT THE PUBLIC OF OLD VARNI.

 

03/08/2009

2784.

SUDARSHAN

AILAPUR (V)

NANDIPET (M) 

IN OUR VILLAGE UNDER SS-7,  63 KV TRANSFORMER THERE ARE 22 AUTHORISED BORE WELLS WITH MOTORS - DUE TO OVER LOAD THE TRANSFORMER IS FAILING FREQUENTLY AND DUE TO LACK OF POWER SUPPLY WE HAVE NOT TAKEN UP TRANSPLANTATION OF PADDY SO FAR - WE HAVE REQUESTED THE A.E. TO PREPARE ESTIMATES FOR GETTING ANOTHER TRANSFORMER TO AVOID FREQUENT FAILURE BY DISTRIBUTION OF LOAD - BUT THE A.E. IS REFUSING TO DO SO - KINDLY INTERVENE AND INSTRUCT CONCERNED TO ARRANGE ANOTHER TRANSFORMER FOR DISTRIBUTION OF UNINTERRUPTED POWER SUPPLY DURING THE SCHEDULED TIME.

THE S.E.(NPDCL) HAD REPORTED THAT THE SS-7, 63 KV OF AILAPUR OF NANDIPET MANDAL HAD INSPECTED AND FOUND THAT 24 NUMBERS AGRICULTURE SERVICES ARE RUNNING ON THE EXISTING 63 K.V.A. DTR AND OBSERVED IT IS OVER LOADED.. THE ESTIMATES ARE PREPARED BY PROVIDING 3 X 25 KVA DTRs AND SUBMITTED TO CHIEF ENGINEER FOR GETTING THE APPROVAL BY MENTIONING THE ABOVE FACTS.

03/08/2009

2785.

ARE RAVINDER

MENDORA (V)

BHEEMGAL (M)

THE CALLER HAD COMPLAINT ABOUT ENCROACHMENT OF GOVERNMENT LAND TO AN EXTENT OF 20.00 ACRES AND EARLIER HE HAD FILED PETITIONS UNDER PRAJAVANI WITH NO. 12253 AND  DYC NO.2718 BUT SO FAR NO ACTION TAKEN -

 

FOR THIS THE TAHSILDAR, BHEEMGAL HAD FURNISHED REPLY STATING THAT "IN SY.NO. 156 THE SHIKAM LAND IS RECORDED AS 7.01 ACRES. THE MANDAL SURVEYOR HAD SURVEYED THE LAND AND FIXED BOUNDARIES. ENCROACHMENTS HAVE BEEN EVICTED. ONE SRI PEDDA NARSAIAH S/o GANGARAM HAD DRILLED A BORE WELL IN SHIKAM LAND AS BORE WELLS IN HIS PATTA LANDS FAILED. WHEN THE REVENUE INSPECTOR TRY TO REMOVE THIS BORE HE HAD THREATENED TO COMMIT SUICIDE. AT PRESENT EXCEPT THIS BORE WELL THERE IS NO ENCROACHMENT IN THE SHIKAM LAND"

 

MAY BE REFER TO THE R.D.O., NIZAMABAD FOR FURTHER ENQUIRY.

THE R.D.O. HAD FURNISHED COPY OF REPORT SUBMITTED BY THE TAHSILDAR, BHEEMGAL. THE TAHSILDAR HAD REPORTED THAT VENNELA VANI KUNTA IS EXISTING IN SY.NO.156 WITH SHIKAM IN AN EXTENT OF 7.01 ACRES. THE ADJACENT PATTEDARS 1) E.PEDDA NARSAIAH HAD DRILLED A BORE WELL AND INSTALLED MOTOR. 2) UPPULURI POCHANNA DRILLED BORE WELL, INSTALLED MOTOR AND ENCROACHED 0.26 ACRES AND RAISED PADDY CROP. 3) GOUD GANGADHAR DRILLED BORE WELL, INSTALLED MOTOR AND ENCROACHED 0.32 ACRES AND RAISED PADDY CROP. 4) MOGALI LIMBADRI ENCROACHED 0.32 ACRES DID NOT RAISE ANY CROP AND 5) MEKALA GANGADHAR ENCROACHED 0.08 ACRES AND DID NOT RAISE ANY CROP. IN ALL 2.18 ACRES IS ILLEGALLY ENCROACHED BORE WELLS DRILLED, MOTORS INSTALLED AND CROP IS BEING RAISED IN 1.18 ACRES. THE TAHSILDAR HAD REQUESTED PERMISSION UNDER SECTION 7(A) OF LAND ENCROACHMENT ACT 1905 FOR EVICTION OF ENCROACHERS.

03/08/2009

2786.

KALAGUNTLA VITTAL

SADASHIVNAGAR (V&M)

I AM HAVING AGRICULTURE LAND WHICH IS CULTIVATED UNDER BORE WELL - ONE PERSON NAMELY PAPANALA BEERAIAH, G.P. WARD MEMBER HAD DRILLED ANOTHER BORE WELL ADJACENT TO MY BORE WELL WHICH IS AGAINST WALTA ACT - I HAVE PROTESTED AT THE TIME OF DRILLING BUT HE MISUSED HIS OFFICIAL POSITION AND DRILL THE BORE WELL - KINDLY TAKE NECESSARY ACTION UNDER WALTA ACT AND CLOSE THE BORE WELL, AS WATER LEVEL IS DEPLETING IN MY BORE WELL AND MY CROPS ARE LIKELY TO BE DRIED - EARLY ACTION IS REQUESTED. 

THE P.D.(DWMA) HAD REPORTED THAT A REPORT WAS CALLED FOR FROM TAHSILDAR, SADASHIVNAGAR VIDE LR.NO.A1/55/2009, DATED 05.08.2009 AND THE SAME IS AWAITED.

03/08/2009

2787.

BAIRAIAH

REDDYPET (V)

MACHAREDDY (M)

IN OUR VILLAGE CONTINUING EDUCATION CENTRE IS FUNCTIONING UNDER THE CHAIRMANSHIP OF SARPANCH AND THE SARPANCH HAD ALLOTTED A BUILDING FOR THIS PURPOSE - WE HAVE SECURED FURNITURE AND EQUIPMENT AND STORED IN THIS BUILDING - SINCE THREE MONTHS THE V.R.O. HAD OCCUPIED THIS BUILDING FORCIBLY AND KEPT UNDER HIS LOCK AND KEY AND NOT ALLOWING US TO USE THE BUILDING FOR C.E.C. WORK - THE SARPANCH AND SUPERVISOR HAD ALSO SPOKEN TO V.R.O. BUT HE IS REFUSING TO VACATE AND ALLOW US TO FUNCTION FROM THERE - KINDLY INTERVENE AND HAND OVER THE BUILDING TO C.E. CENTRE.

THE D.D.(ADULT EDUCATION) HAD REPORTED THAT ONE ROOM IN P.H.C., REDDYPET WAS ALLOTTED FOR CONDUCT OF CONTINUING EDUCATION CENTRE. AND THUS THE GRIEVANCE IS REDRESSED. 

03/08/2009

2788.

SUMEER AHMED

ARMOOR (V)

ARMOOR (M)

THE E.D. APSMFC HAD CONDUCTED INTERVIEWS TWICE IN ARMOOR MUNICIPAL AREA FOR SANCTION OF LOANS AND BANKERS ALSO GIVEN CONSENT - BUT SO FAR NOT EVEN A SINGLE BENEFICIARY IS SANCTIONED LOAN IN ARMOOR - FURTHER, UNDER SELF EMPLOYMENT SCHEME FOR LOAN OF Rs.1.00 LAKH THE SUBSIDY IS Rs.30,000/- BUT THE E.D. HAD SANCTIONED ONLY Rs.7,500/- DEPRIVING THE POOR MINORITIES - KINDLY INTERVENE AND DO JUSTICE.

THE E.D., APSMFC, HAD REPORTED THAT DURING THE YEAR 2008-09 SEVEN BENEFICIARIES WERE SELECTED OUT OF THEM FARHANA BEGUM HAD COMPLETED FORMALITIES AND AVAILED LOAN FROM S.B.I., ARMOOR. OTHER SIX BENEFICIARIES FAIL TO COMPLETE CORPORATION FORMALITIES.

 

DURING LAST YEAR, SINCE, ENTIRE BUDGET WAS NOT RELEASED THE DIST. COLLECTOR HAD INSTRUCTED IN D.C.C. MEETING HELD ON 21.01.09 TO SANCTION LOANS TO IDENTIFIED MINORITY BENEFICIARIES UNDER SELF EMPLOYMENT PROGRAMME BY SANCTIONING 15% OR Rs.7,500/- WHICH EVER IS LESS AS SUBSIDY.

03/08/2009

2789.

MISS. AHMED SYED

BODHAN (V)

MY HUSBAND IS WORKING IN URDU HIGH SCHOOL, BODHAN AS INCHARGE HEAD MASTER - HIS 8 YEARS, 16 YEARS AND 22 YEARS INCREMENTS ARE NOT SANCTIONED - I HAVE APPROACHED D.E.O. OFFICE SEVERAL TIMES AND WHEN THERE WAS NO RESPONSE I HAVE FILED APPLICATION IN PRAJAVANI - NOW THE D.E.O. CLERK IS STATING THAT THEY WILL SEND A REPLY TO THE PRJAVANI ONLY - KINDLY INTERVENE AND ARRANGE FOR SANCTION OF DUE INCREMENTS.

 

SIMILARLY, MY HUSBAND PAY FIXATION WAS NOT DONE - WE HAVE APPROACHED DIRECTOR AND SECRETARIAT & WITH MUCH DIFFICULTY GOT THE SANCTION OF P.R.C. AND RELEASE OF BUDGET - BUT THE SECTION CLERK OF THE HIGH SCHOOL WILL FULLY FAILED TO PRESENT THE BILLS IN TIME IN MARCH AND GOT THE BUDGET LAPSED - AGAIN WE HAVE APPROACHED & GOT THE BUDGET RELEASED - BUT, HE IS REFUSING TO PREPARE THE BILLS - KINDLY ARRANGE FOR PAYMENT OF ELIGIBLE ARREARS.

 

03/08/2009

2790.

LAXMAN RAO

NIZAMPUR (V)

NAVIPET (M)

THE VILLAGERS AND BENEFICIARIES UNDER INDIRAMMA HOUSING ARE FACING THE FOLLOWING PROBLEMS - 1) IN ELIGIBLE AND INFLUENTIAL BENEFICIARIES ARE SUBMITTING BOGUS BILLS AND GETTING PROMPT PAYMENTS - ELIGIBLE AND POOR BENEFICIARIES ARE FORCED TO PAY Rs.2000/- EACH TO PROCESS THEIR CLAIMS - SO FAR MONEY IS ILLEGALLY COLLECTED FROM 10 BENEFICIARIES - 2) THE SARPANCH IS NEGLECTING CLEANING OF DRAINS PROVIDING DRINKING WATER AND MAINTAINING HYGIENIC CONDITIONS IN THE VILLAGE RESULTING SPREADING OF COMMUNICABLE DECEASES - 3) ILLEGAL GRAVEL QUARRYING IS TAKING PLACE FROM THE VILLAGE - COMPLAINTS TO THE TAHSILDAR DID NOT YIELD ANY RESULT - KINDLY DEPUTE OFFICER FROM DISTRICT AND SEIZE THE PROCLAINER AND VEHICLES - EARLY ACTION IS REQUESTED.

THE G.M.(HOUSING) HAD REPORTED THAT THE DY.E.E.(HOUSING), NIZAMABAD HAD ENQUIRED INTO THE MATTER DURING HIS ENQUIRY IT IS REVILED THAT THE PAYMENT OF BENEFICIARIES IN NIZAMPUR VILLAGE AS PER THE ELIGIBILITY AND STAGE OF HOUSE CONSTRUCTION THE ALLEGATIONS NOT PROVED IT IS FALSE.

 

THE D.P.O. HAD REPORTED THAT THE E.O.PR&RD., NAVIPET HAD ENQUIRED INTO THE MATTER AND REPORTED THAT THERE ARE NO PIPELINE LEAKAGES, THE PIPELINE WAS BLOCKED AT TWO PLACES AND THE SAME WAS CLEANED AND RESTORED. FOUR PUBLIC TAPS ARE NOT HAVING PLATFORMS AND THE SAME WOULD BE COMPLETED WITHIN A WEEK. THE DRAINS ARE BEING CLEANED REGULARLY AND HYGIENIC CONDITIONS ARE BEING MAINTAINED. 

03/08/2009

2791.

SANJEEVLU

RAMPUR KALAN (V)

PITLAM (M)

MY GRAND MOTHER NAMELY  MOTHE RAMAVVA IS HAVING A HOUSE AT MADNOOR - THE E.O. HAD UN-AUTHORISEDLY TRANSFERRED THIS PROPERTY IN THE NAME OF AKULA VEERANNA - ON MY REPRESENTATION THE NAME IS AGAIN CHANGED IN THE NAME OF MOTHE RAMAVVA IN THE YEAR 1998 - SINCE, MOTHE RAMAVVA HAD EXPIRED I BEING GRAND SON APPLIED FOR CHANGE OF OWNERSHIP ON MY NAME, AS I AM PAYING THE PROPERTY TAX - BUT THE E.O. IS REFUSING TO RECORD THE CHANGES - KINDLY ENQUIRE AND DO JUSTICE.

THE D.P.O HAD REPORTED THAT H.NO.1-36, 1-37 AND 1-38 ARE REGISTERED IN THE NAME OF MOTHE RAMAVVA. THE HOUSES WERE TRANSFERRED IN THE NAME OF AAKULA VEERANNA AS PER AN AGREEMENT EXECUTED IN MARATI LANGUAGE. AGGRIEVED BY THIS THE HEIRS OF MOTHE RAMAVVA FILED CASE IN A HON'BLE COURT AT BICHKUNDA. ACTION HAS BEEN TAKEN AGAINST THE PANCHAYAT SECRETARY, G.P., MADNOOR.

03/08/2009

2792.

MUTHYAM

VEMPALLI (V)

BALKONDA (M)

OUR ELECTRICAL LINES WERE DAMAGED UNDER FLOOD FLOW CANAL ON OUR REPRESENTATION THE N.P.D.C.L. AUTHORITIES HAVE ADVISED US TO PURCHASE TRANSFORMER AND POLES AS PRESENTLY THEY DO NOT HAVE FUNDS AND TAKES TIME AND ASSURED TO REIMBURSE THE AMOUNT - ACCORDINGLY WE HAVE PURCHASED THE TRANSFORMER AND 25 POLES AND ARRANGED POWER SUPPLY TO SAVE CROPS - WE HAVE APPROACHED N.P.D.C.L. AUTHORITIES BUT THEY HAVE REFUSED TO REIMBURSE - WE HAVE FILED WRITTEN COMPLAINT ON 21.08.2008 - BUT, SO FAR NO ACTION IS TAKEN - KINDLY ENQUIRE AND DO JUSTICE.

THE SE (NPDCL) HAD REPORTED THAT DUE TO EMERGENCY THE MATERIAL DRAWN FROM THE STORES AND CONTRACTOR NOT AVAILABLE TO CARRY OUT THE WORK ON EMERGENCY BASIS TO SAVE THE STANDING CROPS. FOR THE ABOVE REASONS THE WORK WAS CARRIED BY OUR DEPARTMENT STAFF WITH THE HELP OF CONSUMERS. BUT THERE IS NO AUTHORIZATION GIVE TO ANY PERSONS OR CONTRACTORS FOR EXECUTION OF WORK AND HENCE IT NOT POSSIBLE TO PAY THE LABOUR CHARGES TOWARDS COMPLETED LONG PENDING WORK. AFTER COMPLETION OF WORK THE SECTION OFFICER WAS CLOSED THE WORK UNDER FOR MATERIAL PORTION, WHICH WAS UTILIZED FOR THE WORK.

03/08/2009

2793.

SUDARSHAN

KHANAPUR (V)

NIZAMABAD (M)   

IN OUR VILLAGE THE  POST OF V.R.O. IS VACANT - THE TAHSILDAR HAD MADE INCHARGE ARRANGEMENTS - THE INCHARGE V.R.O. IS NOT REGULARLY ATTENDING THE VILLAGE CAUSING INCONVENIENCE IN OBTAINING PAHANI COPIES, BANK LOANS AND EDUCATIONAL CERTIFICATES FOR STUDENTS - KINDLY POST REGULAR V.R.O. 

THE TAHSILDAR, NIZAMABAD HAD INFORMED THAT THE KHANAPUR V.R.O. GOING ON LONG LEAVE FROM 13/7/2009. THE IN-CHARGE ARRANGEMENT TO GUNDARAM V.R.O. SRI ANAND AT PRESENT THERE IS NO INCONVENIENT TO PUBLIC FOR ISSUE OF CERTIFICATES AND OTHER REVENUE ITEMS.

03/08/2009

2794.

ISHAK

YELLAREDDY (V)

OUR WARD IS NOT GETTING DRINKING WATER SINCE FIVE DAYS - REPRESENTATIONS TO THE SARPANCH DID NOT YIELD ANY RESULT - KINDLY ARRANGE SUPPLY OF WATER THROUGH TANKER IF THE BORE WELL IN THE WARD HAD FAILED/ DRIED UP.

THE S.E.(RWS) HAD INFORMED THAT THE OFFICIALS HAVE VISITED THE VILLAGES AND IDENTIFIED THE LOCATIONS FACING DRINKING WATER PROBLEM AND OBTAINED APPROVAL OF THE DISTRICT COLLECTOR FOR SUPPLYING OF THE DRINKING WATER THROUGH TANKERS.

03/08/2009

2795.

CHANDRAIAH

AILAPUR (V)

NANDIPET (M)

I AM A DISABLED PERSON AND NOT HAVING A HOUSE - I HAVE APPROACH THE HOUSING OFFICIALS WHO ADVISED TO GO AHEAD WITH CONSTRUCTION AND HOUSE WOULD BE SANCTIONED UNDER INDIRAMMA PROGRAMME - I HAVE CONSTRUCTED UPTO ROOF LEVEL BUT SO FAR NO AMOUNT IS PAID AND MATERIAL GIVEN - NOW THEY ARE STATING THAT SANCTION IS NOT RECEIVED - I HAVE BARROWED MONEY AND INVESTED IN THE CONSTRUCTION - KINDLY ARRANGE FOR SANCTION OF HOUSE AND RELEASE/ PAYMENT OF MATERIAL / CASH - EARLY SANCTION IS REQUESTED.

THE G.M.(HOUSING) HAD REPORTED THAT THE DY.E.E. HAD ENQUIRED INTO THE GRIEVANCE AND REPORTED THAT THE CALLER HAD CONSTRUCTED THE HOUSE UPTO ROOF LEVEL AND ELIGIBLE FOR SANCTION OF HOUSE. HE WAS NOT SANCTIONED HOUSE UNDER INDIRAMMA PROGRAMME 2007-08. HE HAD CONSTRUCT THE HOUSE WITHOUT SANCTION FROM THE HOUSING CORPORATION. AT PRESENT THERE IS NO PROVISION TO SANCTION NEW HOUSES AS SOON AS SANCTION IS RECEIVED FROM THE GOVT. FOR NEW HOUSES HIS REQUEST WOULD BE CONSIDERED.

17/08/2009

2796.

LAXMAN

SALOORA (V)

BODHAN (M)

THE FARMERS OF SALOORA VILLAGE WHOSE LANDS ARE BETWEEN HANMAN TEMPLE TO NALLAKUNTA HAVE JOINTLY DECIDED TO FARM A ROAD FROM HANMAN TEMPLE AT THE END OF SALOORA VILLAGE TO NALLA KUNTA FOR THE CONVENIENCE OF AGRICULTURAL OPERATIONS ETC. - IT WAS DECIDED TO COLLECT Rs.500/- FROM EACH FARMER TO MEET THE EXPENDITURE - ACCORDINGLY WE HAVE STARTED THE WORK BY CUTTING TRENCH ON BOTH THE SIDES - SUDDENLY ZPTC ALONG WITH A CONTRACTOR ENTERED THE SCENE AND ASSURED TO COMPLETE THE WORK FROM Z.P./ EGS FUNDS - HE SPREAD GRAVEL TO SOME EXTENT AND LIFTED THE BILL FOR ENTIRE WORK WITHOUT COMPLETE THE WORK - NOW HE IS REFUSING TO COMPLETE THE WORK - THE M.P.D.O. IS NOT FURNISHING THE DETAILS OF WORK AND AMOUNT DRAWN UNDER RTI ACT - KINDLY ENQUIRE AND DO JUSTICE BY COMPLETING THE FORMATION OF ROAD.

THE P.D. (DWMA) HAD REPORTED THAT FARMERS DID FORMATION OF ROAD FROM HANUMAN TEMPLE TO NALLA KUNTA AT SALOORA VILLAGE BY CONTRIBUTING Rs.500/- EACH. THE METAL WORK ON THE SAME ROAD WAS TAKEN UP UNDER NREGS-AP AND Rs.40,187/- WAS PAID TOWARDS MATERIAL SUPPLIER AFTER DUE VERIFICATION BY THE QUALITY CONTROL ENGINEERS OF D.W.M.A. NO PAYMENT WAS MADE TOWARDS THE FORMATION OF WORK DONE BY THE FARMERS.

17/08/2009

2797.

SANTOSH

CH.KONDUR (V)

NANDIPET (M)

SY.NO.78/3 MEASURING 2.29 ACRES STANDING PATTA IN THE NAME OF MY MOTHER SMT. DURGAM LAXMI W/o LAXMINARAYANA - TILL LAST YEAR IN PAHANI AND BHU BHARATHI SURVEY THE LAND IS SHOWN AS 2.29 ACRES - BUT IN CURRENT YEAR PAHANI IT IS MENTIONED AS 2.00 ACRES - I HAVE APPROACHED TAHSILDAR, NANDIPET AND FILED APPLICATION FOR RECTIFICATION - HE HAS EXPRESSED HIS INABILITY TO DO ANY THING IN THIS REGARD - KINDLY ENQUIRE AND DO JUSTICE BY RECORDING 2.29 ACRES IN THE REVENUE RECORDS.

THE TAHSILDAR, NANDIPET HAD REPORTED THAT SMT. LOKAM LAXMI W/o LAXMI NARAYANA HAD PURCHASED THE FOLLOWING LANDS AND OWNERSHIP CHANGED ON HER NAME VIDE FILE NO. ROR/03/04 DATED 29.03.2004. SY.NO.78 UB 0.37, 78/A 1.12, 78/O 0.20 TOTAL 2.29 ACRES. DURING THE YEAR 2006-07 WHILE WRITING PAHANI SY.NO.78/O 0.20 ACRES WAS OMITTED BY OVERSIGHT. NOW, AFTER VERIFICATION OF ENTIRE RECORD THE OMISSION IS RECTIFIED AND PAHANI COPY ALSO HANDED OVER TO THE CALLER. THUS THE GRIEVANCE IS REDRESSED.

17/08/2009

2798.

CHINNA DAS

KISAN NAGAR (V)

BALKONDA (M)

I AM RESIDING IN WARD NO.11 - IN THIS WARD THERE ARE NO STREET LIGHTS THE ROADS ARE WITH LOT OF POT HOLES, DRAINS ARE NOT BEING CLEANED AND NO INSECTICIDE AND BLEACHING POWDER IS SPRINKLED TO CONTROL SPREADING OF COMMUNICABLE DECEASES - REQUEST TO THE WARD MEMBER/ SARPANCH AND SECRETARY DID NOT YIELD ANY RESULT - KINDLY INSTRUCT THE CONCERNED TO ATTEND TO THE ABOVE PROBLEMS.

THE D.P.O HAD REPORTED THAT ON 18.08.2009 THE EXTENSION OFFICER, BALKONDA HAD VISITED WARD NO.11 AND OBSERVED THAT ROADS AND DRAINS WERE NOT CLEANED, STREET LIGHTS NOT FUNCTIONING AND DRINKING WATER TANK NOT CLEANED. HE ADVISED SARPANCH, G.P. SECRE-TARY TO ATTEND THESE WORKS IMMEDIATELY. HE FURTHER STATED THAT IMMEDIATELY AFTER WARD NO.11 AGRICULTURE FIELDS ARE EXISTING AT AN HIGHER LEVEL AND AS SUCH DRAIN WATER IS STAGNATED. THE SARPANCH WAS INSTRU-CTED LAY PIPE LINES FOR FREE FLOW OF DRAIN WATER.

17/08/2009

2799.

SRINIVAS

MANGALPAD (V)

BODHAN (M)

IN OUR VILLAGE A HUT IS ERECTED ADJACENT TO SCHOOL EXCLUSIVELY FOR SUPPLY OF SENDI AND OTHER ALCOHOL - THIS IS CAUSING LOT OF INCONVENIENCE TO THE PUBLIC PARTICULARLY WOMEN IN THE EVENINGS - OUR REPRESENTATION TO THE EXCISE OFFICIALS OF BODHAN DID NOT YIELD ANY RESULT - KINDLY INSTRUCT THE EXCISE OFFICIALS AT DISTRICT HEADQUARTERS TO INSPECT AND REMOVE THIS UNAUTHORISED OUT LET.

THE EXCISE SUPDT., NIZAMABAD HAD REPORTED THAT P&E SUB-INSPECTOR, BODHAN HAD VISITED THE VILLAGE ON 18.08.09 AND FOUND THAT NO ILLEGAL SALE AND CONSUMPTION OF EITHER TODDY OR LIQUOR IS TAKING PLACE IN THIS HUT. THE MATTER WAS ENQUIRED OPENLY IN THE PRESENCE OF VILLAGERS AND THE HUT WAS REMOVED.

17/08/2009

2800.

ASHWAQ AHMED

ARMOOR (V)

ARMOOR (M)

IN ARMOOR STUDENTS OF MUSLIM MINORITY COMMUNITY ARE FACING LOT OF PROBLEMS TO OPEN ACCOUNTS IN BANKS FOR CREDITING OF SCHOLARSHIP AMOUNT SANCTIONED BY THE GOVERNMENT - THE BANKERS ARE BLUNTLY REFUSING TO OPEN THE ACCOUNTS AND ADVISING TO COMPLAINT TO ANY OFFICER - KINDLY SEND MINORITIES WELFARE OFFICER TO DISCUSS WITH THE BANKERS AND SORT OUT THE PROBLEM.

THE E.D., APSMFC, HAD REPORTED THAT THE L.D.M. HAD ISSUED INSTRUCTIONS TO THE MANAGERS OF ALL BANKS IN ARMOOR MANDAL FOR OPENING OF NO FRILL ACCOUNTS FOR MINORITY STUDENTS. BASING ON THIS I HAVE CONVENED A MEETING WITH THE BANK MANAGERS, LOCAL PROMINENT PERSONS IN THE PRESENCE OF CALLER ON 21.08.09 AND SORTED OUT THE PROBLEM. NOW THE MANGERS ARE OPENING ACCOUNTS FOR MINORITY STUDENTS.

17/08/2009

2801.

DEVUJI

KAREPALLY (V)

BHEEMGAL (M)

IN OUR VILLAGE HORTICULTURE PLANTATION IS SANCTIONED TO 15 BENEFICIARIES AND THE PLANTS ARE TWO YEARS OLD - ONE VITTAL AND ANOTHER PERSON IN COLLUSION WITH OFFICIALS OF HORTICULTURE DEPARTMENT DRAWN THE AMOUNT IN THE NAME OF ALL THE BENEFICIARIES TO THE TUNE OF RUPEES LAKHS AND MIS-UTILISED WITHOUT DISBURSING TO THE BENEFICIARIES - COMPLAINT TO THE HORTICULTURE OFFICERS DID NOT YIELD ANY RESULT - KINDLY DEPUTE A SENIOR OFFICER FOR DETAILED ENQUIRY AND TO TAKE NECESSARY ACTION FOR PAYMENT TO ALL THE ELIGIBLE BENEFICIARIES AND SEVERE ACTION AGAINST VITTAL AND HORTICULTURE OFFICERS.

THE A.D. (HORTICULTURE) HAD REPORTED THAT AN AMOUNT OF Rs.1,11,600/- WAS CREDITED TO KAREPALLI VILLAGE C.I.G. ACCOUNT. WHICH IS JOINTLY OPERATED BY SRI BUKYA BUCHAYAIAH AND SRI D.VITTAL. ON VERIFICATION OF SIGNATURES IT APPEARS THAT THE SIGNATURES ARE SUSPICIOUS. SRI D.VITTAL ONE OF THE SIGNATORY DENIED THE ALLEGATIONS OF NON-PAYMENT AND STATED THAT ONLY BUKYA BUCHAIAH IS HANDLING EVERY THING. SRI BUKYA BICHAIAH COULD NOT BE CONTACTED, AS HE IS NOT AVAILABLE IN THE VILLAGE FOR THE LAST ONE WEEK.

07/09/2009

2802.

RAJA GANGU

PERKIT (V)

ARMOOR (M)

I HAVE APPLIED FOR CROP LOAN IN ANDHRA BANK, PERKIT - THE MANAGER IS REFUSING TO SANCTION CROP LOAN THOUGH I HAVE SUBMITTED ALL THE REQUIRED DOCUMENTS - KINDLY ARRANGE FOR SANCTION OF CROP LOAN AT THE EARLIEST.

THE E.D. (SC CORP.) HAD REPORTED THAT THE MANAGER, ANDHRA BANK, PERKIT HAD AGREED TO GIVE CONSENT IN THE NAME OF SMT. RAJA GANGU W/o SATYANANDAM THE CALLER FOR SANCTION THROUGH S.C. CORPORATION.

07/09/2009

2803.

MD. SALEEM

BANSWADA (V)

BANSWADA (M)

IN BANSWADA PROPER AT ANGADI BAZAR MAIN ROAD GOVT. LAND IS BEING ENCROACHED AND ILLEGAL CONSTRUCTIONS ARE GOING ON - OUR REPRESENTATION TO G.P. DID NOT YIELD ANY RESULT - IF A COMMERCIAL COMPLEX IS CONSTRUCTED ON THIS LAND BY G.P. IT WILL GENERATE REVENUE TO THE G.P. FOR A LONG TIME - KINDLY STOP THE ILLEGAL ENCROACHMENT AND CONSTRUCTIONS AND HAND OVER THE PLACE TO THE G.P.

THE D.P.O. HAD REPORTED THAT THE GOVT. LAND WAS ENCROACHED AND A SHED WAS ERECTED EARLIER. AT PRESENT NO FRESH ENCROACHMENT IS OBSERVED ACTION IS BEING TAKEN BY THE G.P. TO REMOVE ENCROACHMENT.

07/09/2009

2804.

ALEEMA BEGUM

BODHAN (V&M)

I SUBMIT THAT MY ELDER SON NAMELY FAROOQ, AGED AROUND 22 YEARS WHO WAS ONLY EARNING MEMBER DIED WHEN ACCIDENTALLY SLIPPED AND FELL INTO VILLAGE TANK IN THE MONTH OF APRIL, 2009 - MY HUSBAND IS A T.B. PATIENT AND BED RIDDEN - I HAVE APPLIED FOR SANCTION OF ASSISTANCE UNDER APATHBANDU SCHEME - THE TAHSILDAR, BODHAN IS NOT FORWARDING MY PROPOSAL TO THE COLLECTOR FOR ACCORDING SANCTION - KINDLY ENQUIRE AND ARRANGE SANCTION OF FINANCIAL ASSISTANCE UNDER APATHBANDU SCHEME AS EARLY AS POSSIBLE.

THE TAHSILDAR, BODHAN HAD REPORTED THAT SHAIK FAROOQ WAS AN AUTO DRIVER AND HE DIED ON 14.04.2009 DUE TO DROWNING IN HALDI VAGU NEAR NAGANPALLI VILLAGE. SRI FAROOQ IS NOT BREAD EARNER. SRI SHAIK SHAMSUDDIN FATHER OF THE DECEASED IS THE BREAD EARNER IN THE FAMILY AND AS SUCH NOT ELIGIBLE UNDER APATHBANDU SCHEME.

07/09/2009

2805.

G.BAPU REDDY

YADARAM (V)

DOMAKONDA (M)

OUR UPPER PRIMARY SCHOOL WAS UPGRADED INTO HIGH SCHOOL 2 YEARS BACK - THE SCHOOL IS HAVING FOUR CLASS ROOMS ONLY - ANOTHER FOUR ADDITIONAL CLASS ROOMS ARE REQUIRED TO ACCOMMODATE ALL THE CLASS  - FURTHER, THERE ARE ONLY FEW TEACHERS TO TEACH ALL THE CLASSES - FURTHER, THERE ARE NO TOILETS AND KITCHEN SHED - GIRLS STUDENTS ARE FACING PROBLEM WITH OUT TOILETS - KINDLY ARRANGE FOR SANCTION OF FOUR ADDITIONAL CLASS ROOMS, TOILETS, KITCHEN SHED AND TEACHERS IMMEDIATELY.

THE P.O. (RVM-SSA) HAD REPORTED THAT ACTION IS INITIATED FOR CONSTRUCTION OF ADDL. CLASS ROOMS AND TOILETS DURING THE YEAR 2009-10.

07/09/2009

2806.

SATYANARAYANA

YELLAREDDY (V&M)

IN YELLAREDDY MANDAL WHITE CARD HOLDERS ARE FACING LOT OF PROBLEMS IN GETTING THEIR ESSENTIAL COMMODITIES - THE PROBLEMS ARE 1) THE DEALERS HAVE FORMED SYNDICATE AND OPENING THE SHOPS FOR LIMITED TIME AND LIMITED DAYS. 2) QUOTA FOR NEW CARD HOLDERS FOR THE MONTH OF JUNE AND JULY WAS ISSUED AND LIFTED BY THE DEALERS BUT NOT DISTRIBUTED TO THE CARD HOLDERS. 3) QUOTA FOR THE MONTH OF AUGUST WAS DISTRIBUTED IN THE LAST WEEK AND THE CARD HOLDERS WHO DOES NOT POSSESS MONEY DID NOT LIFT THE QUOTA AND THE ENTIRE UN-DISBURSED QUOTA DIVERTED TO BLACK MARKET. 4) ENTIRE QUOTA OF RICE, SUGAR AND KEROSENE IS NOT BEING DISTRIBUTED TO THE CARD HOLDERS - I REQUEST TO DEPUTE A SENIOR OFFICER FOR ENQUIRY IN THE PRESENCE OF COMPLAINANT AND VILLAGE ELDERS TO KNOW THE FACTS.

THE D.S.O. HAD REPORTED THAT THE COMPLAINT ON FAIR PRICE SHOP DEALERS RELATE TO THE ENTIRE MANDAL OF YELLAREDDY. THEREFORE, PERMISSION WAS OBTAINED FROM THE COLLECTOR TO ENTRUST THE ENQUIRY TO THE R.D.O., KAMAREDDY. ACCORDINGLY, THE R.D.O. WAS REQUESTED TO ENQUIRE INTO THE MATTER AND SUBMIT REPORT, WHICH IS AWAITED.

07/09/2009

2807.

KRISHNA MURTHY

SADASHIVNAGAR (V&M)

IN SADASHIVNAGAR PROPER MORE THAN 200 PIGS ARE ROAMING IN THE VILLAGE AND CREATING LOT OF PROBLEMS BY DIGGING PITS, SPOILING DRAINAGES AND MAKING THE ENTIRE VILLAGE DIRTY, RESULTING HEALTH PROBLEMS - OUR COMPLAINT TO THE SARPANCH DID NOT YIELD ANY RESULT - KINDLY ARRANGE FOR SHIFTING OF PIGS AWAY FROM VILLAGE NEARER TO FOREST.

THE D.P.O. HAD REPORTED THAT THE OWNER OF PIGS HAD SHIFTED THE PIGS 3 K.Ms. AWAY FROM THE VILLAGE AND AT PRESENT THERE ARE NO PIGS AND THE PROBLEM IS SOLVED.

07/09/2009

2808.

G.MALLA REDDY

MARKAL (V) 

SADASHIVNAGAR (M)

I HAVE PURCHASED LAND FROM PATTEDAR AND GOT IT REGISTERED THROUGH REGI-STRATION DEPARTMENT AND APPLIED FOR CHANGE OF NAME AND ISSUE OF PATTADAR PASS BOOK AND TITLE DEED - THE V.R.O. IS DEMANDING MONEY TO MEET THE EXPENSES AT R.D.O., KAMAREDDY - KINDLY ARRANGE FOR ISSUE OF PPB&TDs AT AN EARLY DATE.

THE R.D.O., KAMAREDDY HAD ENQUIRED INTO THE MATTER AND SUBMITTED REPORT HOLDING V.R.O. SMT. M.JYOHTI AND DEPUTY TAHSILDAR SRI K.RAJANARSU OF SADASHIVNAGAR AS RESPONSIBLE FOR NOT ISSUING PPB&TD AND DEMANDING MONEY IN THE NAME OF TAHSILDAR AND R.D.O. THE REPORT WAS SENT TO THE D.R.O. FOR TAKING FURTHER ACTION. ACTION TO ISSUE PPB&TD IS UNDER PROCESS.

07/09/2009

2809.

ANAND KUMAR

RENJAL (V&M)

IN OUR VILLAGE SOME OF THE PENSIONERS WHO WERE RECEIVING SOCIAL SECURITY PENSIONS HAVE DIED AND PROPOSALS WERE SUBMITTED IN FAVOUR OF ELIGIBLE PERSONS IN THEIR PLACES - BUT SANCTION IS NOT BEING ACCORDED IN FAVOUR OF THE NEW PERSONS BY THE D.R.D.A. OFFICE - KINDLY INTERVENE AND ARRANGE FOR IMMEDIATE SANCTION.

THE P.D.(DRDA) HAD REPORTED THAT THE C.E.O.(SERP), A.P., HYDERABAD HAD INSTRUCTED NOT TO TAKEUP ANY CHANGES OR MODIFICATIONS OF PENSIONERS NAMES AROUSED DUE TO DEATH OR MIGRATION TILL COMPLETION OF DOOR-TO-DOOR PHYSICAL VERIFICATION. HOWEVER, THE M.P.D.O. WERE REQUESTED TO OBTAIN RESOLUTIONS IN DEATH CASES UPTO END OF OCTOBER 2009 FOR CONSIDERING AFTER DOOR-TO-DOOR SURVEY.

07/09/2009

2810.

CHINTALA KISHAN 

THIRMANPALLI (V)

DICHPALLI (M)

THERE IS AN HIGH SCHOOL IN OUR VILLAGE - BUT, THERE ARE ONLY 5 CLASS ROOMS - STUDENTS OF OTHER CLASSES ARE STUDYING IN OPEN AREA AND UNDER SHADE OF TREES - KINDLY ARRANGE FOR SANCTION OF FIVE ADDITIONAL CLASS ROOMS, ONE STAFF ROOM, ONE STORE ROOM, ONE KITCHEN SHED AND TOILET FACILITIES FOR GIRLS AND LADY TEACHERS.

 

VILLAGE GRAVE YARD IS EXISTING JUST OPPOSITE TO SCHOOL AND STUDENTS ARE FEARING WHEN EVER LAST RITES ARE BEING PERFORMED SO KINDLY SANCTION COMPOUND WALL TO THE SCHOOL AND GRAVE YARD - EARLY SANCTION IS REQUESTED.

THE D.E.O. HAD REPORTED THAT THE P.O. (RVM-SSA) WAS REQUESTED TO CONSIDER THE REQUEST TO SANCTION FIVE ADDITIONAL CLASS ROOMS, KITCHEN SHED, TOILETS AND COMPOUND WALL TO Z.P.H.S., THIRMANPALLI

05/10/2009

2811.

AMBAM MARGAIAH

S/O RAMULU 

PENTAKURDU (V)

BODHAN (M

I HAVE APPLIED FOR ALLOTMENT OF HOUSE PLOT DURING INDIRAMMA GRAMA SABHA - BUT SO FAR PLOT IS NOT ALLOTTED AND AS SUCH HOUSE IS NOT SANCTIONED - KINDLY ARRANGE TO ALLOT HOUSE PLOT ON PRIORITY BASIS AS I AM A VERY POOR PERSON.

THE TAHSILDAR, BODHAN HAD INFORMED THAT IN PENTA KURD VILLAGE LAND ACQUISITION FOR HOUSE SITES IS UNDER PROCESS AND AFTER COMPLETION ONE HOUSE SITE PLOT WOULD BE ALLOTTED TO SRI AMBAM MARGAIAH THE CALLER.

05/10/2009

2812.

GAINI RAMULU

S/o LINGAIAH

BODHAN (V&M)

IN PENTA KURD VILLAGE OF BODHAN MANDAL ENHANCED DISABLED PENSIONS ARE NOT BEING PAID - KINDLY ARRANGE FOR IMMEDIATE PAYMENT OF ENHANCED PENSION - DISABLED STUDENTS OF 10TH CLASS ARE NOT BEING SANCTIONED SCHOLARSHIPS - KINDLY ARRANGE FOR SANCTION OF SCHOLARSHIPS - SIMILARLY, TRICYCLES MAY BE SANCTIONED TO THE FOLLOWING DISABLED PERSONS ON PRIORITY BASIS

GAINI RAMULU S/o LINGAIAH, PAPI REDDY S/o BHOOM REDDY, NAGA RAO S/o LAXMAIAH.

THE A.D. (DW) HAD REPORTED THAT SRI JAYA RAM S/o SANGAIAH R/o PENTA KURD IS YET TO BE SANCTIONED DISABLED PENSION. THEREFORE, PAYMENT OF ARREARS OF ENHANCED PENSION DOES NOT ARISE. APPLICATIONS OF A LAXMI D/o BALAIAH, 7TH CLASS AND K.SANTOSH S/o LAXMAN, 10TH CLASS ARE PENDING FOR SANCTION OF SCHOLARSHIP. THE SAME WOULD BE SANCTIONED AS SOON AS BUDGET IS RELEASED. APPLICATIONS FOR SANCTION OF TRICYCLES TO 3 BENEFICIARIES WOULD BE CONSIDERED AS SOON AS TRICYCLES ARE SUPPLIED FROM HEAD OFFICE.

05/10/2009

2813.

SATYANANDAM 

PERKIT (V) 

ARMOOR (M)

I AM HAVING 5.20 ACRES OF LAND AND AVAILING CROP LOAN FROM ANDHRA BANK, PERKIT AND REPAYING REGULARLY - I AM NOT A DEFAULTER - DUE TO LACK OF IRRIGATION FACILITIES I HAVE DRILLED A BORE WELL WHICH IS SUCCESSFUL AND AS SUCH I HAVE APPLIED FOR SANCTION OF SUBMERSIBLE PUMP WITH THE MPDO, ARMOOR - MY APPLICATION WAS FORWARDED TO ANDHRA BANK, PERKIT FOR CONSENT - THE MANAGER IS REFUSING TO GIVE CONSENT - KINDLY INSTRUCT THE MANAGER TO GIVE CONSENT AND SANCTION LOAN FOR PURCHASING AND INSTALLING SUBMERSIBLE PUMP.

THE E.D. (SC CORP.) HAD REPORTED THAT THE MANAGER, ANDHRA BANK, PERKIT HAD AGREED TO GIVE CONSENT IN THE NAME OF SMT. RAJA GANGU W/o SATYANANDAM THE CALLER FOR SANCTION THROUGH S.C. CORPORATION.

05/10/2009

2814.

ASHOK

BINOLA (V)

LINGAMPET (M)

THERE IS ONLY ONE FAIR PRISE SHOP DEALER IN THE VILLAGE - HE HAD COLLECTED MONEY FROM 120 FAMILIES ASSURING THEM TO PROVIDE WITH WHITE RATION CARDS - EVEN AFTER LAPSE OF SIX MONTHS HE HAS NEITHER PROVIDED RATION CARDS NOR REFUNDING THE AMOUNT COLLECTED - THEREFORE A COMPLAINT WAS FILED WITH THE TAHSILDAR, LINGAMPET - RESPONDING TO THE COMPLAINT THE TAHSILDAR HAD CONDUCTED OPEN ENQUIRY IN THE VILLAGE AND THE BENEFICIARIES PRESENT HAVE GIVEN STATEMENT REGARDING COLLECTION OF MONEY BY THE DEALER - EVEN AFTER LAPSE OF 10 DAYS NEITHER CARDS WERE ISSUED, AMOUNT REFUNDED NOR ANY ACTION TAKEN AGAINST THE DEALER FOR ILLEGAL ACTIVITIES - KINDLY INTERVENE AND TAKE SUITABLE ACTION AGAINST THE F.P. SHOP DEALER AND DO JUSTICE TO THE BENEFICIARIES.

THE D.S.O. HAD REPORTED THAT A DETAILED REPORT HAS BEEN CALLED FOR FROM THE R.D.O., KAMAREDDY AND THE SAME IS AWAITED. AS SOON AS THE REPORT IS RECEIVED DETAILED REPORT WOULD BE SUBMITTED.

05/10/2009

2815.

PENTA KURD (V)

BODHAN (M)

MY SON-IN-LAW WHO IS A DISABLED PERSON HAD APPLIED FOR SANCTION OF DISABLED PENSION THROUGH MPDO, BODHAN IN THE MONTH OF MARCH 2009 - THREE MONTHS BACK MPDO HAD SENT MESSAGE INFORMING THAT PENSION WAS SANCTIONED AND TO TAKE THE AMOUNT AT THE G.P. - WHEN WE WENT TO G.P. THE SARPANCH AND UPA-SARPANCH ARE STATING THAT PENSION IS NOT YET SANCTIONED AND TAKES SOME MORE MONTHS - KINDLY VERIFY THE FACT AND INFORM WHETHER PENSION IS SANCTIONED OR NOT, IF SANCTIONED ARRANGE PAYMENT AND NOT SANCTIONED KINDLY ARRANGE TO SANCTION IMMEDIATELY.

THE P.D. (DRDA) HAD REPORTED THAT THE APPLICATION OF THE CALLER WOULD BE CONSIDERED AFTER COMPLETION OF DOOR TO DOOR PHYSICAL VERIFICATION SURVEY AS PER INSTRUCTIONS OF THE GOVT.

05/10/2009

2816.

KALLIGOTLA VITTAL 

SADASHIVNAGAR (V&M)

I AM HAVING AGRICULTURE LAND WHICH IS CULTIVATED UNDER BORE WELL - ONE PERSON NAMELY PAPANALA BEERAIAH, G.P. WARD MEMBER HAD DRILLED ANOTHER BORE WELL ADJACENT TO MY BORE WELL WHICH IS AGAINST WALTA ACT - I HAVE PROTESTED AT THE TIME OF DRILLING BUT HE MISUSED HIS OFFICIAL POSITION AND DRILL THE BORE WELL - KINDLY TAKE NECESSARY ACTION UNDER WALTA ACT AND CLOSE THE BORE WELL, AS WATER LEVEL IS DEPLETING IN MY BORE WELL AND MY CROPS ARE LIKELY TO BE DRIED - EARLY ACTION IS REQUESTED.  ( DYC NO.2786, DATED 03.08.2009)

THE P.D. (DWMA) HAD REPORTED THAT A REPORT HAS BEEN CALLED FOR FROM TAHSILDAR, SADASHIVNAGAR AND THE SAME IS AWAITED.

05/10/2009

2817.

SUSHEELA 

BANSWADA (V&M)

I AM HAVING OWN HOUSE IN LAYOUT PLAN AT NGOs COLONY, BANSWADA - AT THE BACK SIDE OF THE HOUSE THERE WAS AN OPEN PLACE - NOW THIS PLACE TAKEN ON LEASE AND A PRIVATE JUNIOR COLLEGE IS CONSTRUCTED WITHOUT COMPOUND WALL - THE STUDENTS OF THE COLLEGE ARE CAUSING LOT OF INCONVENIENCE AND THROWING WASTE MATERIAL INTO OUR RESIDENTIAL PREMISES - KINDLY INSTRUCT THE MANAGEMENT TO CONSTRUCT COMPOUND WALL TO AVOID INCONVENIENCE.

THE D.P.O. HAD REPORTED THAT THE COMPOUND WALL HAS BEEN CONSTRUCTED UPTO 8 FEET AND MESH IS FIXED TO THE WINDOWS OF 1ST & 2ND FLOOR AND THUS THE PROBLEM OF THE CALLER IS REDRESSED.

05/10/2009

2818.

RACHAPPA

OLD VARNI (V)

VARNI (M)   

SRI NARSAIAH, DEALER OF BHARATH GAS IS OBTAINING APPLICATIONS ALONG WITH PHOTOS AND XEROX COPY OF RATION CARD FOR ISSUE OF NEW CONNECTIONS BUT NOT PASSING ANY RECEIPT - THE APPLICANTS ARE WAITING MONTHS TOGETHER FOR NEW CONNECTION - KINDLY ARRANGE FOR ISSUE OF NEW CONNECTIONS TO ALL THE PENDING CASES TILL DATE TO AVOID INCONVENIENCE TO THE APPLICANTS.

THE D.S.O. HAD REPORTED THAT THE DISTRIBUTOR SRI NARSAIAH OF M/s SAI GAS AGENCY, BPC DEALER, VARNI WAS PRESENT AND PRODUCE THE REGISTER BEING MAINTAINED FOR RELEASE OF NEW CONNECTIONS. THE CONNECTIONS ARE BEING ISSUED AS PER SENIORITY. A NEW CONNECTION WAS ISSUED TO SMT. MADHAVI W/O THE CALLER SRI RACHAPPA VIDE CONNECTION NO.1760 S.V. NO.609415748 ON 22.02.2009. THE NEW CONNECTIONS ARE BEING ISSUED AS PER THE QUOTA RELEASED BY B.P.C.L. THE XEROX COPIES OF RATION CARDS ARE BEING OBTAINED TO DELETE KEROSENE QUOTA AS SOON AS GAS CONNECTION IS GIVEN. THE DEALER WAS DIRECTED TO PASS A RECEIPT AS AND WHEN APPLICATION IS REGISTERED FOR NEW CONNECTION.

05/10/2009

2819.

GOPAL NAIK

BHEEMGAL (V&M)

IN BHEEMGAL PROPER S.T. HOSTEL IS BEING FUNCTIONING IN PVT. BUILDING WITH LACK OF FACILITIES - RECENTLY Rs.40.00 LAKHS WAS SANCTIONED FOR CONSTRUCTION OF NEW BUILDING - THE OFFICIALS HAVE SELECTED LAND BESIDES RIVER BRIDGE AND ADJACENT TO GRAVE YARD WHICH IS NOT SUITABLE FOR HOSTEL PURPOSE - THERE IS VACANT LAND IN SY.NO. 475,476 BELONGING TO G.P. - THIS LAND IS SUITABLE FOR HOSTEL - THE SARPANCH MAY BE INSTRUCTED TO ALLOT THIS LAND - IF THIS IS NOT POSSIBLE THERE IS A SHIKAM LAND WHICH IS ILLEGALLY OCCUPIED AND HOUSES ARE BEING CONSTRUCTED - THE ILLEGAL ENCROACHERS MAY BE EVICTED AND HOSTEL BUILDING TAKEN UP IN THIS PLACE - KINDLY INSPECT ALL THE THREE SITES AND DO JUSTICE TO THE S.T. STUDENTS.

THE D.T.W.O. HAD REPORTED THAT THE VILLAGERS OF HAVE DONATED 1.00 ACRE LAND IN SY.NO.158/1 FREE OF COST. BUT THE S.T. MEMBERS ARE NOT WILLING TO TAKE UP HOSTEL CONSTRUCTION ON THIS LAND ON SOME GROUNDS. THEY HAVE PROPOSED FOR ALLOTMENT OF SHIKAM LAND. THE TAHSILDAR, BHEEMGAL HAD REPORTED THAT SHIKAM LAND CAN NOT BE TRANSFERRED TO TRIBAL WELFARE DEPARTMENT FOR CONSTRUCTION OF HOSTEL BUILDING AND ASSURED TO IDENTIFY ANY OTHER SUITABLE LAND AND ALLOT TO THE D.T.W.O. FOR CONSTRUCTION OF HOSTEL.

05/10/2009

2820.

ASHOK

MAMIDIPALLI (V)

ARMOOR (M)

THERE IS NO DRAINAGE FACILITY IN OUR COLONY AND ALL THE WASTE WATER IS STAGNATED AROUND MY HOUSE AND I AM UNABLE TO MOVE OUT OF THE HOUSE THROUGH THE DRAIN WATER - THE SARPANCH IS A WOMEN AND HER HUSBAND IS RUNNING THE ADMINISTRATION - I HAVE FILED COMPLAINT AND ALSO APPLICATION UNDER RTI ACT BEFORE THE COLLECTOR, JOINT COLLECTOR AND D.P.O. - BUT SO FAR NO ACTION IS TAKEN TO CONSTRUCT THE DRAINAGE - KINDLY INSPECT THE SPOT AND THEN TAKE APPROPRIATE ACTION FOR CONSTRUCTION OF DRAINS, PROVIDING STREET LIGHTS AND APPROACH ROAD TO MY HOUSE.

THE D.P.O. HAD REPORTED THAT THE OWNER OF THE PLOT ADJACENT TO THE CALLERS PLOT HAD DUG TRENCH AROUND THE PLOT RESULTING STAGNATION OF WATER. HE HAD AGREED TO HAND OVER THE PLOT TO G.P. FOR CONSTRUCTING DRAINAGE PROVIDED COST OF THE LAND IS PAID TO HIM. THE G.P. SECRETARY WAS DIRECTED TO SUBMIT NECESSARY PROPOSAL IN THE MATTER. FURTHER, ACTION WOULD BE TAKEN AS PER RULES AFTER RECEIPT OF THE G.P.

19/10/2009

2821.

MEHAMOOD KHAN

NANDIPET (V&M)  

NANDIPET VILLAGE IS MANDAL HEADQUARTERS AND THERE IS NO REGULAR PANCHYAT SECRETARY - PUBLIC ARE FACING LOT OF DIFFICULTY WITH THE INCHARGE SECRETARY WHO RARELY  VISITS THE VILLAGE - KINDLY POST REGULAR P.S. TO MANDAL HEADQUARTERS VILLAGE - IN WARD NO. 10 MOSTLY MUSLIMS RESIDE AND THERE IS NO WATER FACILITY - NEITHER BORE WELL NOR STREET TAPS ARE PROVIDED AND NO ALTERNATE SUPPLY IS ALSO ARRANGED - KINDLY ARRANGE DRINKING WATER.

THE D.P.O. HAD REPORTED THAT OUT OF 74 NOTIFIED GRAMA PANCHAYATS 50% OF THE POSTS I.E. 37 POSTS OF PANCHAYAT SECRETARIES ARE VACANT. COMMISSIONER FOR PANCHAYAT RAJ AND RURAL EMPLOYMENT, HYDERABAD, WOULD FILL THESE VACANCIES ONLY. THEREFORE, IN-CHARGE ARRANGEMENTS ARE MADE TILL COMMISSIONER, PR&RE, ALLOTS SELECTED CANDIDATES. INSTRUCTIONS WERE ISSUE TO THE IN-CHARGE P.S. TO ATTEND IN-CHARGE VILLAGE AT LEAST THREE DAYS IN A WEEK.

 

THERE IS NO WATER PROBLEM IN WARD NO.9 FROM THE WHERE CALLER HAD COMPLAINT. THE PUBLIC TAPS ARE FUNCTIONING PROPERLY AND THERE IS NO DRINKING WATER PROBLEM.

19/10/2009

28222.

REHMAN

KANDEBELLOR (V)

JUKKAL (M)

I ALONG WITH 24 OTHERS ARE WORKING AS LABOUR UNDER N.R.E.G.S. SINCE APRIL 2009 AS PER THE JOB CARDS ISSUED - WE ARE HAVING BANK ACCOUNT - BUT SO FAR OUR WAGES ARE NOT PAID STATING THAT ACCOUNTS ARE NOT OPENED IN THE POST OFFICE - KINDLY ENQUIRE AND ARRANGE FOR IMMEDIATE PAYMENT OF WAGES.

THE P.D. (DWMA) HAD REPORTED THAT SRI REHMAN S/o BASUMIYA R/o KANDEBELLUR IS HOLDING JOB CARD NO. 0344 AND HIS ACCOUNT IS OPENED IN POST OFFICE WITH NO.65655 AND CHEQUES GENERATED AND DEPOSITED IN THE ACCOUNT. IT APPEARS THAT SOME UNKNOWN PERSON HAD COMPLAINED IN D.Y.C. IN THE NAME OF SRI REHMAN.

19/10/2009

2823.

RACHAPPA

OLD VARNI (V)

VARNI (M)

MY WIFE SMT. MADAVI IS A MEMBER IN S.H.G. FOR THE PAST EIGHT MONTHS AND SANCTIONED A HOUSE UNDER INDIRAMMA HOUSING PROGRAMME - THE HOUSE IS COMPLETED BUT SO FAR BRIDGE LOAN IS NOT SANCTIONED - KINDLY ARRANGE FOR SANCTION OF BRIDGE LOAN.

THE P.D. (DRDA) HAD REPORTED THAT SMT. MADAVI W/o RACHAPPA THE CALLER R/o OLD VARNI IS A MEMBER IN SELF HELP GROUP FOR THE PAST THREE MONTHS ONLY. SHE IS NOT ELIGIBLE FOR INDIRAMMA BRIDGE LOAN AND AS WELL AS HOUSE UNDER INDIRAMMA HOUSING SCHEME. SHE DID NOT CONSTRUCT A HOUSE.

19/10/2009

2824.

BADDAM ANJI REDDY

MUTHYAMPET (V)

DOMAKONDA (M)

MY ANCESTRAL PROPERTY IS NOT BEING TRANSFERRED ON MY NAME AND P.P.B & T.D. IS NOT BEING ISSUED BY THE M.R.O. ON THE GROUND THAT THE LAND IS SOLD ON SOME PLAIN PAPER TRANSACTION - ALL THESE ARE BOGUS TRANSACTIONS - MY APPLICATION IS PENDING WITH THE M.R.Os OFFICE. FOR THE PAST SIX YEARS - SINCE M.R.O. IS NOT IN A POSITION TO SOLVE THE PROBLEM I REQUEST TO DEPUTE R.D.O., KAMAREDDY OR ANY OTHER OFFICER FROM DISTRICT TO SOLVE THE LONG PENDING CASE.

THE R.D.O., KAMAREDDY HAD REPORTED THAT SRI BADDAM RAJI REDDY S/o BAL REDDY R/o MUTHYAMPET VILLAGE OF DOMAKONDA MANDAL WAS PATTEDAR OF SY.NO.192, 295, 368, 519, 598, 635, 33/A, 84, 174, 178, 179 AND 189 SITUATED AT MUTHYAMPET VILLAGE OF DOMAKONDA MANDAL AND ALSO SY.NO. 95, 76, 92, 128, 129 AND 34 IN CHINTAMANPALLI VILLAGE OF DOMAKONDA MANDAL.

 

DURING THE LIFE TIME OF BADDAM RAJIREDDY S/o BALREDDY PATTEDAR HAD SOLD THE LANDS AT MUTHYAMPET VILLAGE AND THE LANDS AT CHINTAMANPALLI WERE WITH PATTEDAR. AFTER THE DEATH OF PATTEDAR THE LANDS SITUATED AT CHINTAMANPALLI VILLAGE WERE TRANSFERRED IN THE NAME OF THREE SONS NAMELY BADDAM ANJI REDDY, MADHUSUDHAN REDDY AND NARSAREDDY.

 

THE PATTEDAR DURING LIFE TIME HAD SOLD THE LANDS ON SIMPLE SALE DEED AND PURCHASERS ARE IN PHYSICAL POSSESSION. THEREFORE, THE TAHSILDAR HAD NOT ISSUED P.P.B. FOR THE LANDS SOLD BY LATE FATHER OF THE CALLER, WHICH ARE IN PHYSICAL POSSESSION OF THE PATTEDAR.

 

THE CALLER CLAIMS THAT THE SALES WERE IRREGULAR AND DEMANDING FOR ISSUE OF P.P.B. FOR THE LANDS SOLD BY HIS LATE FATHER. THE CALLER WAS DIRECTED TO APPROACH CIVIL COURT IF HE HAS GOT ANY DISPUTE OVER THE SALES AND TITLE OF THE LAND.

19/10/2009

2825.

IBRAHIM

VEERANNA GUTTA (V)

RENJAL (M)

THERE IS AN URDU HIGH SCHOOL IN OUR VILLAGE BUT ALL THE REGULAR TEACHERS WERE TRANSFERRED DURING COUNSELLING AND NOW ONLY TWO VIDYA VOLUNTEERS ARE WORKING - IN ADJACENT HIGH SCHOOL AT RENJAL THERE ARE TWO TEACHERS FOR EACH SUBJECT - KINDLY DEPUTE ONE TEACHER TO OUR SCHOOL SO THAT STUDENTS MAY NOT SUFFER. 

THE D.E.O. HAD ADDRESSED A LETTER TO THE DEPUTY D.E.O., BODHAN ON 31.10.2009 TO LOOK INTO THE MATTER AND TAKE ACTION SO THAT STUDENTS ARE MAY NOT SUFFERED. ACTION TAKEN REPORT IS AWAITED.

19/10/2009

2826.

SATYANARAYANA

AMDAPUR (V)

BODHAN (M)

AMDAPUR IS A MAJOR G.P. AND THERE IS NO REGULAR PANCHAYAT SECRETARY - ADDL. CHARGE ARRANGEMENTS ARE MADE WITH INSTRUCTIONS TO VISIT THE VILLAGE TWO DAYS IN THE WEEK - BUT INCHARGE P.S.G.P. IS NOT VISITING THE VILLAGE ON HEALTH GROUNDS - PUBLIC ARE FACING LOT OF PROBLEMS FOR WANT OF SECRETARY - KINDLY POST REGULAR SECRETARY AND SOLVE THE PROBLEM.

THE D.P.O. HAD REPORTED THAT OUT OF 74 NOTIFIED GRAMA PANCHAYATS 50% OF THE POSTS I.E. 37 POSTS OF PANCHAYAT SECRETARIES ARE VACANT. COMMISSIONER FOR PANCHAYAT RAJ AND RURAL EMPLOYMENT, HYDERABAD, WOULD FILL THESE VACANCIES ONLY. THEREFORE, IN-CHARGE ARRANGEMENTS ARE MADE TILL COMMISSIONER, PR&RE, ALLOTS SELECTED CANDIDATES. INSTRUCTIONS WERE ISSUE TO THE IN-CHARGE P.S. TO ATTEND IN-CHARGE VILLAGE AT LEAST THREE DAYS IN A WEEK.

19/10/2009

2827.

VENKAT

AILAPUR (V)

NANDIPET (M)

ONE SRI YELETI RAMULU HAD ATTACKED MY SISTER AND BEATEN HER - I HAVE FILED COMPLAINT 20 DAYS BACK WITH THE S.I. BUT SO FAR F.R.I. IS NOT REGISTERED AND ACTION TAKEN - THE ACCUSED IS FREELY ROAMING IN THE VILLAGE AND THREATENING TO KILL US - KINDLY ISSUE INSTRUCTIONS TO ISSUE F.I.R. AND ARREST THE ACCUSED.

THE A.S.I., NANDIPET HAD INFORMED ON PHONE THAT F.I.R. IN CRIME NO126/09 WAS BOOKED ON 30.09.2009. THE ACCUSED WAS ARRESTED ON 26.10.2009 AND PRODUCED BEFORE HON'LE COURT AT ARMOOR IN C.C.NO.370/09 AND REMANDED TO JUDICIAL CUSTODY AND LODGED IN SUB-JAIL, ARMOOR.

02/11/2009

2828.

GAYASUDDIN, ZPTC

YELLAREDDY (V&M)

IN YELLAREDDY MANDAL WORKS UNDER N.R.E.G.S. ARE STOPPED ON PRETEXT THAT HARVESTING OF PADDY IS GOING ON - AT PRESENT HARVESTING OF PADDY IS TAKING PLACE ONLY IN RUDRARAM VILLAGE AND JOB SEEKERS ARE LOOKING FOR JOB IN ALL THE REMAINING VILLAGES - KINDLY START WORKS UNDER N.R.E.G.S.  IN ALL THE VILLAGES WHERE HARVESTING OF PADDY IS OVER IMMEDIATELY.

 

TO SOLVE DRINKING WATER PROBLEM AS PER THE INSTRUCTIONS OF COLLECTOR TWO BORE WELLS WERE DRILLED AND THEY ARE SUCCESSFUL - BUT SO FAR MOTOR AND PIPELINE ARE NOT INSTALLED - KINDLY INSTRUCT THE R.W.S. AUTHORITIES TO ATTEND THIS WORK IMMEDIATELY TO SOLVE THE DRINKING WATER PROBLEM.

THE P.D. (DWMA) HAD REPORTED THAT THE LABOUR ARE ENGAGED IN AGRICULTURAL OPERATIONS AND AS SUCH WORKS UNDER N.R.E.G.S. WERE SLOW DOWN TEMPORARILY AND AS PER THE REQUEST OF THE PUBLIC REPRESENTATIVES AND FARMERS THE WORKS UNDER N.R.E.G.S. WOULD BE  IN FULL SWING FROM 16.11.2009 ONWARDS.

 

THE S.E. (RWS) HAD REPORTED THAT PROPOSALS WERE SUBMITTED FOR ACCORDING ADMINISTRATIVE SANCTION FOR Rs.3.00 LAKHS TOWARDS PROCUREMENT OF PUMP SETS AND PIPE LINES. AS SOON AS SANCTION IS RECEIVED THE TWO BORE WELLS WOULD BE COMMISSIONED.

02/11/2009

2829.

SUDARSHAN

AILAPUR (V)

NANDIPET (M)

IN AILAPUR VILLAGE HOUSES SANCTIONED UNDER INDIRAMM HOUSING PROGRAMME PHASE-II ARE COMPLETED IN ALL ASPECTS AND THE BENEFICIARIES ARE RESIDING IN THIS COLONY - THIS COLONY IS EXISTING ADJACENT TO PRESENT ABADI - BUT THE HOUSING AUTHORITIES HAVE FAILED TO LAY THE ROADS AND PROVIDE ELECTRICITY BY NOT PAYING CHARGES TO THE N.P.D.C.L. - DUE TO LACK OF ROADS AND CURRENT BENEFICIARIES ARE FACING LOT OF PROBLEMS - KINDLY INSTRUCT THE P.D. (HOUSING) TO COMPLETE THE ROADS AND ARRANGE POWER SUPPLY ON PRIORITY BASIS.

THE P.D. (HOUSING) HAD REPORTED THAT TECHNICAL SANCTION FOR LAYING INTERNAL ROADS WITH AN ESTIMATED COST OF Rs.4.00 LAKHS IS RECEIVED FROM HEAD OFFICE RECENTLY AND E.E. (HOUSING) ARMOOR WAS INSTRUCTED TO COMMENCE THE WORK IMMEDIATELY.

 

THE S.E. TRANSCO WAS ADDRESSED TO FURNISH THE ESTIMATES FOR OBTAINING FUNDS FROM HEAD OFFICE. THE ESTIMATES ARE STILL AWAITED FROM S.E. (NPDCL). FURTHER ACTION WOULD BE TAKEN ON RECEIPT OF ESTIMATES. 

02/11/2009

2830.

RAJANNA

PALDA (V)

NIZAMABAD (M)

I AM HAVING AGRICULTURE SERVICE NO.138 UNDER S.S.-8 TRANSFORMER AT PALDA VILLAGE - I HAVE RAISED CROP IN TWO ACRES UNDER BORE WELL - BUT THE TRANSFORMER FAILED FREQUENTLY AND POWER SUPPLY NOT RESTORED IMMEDIATELY RESULTING WITHERING OF CROP IN MY TWO ACRES OF LAND AND I AM PUT TO HEAVY LOSS ON ACCOUNT OF FAILURE OF POWER SUPPLY BY N.P.D.C.L. - MY EARLIER REQUEST IN D.Y.C. DID NOT YIELD ANY RESULT - KINDLY DEPUTE N.P.D.C.L. AND AGRICULTURE OFFICERS TO ENSURE POWER SUPPLY AND ASSESS CROP DAMAGE AND SANCTION COMPENSATION FOR THE LOSS.

 

02/11/2009

2831.

SRINIVAS

KOPPERGA (V)

BODHAN (M)

MY UNCLE NAMELY SRI YADAIAH HAD AVAILED MICHORYZA UNDER SUBSIDY UNDER ATMA DURING LAST YEAR AND IT HAS YIELDED GOOD RESULT - SIMILARLY, WE HAVE PURCHASED BIO-GROWTH IN OPEN MARKET AND IT ALSO GIVEN GOOD RESULT - DURING THIS SEASON THEY HAVE NOT SUPPLIED SO FAR ON SUBSIDY - KINDLY INFORM WHETHER THEY WOULD BE SUPPLIED UNDER SUBSIDY THIS YEAR ALSO ARE NOT - KINDLY INFORM WHOM TO CONTACT.

THE J.D.A. HAD REPORTED THAT INDENTS WERE PLACED WITH SUPPLYING AGENCIES FOR SUPPLY OF MICHORYZA AND SUPPLIES ALREADY STARTED AND POSITIONED AT MANDAL HEAD QUARTERS. DURING THIS WEEK ENTIRE REQUIREMENT OF MICHORYZA WOULD BE STATIONED AT ALL THE SUPPLYING POINTS. SIMILARLY BIO-FERTILISER WAS SUPPLIED DURING POLAMBADI PROGRAMME AND IF ANY FURTHER QUANTITY IS REQUIRED BY THE FARMERS THEY CAN OBTAIN THE SAME DURING SAID PROGRMME. INDENTS ARE PLACED FOR SUPPLY OF BIO-GROWTH WITH THE COMPANIES AND WOULD BE MADE AVAILABLE FOR THE CONVENIENCE OF FARMERS AS SOON AS STOCKS ARE RECEIVED.

02/11/2009

2832.

RAMULU

PENTA KURD (V)

BODHAN (M)

IN OUR VILLAGE THERE IS A Z.P. HIGH SCHOOL AND GOVT. HAVE PROVIDED COMPUTERS OTHER VALUABLE ITEMS - THE POST OF NIGHT WATCHMEN IS VACANT FOR THE PAST TWO YEARS - SOME MISCREANTS ARE TRYING TO DAMAGE DOORS, WINDOW PANES DURING NIGHT TIMES - KINDLY ARRANGE FILLING UP OF NIGHT WATCHMEN POST IMMEDIATELY.

 

02/11/2009

2833.

LAMBADA CHANDER

PERMALLA THANDA (V), LINGAMPET (M)

I AM PATTEDAR OF SY.NO. 331/11 AND HOLDING P.P.B. AND T.D. - ANOTHER PERSONS HAD CREATED BOGUS DOCUMENTS AND GOT THE LAND TRANSFERRED ON HIS NAME AND OBTAINED P.P.B.&T.D. - I HAVE FILED THE COMPLAINT BEFORE THE TAHSILDAR, LINGAMPET FOR CANCELLING THE BOGUS CHANGE MADE IN REVENUE RECORDS - BUT THERE IS NO RESPONSE FROM THE TAHSILDAR - KINDLY SUMMON THE ENTIRE ORIGINAL RECORD AND DO JUSTICE TO ME AND ALSO TAKE ACTION AGAINST THE CONCERNED FOR DOING THIS ILLEGAL ACTIVITY.

THE TAHSILDAR, LINGAMPET HAD REPORTED THAT LAND TO AN EXTENT OF 2.00 ACRES IN SY.NO.331/11 IS STANDING PATTA IN THE NAME OF M.RAMCHANDER S/o KAPURIYA AND THERE IS NO RECORD TO SHOW THAT P.P.B. & T.D. WERE ISSUED ON OTHERS NAME. AS PER REVENUE RECORDS THERE IS NO DISPUTE ON OWNERSHIP OF THIS LAND.

02/11/2009

2834.

ASHOK

PALDA (V)

NIZAMABAD (M)

SRI VENKATESHWARLOO IS PANCHAYAT SECRETARY FOR TIRMANPALLI VILLAGE AND HOLDING ADDITIONAL CHARGE OF THE POST OF P.S.G.P., PALDA VILLAGE - HE IS NOT AT ALL VISITING OUR VILLAGE AND WHEN APPROACH HIM FOR GETTING OUR WORKS DONE HE IS NOT PAYING ANY ATTENTION AND ATTENDING THE WORKS - KINDLY ARRANGE TO VISIT PALDA VILLAGE AT LEAST THREE DAYS IN WEEK OR ELSE POST A NEW P.S.G.P. TO OUR VILLAGE ON PRIORITY BASIS.

THE D.P.O. HAD REPORTED THAT SRI VENKATESHWARLOO, P.S.G.P., TIRMANPALLI IS HOLDING ADDITIONAL CHARGE OF G.P., KONDUR AND PALDA. DUE TO SHORTAGE OF P.S.G.Ps. EACH PANCHAYAT SECRETARY IS HOLDING 2 TO 4 G.Ps. AS ADDITIONAL CHARGE. HOWEVER, INSTRUCTIONS WERE ISSUED TO ALL THE PANCHAYAT SECRETARIES TO DISPLAY ON NOTICE BOARD THE DAYS OF THEIR VISIT TO THE ADDITIONAL CHARGE G.Ps. THAT PUBLIC COULD ATTEND ON THAT SPECIFIED DATE/S TO GET THEIR WORKS DONE.

02/11/2009

2835.

KANDI MALLAIAH

RUDRUR (V)

VARNI (M)

MY SON HAD DIED IN A BUS ACCIDENT TWO, THREE MONTHS BACK AND WE HAVE FILED NECESSARY PAPERS TO THE TAHSILDAR THROUGH THE V.R.O. FOR FINANCIAL ASSISTANCE UNDER APATHBANDU SCHEME AS HE WAS BREAD EARNER IN THE FAMILY - WE ARE VERY OLD AND WITHOUT ANY LAND OR HOUSE AND ARE STARVING - KINDLY ARRANGE FOR IMMEDIATE SANCTION OF FINANCIAL ASSISTANCE FOR OUR SURVIVAL.

THE D.R.O. HAD REPORTED THAT PROPOSAL FOR SANCTION OF RELEASE UNDER APATHBANDU SCHEME TO SMT. KANNE JYOTHY WAS ALREADY SENT TO M/s STAR HEALTH AND ALLIED INSURANCE CORPORATION LTD., A.P. HYDERABAD VIDE LR.No.D4/505/09, DATED 13TH OCTOBER 2009 SANCTION IS AWAITED.

02/11/2009

2836.

VENKATESHWARLOO

KAMAREDDY (V)

KAMAREDDY (M)

I AM RESIDING IN ASHOK NAGAR COLONY IN WARD NO.32 OF KAMAREDDY MUNICIPALITY - IN MUNICIPAL AREA DRINKING WATER PIPE LINES ARE BEING LAID BUT SO FAR NO PIPE LINE IS LAID TO ASHOK NAGAR COLONY WHERE AROUND 30 FAMILIES ARE RESIDING - HOWEVER, PIPELINES ARE BEING LAID TO NEW LAY OUT AREAS TO BENEFIT THE REAL ESTATE BUSINESS PEOPLE - OUR EARLIER REQUEST IN D.Y.C. TO PROVIDE PIPELINE AND STREET LIGHTS DID NOT YIELD ANY RESULT - KINDLY INTERVENE, ARRANGE FOR SPOT INSPECTION AND DO JUSTICE.

THE COMMISSIONER, M.C., KAMAREDDY HAD INFORMED THAT THE EXISTING TWO BORE WELLS IN WARD NO.32, ASHOK NAGAR WERE REPAIRED AND WATER SUPPLY RESTORE. WATER IS ALSO BEING SUPPLIED THROUGH TANKERS. NEW PIPE LINE UNDER UIDSSMT CENTRAL PROGRAMME IS IN PROGRESS AND NEW PIPE LINE WOULD ALSO BE LAID TO THIS COLONY AS PER SCHEDULE. AT PRESENT THERE IS NO DRINKING WATER PROBLEM IN WARD NO.32.

02/11/2009

2837.

NAGABUSHANAM

NANDIPET (V)

NANDIPET (M)

IN OUR VILLAGE WE HAVE RAISED IRRIGATED DRY CROPS (SIX WETTING CROPS) AS PER THE INSTRUCTIONS OF THE GOVERNMENT - FOR THIS PURPOSE AGRICULTURE DEPARTMENT IS SUPPLYING P.V.C. PIPES - THE SUPPLY OF PIPES IS LIMITED, SO KINDLY REQUEST TO SANCTION MORE P.V.C. PIPES FOR THIS PURPOSE.

 

SIMILARLY, UNDER ATMA MICHORYZA ETC. WERE SUPPLIED FREE OF COST ON TRIAL BASIS - THIS IS YIELDING GOOD RESULT - KINDLY ARRANGE TO SUPPLY MICHORYZA AND OTHER BIO-FERTILIZER ON 90% SUBSIDY FOR THE WELFARE OF THE FARMING COMMUNITY.

THE J.D.A. HAD REPORTED THAT INDENT WAS PLACED WITH THE COMMISSIONER AND DIRECTOR, AGRICULTURE, AP HYDERABAD TO SUPPLY ADDITIONAL 1000 UNITS OF PVC PIPES TO MEET THE DEMAND OF THE FARMERS. AS SOON AS ADDITIONAL SUPPLIES ARE RECEIVED THEY WOULD BE SUPPLIED TO THE NEEDY FARMERS.

 

FURTHER, REPORTED THAT INDENTS WERE PLACED WITH SUPPLYING AGENCIES FOR SUPPLY OF MICHORYZA AND SUPPLIES ALREADY STARTED AND POSITIONED AT MANDAL HEAD QUARTERS. DURING THIS WEEK ENTIRE REQUIREMENT OF MICHORYZA WOULD BE STATIONED AT ALL THE SUPPLYING POINTS. SIMILARLY BIO-FERTILISER WAS SUPPLIED DURING POLAMBADI PROGRAMME AND IF ANY FURTHER QUANTITY IS REQUIRED BY THE FARMERS THEY CAN OBTAIN THE SAME DURING SAID PROGRMME. INDENTS ARE PLACED FOR SUPPLY OF BIO-GROWTH WITH THE COMPANIES AND WOULD BE MADE AVAILABLE FOR THE CONVENIENCE OF FARMERS AS SOON AS STOCKS ARE RECEIVED.

02/11/2009

2838.

SRINIVAS REDDY

ADAVILINGAL (V)

YELLAREDDY (M)

DURING LAST KARIF WE HAVE RAISED FINE VARITY OF PADDY WITH OUT USING CHEMICAL FERTILIZER BUT BY USING MICHORYZA AND BIO-FERTILIZER - THE YIELD IS ON PAR WITH CROPS RAISED USING FERTILIZER - NABARD OFFICIALS VISITED OUR FIELDS APPRECIATED OUR EFFORT AND INSTRUCTED TO USE THE YIELD FOR SEED PURPOSE ONLY TO PROPAGATE AMONG OTHER FARMERS - KINDLY ARRANGE SUPPLY OF MICHORYZA AND OTHER BIO-FERTILIZER ON SUBSIDY IN LARGE QUANTITIES TO DISPENSE WITH USAGE OF CHEMICAL FERTILIZER.

THE J.D.A. HAD REPORTED THAT INDENTS WERE PLACED WITH SUPPLYING AGENCIES FOR SUPPLY OF MICHORYZA AND SUPPLIES ALREADY STARTED AND POSITIONED AT MANDAL HEAD QUARTERS. DURING THIS WEEK ENTIRE REQUIREMENT OF MICHORYZA WOULD BE STATIONED AT ALL THE SUPPLYING POINTS. SIMILARLY BIO-FERTILISER WAS SUPPLIED DURING POLAMBADI PROGRAMME AND IF ANY FURTHER QUANTITY IS REQUIRED BY THE FARMERS THEY CAN OBTAIN THE SAME DURING SAID PROGRMME. INDENTS ARE PLACED FOR SUPPLY OF BIO-GROWTH WITH THE COMPANIES AND WOULD BE MADE AVAILABLE FOR THE CONVENIENCE OF FARMERS AS SOON AS STOCKS ARE RECEIVED.

02/11/2009

2839.

ANAND KUMAR

RENJAL (V)

RENJAL (M)

IN OUR VILLAGE 35 PENSIONERS HAVE DIED AND IN THEIR PLACE FRESH PROPOSALS WERE SUBMITTED FOR 35 MEMBERS SOME THREE MONTHS BACK - SO FAR SANCTION IS NOT RECEIVED - MY MOTHER IS SARPANCH AND THESE BENEFICIARIES ARE DAILY VISITING OUR HOUSE AND CAUSING TROUBLE - KINDLY INTERVENE AND ARRANGE FOR IMMEDIATE SANCTION OF PENSIONS IN FAVOUR OF NEW BENEFICIARIES.

THE P.D. (DRDA) HAD INFORMED THAT THE PROPOSALS FOR SANCTION OF PENSIONS TO 35 NEW PENSIONERS IN LIEU OF 35 PENSIONERS ALREADY DIED FROM THIS VILLAGE WERE ACCEPTED AND SANCTIONED. PENSIONS WOULD BE DISBURSED FROM DECEMBER 2009 ONWARDS.

16/11/2009

2840.

MAHENDER KUMAR

BANJEPALLI (V)

NIZAMSAGAR (M)

THERE IS AN AGE OLD OPEN WELL OF G.P. WHICH IS SUPPLYING DRINKING WATER FOR 10 MONTHS IN A YEAR TO THE HOUSE HOLDS AROUND IT - THIS OPEN WELL IS BEING ILLEGALLY CLOSED BY FILLING WITH GRAVEL FOR TAKING UP UNAUTHORISED CONSTRUCTION BY INFLUENTIAL PEOPLE - I HAVE SUBMITTED OBJECTION PETITION AND REQUESTED TO FURNISH DETAILS OF OWNERSHIP AND PERMISSION GRANTED BY G.P. UNDER R.T.I. ACT 2005 - BUT THE G.P.P.S. IS NOT RESPONDING TO GIVE THE INFORMATION AND STOP THE WORK - KINDLY ENQUIRE INTO THE MATTER AND DO JUSTICE.

THE D.P.O. HAD REPORTED THAT THE OPEN WELL WAS CLOSED AND THE G.P. SECRETARY HAD ACCORDED PERMISSION ON 26.06.2009 TO CONSTRUCT A BATH ROOM AND TOILET. ON COMPLAINT FROM MAHENDER KUMAR, THE CONSTRUCTION WORK IS STOPPED. NOW A PROPOSAL IS SUBMITTED TO REMOVE THE GRAVEL FROM THE CLOSED WELL UNDER E.G.S. ONE SRI VINAY KUMAR HAD FILED A PETITION UNDER R.T.I. ACT TO FURNISH CERTAIN INFORMATION 0N 19.11.2009 AND THE REQUIRED INFORMATION WOULD BE FURNISHED SHORTLY.

16/11/2009

2841.

BAIRAIAH

REDDYPET (V)

MACHAREDDY (M)

I WAS SANCTIONED LOAN FOR ESTABLISHMENT OF HOTEL UNDER RAJIV YUVA SHAKTHI PROGRAMME AS PER THE CONSENT GIVEN BY S.B.H., REDDYPET 2 MONTHS BACK - BUT THE MANAGER IS NOT SANCTIONING THE LOAN STATING THAT SANCTION FROM HEAD OFFICE AT NIZAMABAD IS STILL AWAITED AND AS SOON AS THE AMOUNT IS TRANSFERRED TO HIS BRANCH HE WOULD GROUND THE SCHEME - KINDLY ARRANGE FOR TRANSFER OF AMOUNT FROM NIZAMABAD HEAD OFFICE TO MACHAREDDY BRANCH FOR GROUNDING OF SCHEME WHICH WOULD PROVIDE SELF EMPLOYMENT TO AN UN-EMPLOYED YOUTH - EARLY ACTION IS REQUESTED.

THE C.E.O. (STEP) HAD REPORTED THAT THE CALLER WAS SANCTIONED TO RUN A HOTEL UNDER RAJIV YUVA SHAKTHI PROGRAMME FOR THE YEAR 2009-10 WITH BANK CONSENT OF S.B.H., REDDYPET. THE S.T.E.P. OFFICE DID NOT RECEIVE ANY BUDGET FOR THE YEAR 2009-10. AS SOON AS BUDGET IS RELEASED HIS SCHEME WOULD BE GROUNDED.

16/11/2009

2842.

AHMED KHAN

NANDIPET (V&M)

EARLIER D.Y.C. IDNO 2821, DATED 19.10.2009 - THE POST OF G.P.P.S. IS VACANT AND ONE SRI RAGHURAM OF MANIKBANDAR VILLAGE IS KEPT INCHARGE - ON OUR EARLIER COMPLAINT DATED 19.10.2009 THE D.P.O. ASSURED THAT THE INCHARGE G.P.P.S. WOULD VISIT NANDIPET WHICH IS MANDAL HEADQUARTERS ATLEAST 3 DAYS IN A WEEK - BUT THE INCHARGE G.P.P.S. NOT AT ALL COMING TO NANDIPET CAUSING UNDUE HARDSHIP TO THE RESIDENTS OF NANDIPET - KINDLY POST A REGULAR G.P.P.S. OR GIVE SPECIFIC DAYS ON WHICH HE WOULD VISIT NANDIPET TO GET OUR WORKS DONE - EARLY ACTION IS REQUESTED.

THE D.P.O. HAD REPORTED THAT OUT OF 74 NOTIFIED GRAMA PANCHAYATS 50% OF THE POSTS I.E. 37 POSTS OF PANCHAYAT SECRETARIES ARE VACANT. COMMISSIONER FOR PANCHAYAT RAJ AND RURAL EMPLOYMENT, HYDERABAD, WOULD FILL THESE VACANCIES ONLY. THEREFORE, IN-CHARGE ARRANGEMENTS ARE MADE TILL COMMISSIONER, PR&RE, ALLOTS SELECTED CANDIDATES. INSTRUCTIONS WERE ISSUE TO THE IN-CHARGE P.S. TO ATTEND IN-CHARGE VILLAGE AT LEAST THREE DAYS IN A WEEK.

16/11/2009

2843.

RAMA KRISHNA

AMDAPUR (V)

BODHAN (M)

MY MOTHER NAMELY LAXMI BAI, AGED 68 YEARS IS DWCRA GROUP MEMBER, OLD AGED AND ALSO WIDOW - SHE IS ELIGIBLE FOR ASSISTANCE UNDER ABAYAHASTAM PROGRAMME - SHE HAS DEPOSITED THE REQUIRED AMOUNT Rs.4000/- WITH SMT. ALKANANDA, PRESIDENT OF THE GROUP WHO FAILED TO REMIT THE AMOUNT IN THE BANK IN TIME - NOW, THE CONCERNED ARE STATING THAT THE LAST DATE FOR REMITTING IS OVER AND SHE IS NOT ELIGIBLE FOR ANY ASSISTANCE - KINDLY ENQUIRE INTO THE MATTER AND DO JUSTICE TO MY MOTHER.

THE P.D. (DRDA) HAD REPORTED THAT THE NAME OF SMT. LAXMI BAI IS INCLUDED IN ABAYAHASTAM PROGRAMME AND SHE WOULD BE GIVEN PENSION FROM 1ST DECEMBER 2009 ONWARDS.

16/11/2009

2844.

UMESH

PERKIT (V)

ARMOOR (M)

THE PERKIT BUS STAND IS EXISTING ON N.H.-7 AND 16 - DUE TO LAYING OF FOUR LANE ROAD THE N.H.A.I. HAVE GIVEN MARKING OF 100 FEET ROAD - WHEN WE HAVE APPROACHED FOR PERMISSION THE G.P. REFUSED TO ACCORD PERMISSION UNLESS SET BACK OF 50 FEET FROM THE CENTRE OF THE ROAD IS LEFT, WHEREAS THE SARPANCH HAS ACCORDED PERMISSION TO ONE SRI RAJ KUMAR S/o VITTAL BY ALLOWING IN TOTAL 68 FEET ROAD THAT IS 34 FEET FROM CENTRE OF THE ROAD THUS ALLOWED ENCROACHMENT AND CONSTRUCTION OF HOUSE ON 16 FEET HIGH WAY ROAD - WE HAVE COMPLAINED TO THE D.P.O. AT NIZAMABAD WHO ADVISED US TO SETTLE THE ISSUE AT G.P. LEVEL ONLY - SINCE, SARPANCH HIM SELF HAD ACCORDED ILLEGAL PERMISSION IT CAN NOT BE SOLVED AT G.P. LEVEL - KINDLY INTERVENE AND TAKE NECESSARY ACTION.

THE D.P.O. HAD REPORTED THAT THE CALLER SRI UMESH WAS NOT AVAILABLE IN THE VILLAGE AND THE CELL FROM WHICH HE CALLED BELONGS TO ONE SRI RAFEEQ S/o HYDER. HOWEVER, THE PERMISSION TO GRANTED SRI RAJ KUMAR WAS VERIFIED AND FOUND THAT G.P. HAD PASSED RESOLUTION TO ACCORDED PERMISSION FOR CONSTRUCTION ONLY AFTER RECEIVING CERTIFICATION FROM N.H.-16 AUTHORITIES. THE COMPLAINT MADE IS BASELESS.

16/11/2009

2845.

SUDARSHAN

AILAPUR (V)

NANDIPET (M)

EARLIER D.Y.C. IDNO.2784, DATED 03.08.2009 - IN OUR VILLAGE UNDER SS-7, 63 KV TRANSFORMER THERE ARE 22 AUTHORISED BORE WELLS WITH MOTORS - DUE TO OVER LOAD THE TRANSFORMER IS FAILING FREQUENTLY AND DUE TO LACK OF POWER SUPPLY WE HAVE NOT TAKEN UP TRANSPLANTATION OF PADDY IN KHARIF SEASON - THE N.P.D.C.L. AUTHORITIES HAVE INSPECTED THE TRANSFORMER AND OBSERVED OVER LOAD AND INFORMED THAT ANOTHER TRANSFORMER WOULD BE PROVIDED AFTER OBTAINING SANCTION - EVEN AFTER LAPS OF FOUR MONTHS THE PROBLEM IS NOT SOLVED - WE MAY HAVE TO KEEP OUR LANDS FALLOW EVEN DURING RABI SEASON ALSO IF TRANSFORMER IS NOT PROVIDED  - KINDLY INTERVENE AND INSTRUCT CONCERNED TO ARRANGE ANOTHER TRANSFORMER AT LEAST TO TAKE UP RABI CROP - EARLY ACTION IS REQUESTED.

THE S.E. (NPDCL) HAD REPORTED THAT S.S.-7, 63 KVA AILAPUR VILLAGE OF NANDIPET MANDAL WAS INSPECTED AND FOUND THAT 24 NUMBERS OF AGRICULTURAL SERVICES ARE RUNNING ON THIS TRANSFORMER. THIS LOCATION WAS NOT INCLUDED IN THE OVER LOADED PRIORITY LIST. EXPLANATION OF THE ADDL. ASST. ENGINEER, OPERATIONS, NANDIPET HAS BEEN CALLED FOR. HOWEVER, ESTIMATE WAS PREPARED FOR PROVIDING 3 x 25 K.V.A. DTR AND GOT APPROVAL FROM CHIEF ENGINEER. AND WORK WOULD BE TAKEN UP AS EARLY AS POSSIBLE.

16/11/2009

2846.

MASANI CHANDRA SHEKAR REDDY

BANSWADA (V&M)

SY.NO. 337/2 A SITUATED AT BANSWADA TOWN IS A PATTA LAND AND IT WAS REGISTERED IN THE YEAR 1992 ON SQUARE YARD BASIS - NOW MD. MOULANA IS TAKING UP CONSTRUCTION OF FUNCTION HALL IN THIS LAND - SINCE THIS IS AN AGRICULTURAL LAND PROPOSALS WERE SUBMITTED TO THE R.D.O., BODHAN FOR CONVERSION INTO NON-AGRICULTURAL PURPOSE BY SHOWING LESSER VALUE TAKING 0.21 GTS. AS THE AREA - THUS, THERE IS LOSS OF REVENUE TO THE GOVT. DUE TO WRONG REPORTING BY THE TAHSILDAR, BANSWADA.

 

FURTHER, SRI MOULANA HAD APPLIED FOR PERMISSION IN THE NAME OF A DEAD PERSON AND ACCORDINGLY PERMISSION GRANTED BY THE G.P. - KINDLY ENQUIRE INTO THE MATTER AND TAKE UP APPROPRIATE ACTION.

THE TAHSILDAR, BANSWADA HAD REPORTED THAT SIX PERSONS ARE JOINT PATTEDARS OF SY.NO.337/2A EXTENT 0.21 ACRES. THEY HAVE APPLIED FOR CONVERSION OF AGRICULTURAL LAND INTO NON-AGRICULTURAL PURPOSE. AS PER THE VALUATION CERTIFICATE ISSUED BY THE SUB-REGISTER AND AFTER REMITTING 10% OF THE VALUE PROPOSAL WAS SUBMITTED TO R.D.O., BODHAN AS PER PROCEDURE LAID DOWN IN THE A.P. LAND (CONVERSION FOR NON-AGRICULTURE LAND) PURPOSE ACT 2006.

 

THE D.P.O. HAD REPORTED THAT CONSTRUCTION OF FUNCTION HALL PERMISSION WAS GRANTED TO SRI M.D.MOULANA AND 5 OTHERS BY THE PANCHAYAT SECRETARY AS PER THE APPROVAL GIVEN BY THE DIRECTOR OF TOWN & COUNTRY PLANNING, HYDERABAD.

16/11/2009

2847.

MAHENDER KUMAR

BANJAPALLI (V)

NIZAMSAGAR (M)

IN SY.NO. 602 OF BANJAPALLI VILLAGE THERE IS A GRAVE YARD FOR USE OF VILLAGERS - THIS LAND IS LOCATED IN ACHAMPET SHIVAR - THE TAHSILDAR HAD ISSUED PATTA CERTIFICATE IN FAVOUR OF DUBBAK NARSAIAH S/o GOURAIAH AND HE HAS STARTED PLOUGHING THE GRAVE YARD LAND - WE HAVE FILED COMPLAINT DURING REVENUE SADASSULU BUT SO FAR NO ACTION IS TAKEN - KINDLY ENQUIRE, CANCEL THE PATTA CERTIFICATE AND RESTORE IT AS GRAVE YARD.

THE TAHSILDAR, NIZAMSAGAR HAD REPORTED THAT SY.NO.602 IS HAVING 2.22 ACRES. OUT OF THIS 1.00 ACRE WAS ASSIGNED TO SRI DUBBAKA NARSAIAH S/o GOURAIAH R/o BANDAPALLI VILLAGE SOME 15 YEARS BACK AND P.P.B. & T.D. WAS ISSUED. REMAINING 1.22 ACRES IS GOVT. KHARIJ KATA (K.K.) LAND. SINCE SOME GRAVES ARE EXISTING ON THIS LAND, THE SAME WAS NOT ASSIGNED TO ANY INDIVIDUAL.

16/11/2009

2848.

SUMEER AHMED

ARMOOR (V&M)

DISTRICT MINORITY WELFARE OFFICE IS LOCATED IN GOVT. BUILDING AT AHMEDI BAZAR WHICH IS A MINORITIES AREA - WHEREAS A.P.S. MINORITIES FINANCE CORPORATION IS LOCATED AT THE OTHER END AT SUBASHNAGAR THAT IS ABOUT 5 K.Ms. - SINCE, BOTH THE OFFICES ARE INTER LINKED AND SINCE SUFFICIENT ACCOMMODATION IS AVAILABLE AT MINORITY WELFARE OFFICE KINDLY ARRANGE SHIFTING OF A.P.S.M.F.C. TO SAME LOCATION  WHERE D.M.W.O OFFICE IS LOCATED FOR THE CONVENIENCE OF MINORITIES.

THE E.D. (APSMFC) HAD REPORTED THAT DIST. MINORITIES WELFARE OFFICE IS LOCATED IN THE PREMISES OF POST METRIC HOSTEL FOR BOYS WHICH IS LOCATED IN A PRIVATE BUILDING. AT AHMEDI BAZAR THERE IS NO SUFFICIENT ACCOMMODATION TO ACCOMMODATE A.P.S.M.F.C. LTD. SIMILARLY, THERE IS NO SUFFICIENT ACCOMMODATION AT A.P.S.M.F.C. LTD., WHICH IS ALSO LOCATED IN PRIVATE BUILDING AT SUBASHNAGAR TO ACCOMMODATE D.M.W.O. OFFICE. THE DISTANCE BETWEEN THESE 2 OFFICES IS BELOW 2.5 KMs.

16/11/2009

2849.

A.VENKATESHAM

Z.P.H.S., HEAD MASTER

YELLAREDDY (V&M)

IN OUR SCHOOL THERE IS ONE BORE WELL SUPPLYING DRINKING WATER TO THE STUDENTS AND ALSO FOR MID-DAY-MEALS - THE BORE IS VERY OLD AND THE PIPES ARE RUSTED AND MUDDY WATER IS COMING - DURING THE MONTH OF JULY THE DIST. COLLECTOR HAD VISITED OUR SCHOOL FOR INAUGURATION OF COMPUTER WING AND THIS ISSUE WAS BROUGHT TO THE NOTICE OF THE HON'BLE COLLECTOR - THE COLLECTOR ADVISED TO CONTACT R.W.S. AUTHORITIES AND ACCORDINGLY I HAVE CONTACTED THE LOCAL R.W.S. AUTHORITIES AT LEAST 20 TIMES BUT THERE IS NO RESPONSE - KINDLY INTERVENE AND GET THE BORE WELL REPAIRED TO AVOID INCONVENIENCE TO THE STUDENTS AND IN PROVIDING MID-DAY-MEALS.

THE S.E. (RWS) HAD REPORTED THAT ALREADY A PROPOSAL IS SUBMITTED FOR PROVIDING ONE BORE WELL WITH 1 H.P. SINGLE PHASE MOTOR AND 2500 LITRES CAPACITY CISTERN WITH AN ESTIMATED COST OF Rs.1.00 LAKH. SANCTION IS PENDING WITH P.D. (DRDA).

07/12/2009

2850.

KANNE MALLAIAH

RUDRUR (V)

VARNI (M)

MY SON NAMELY KANNE NARAYANA DIED IN ROAD ACCIDENT IN THE MONTH OF DECEMBER 2008  - HIS WIFE SMT. JYOTHI HAD SUBMITTED ALL DOCUMENTS TO THE COLLECTOR THROUGH M.R.O., VARNI - BUT SO FAR FINANCIAL ASSISTANCE UNDER APATHBANDU SCHEME IS NOT RECEIVED - WE ARE SUFFERING FOR THE PAST ONE YEAR DUE TO LOSS OF EARNING MEMBER - KINDLY ARRANGE FOR EARLY SANCTION.

THE DIST. REVENUE OFFICER HAD REPORTED THAT PROPOSAL FOR SANCTION OF RELIEF UNDER APATHBANDU SCHEME IN FAVOUR OF SMT. KANNE JYOTHI W/o LATE NARAYANA R/o RUDRUR VILLAGE WAS ALREADY SUBMITTED VIDE FILE NO. D4/505/2009-11, DATED 17.06.2009 TO M/s STAR HEALTH AND ALLIED INSURANCE COMPANY LTD., HYDERABAD AND FURTHER INFORMATION WAS ALSO FURNISHED ON 13.10.2009 AS SOON AS SANCTION IS RECEIVED THE SAME WOULD BE DISBURSED TO THE BENEFICIARY.

07/12/2009

2851.

GANGADHAR

NANDIPET (V&M)

EARLIER D.Y.C. IDNO 2821, DATED 19.10.2009 - THE POST OF G.P.P.S. IS VACANT AND ONE SRI RAGHURAM OF MANIKBANDAR VILLAGE IS KEPT INCHARGE - ON OUR EARLIER COMPLAINT DATED 19.10.2009 THE D.P.O. ASSURED THAT THE INCHARGE G.P.P.S. WOULD VISIT NANDIPET WHICH IS MANDAL HEADQUARTERS ATLEAST 3 DAYS IN A WEEK - BUT THE INCHARGE G.P.P.S. NOT AT ALL COMING TO NANDIPET CAUSING UNDUE HARDSHIP TO THE RESIDENTS OF NANDIPET - KINDLY POST A REGULAR G.P.P.S. OR GIVE SPECIFIC DAYS ON WHICH HE WOULD VISIT NANDIPET TO GET OUR WORKS DONE - EARLY ACTION IS REQUESTED.

THE D.P.O. HAD REPORTED THAT OUT OF 74 NOTIFIED GRAMA PANCHAYATS 50% OF THE POSTS I.E. 37 POSTS OF PANCHAYAT SECRETARIES ARE VACANT. COMMISSIONER FOR PANCHAYAT RAJ AND RURAL EMPLOYMENT, HYDERABAD, WOULD FILL THESE VACANCIES ONLY. THEREFORE, IN-CHARGE ARRANGEMENTS ARE MADE TILL COMMISSIONER, PR&RE, ALLOTS SELECTED CANDIDATES. INSTRUCTIONS WERE ISSUE TO THE IN-CHARGE P.S. TO ATTEND IN-CHARGE VILLAGE AT LEAST THREE DAYS IN A WEEK.

 

HOWEVER, SINCE COMPLAINTS ARE BEING RECEIVED REGULARLY THE ATTENDANCE REGISTER IS CALLED FOR AND FURTHER ACTION WOULD BE TAKEN BASING ON THE ATTENDANCE MARKED.

07/12/2009

2852.

JILLA BALAIAH

REDDYPET (V)

MACHAREDDY (M)

REDDYPET VILLAGE IN MACHAREDDY MANDAL IS ONE OF THE ADVERSELY DROUGHT AFFECTED VILLAGE - NO WORKS ARE TAKEN UP UNDER N.R.E.G.S. FOR THE PAST FOUR MONTHS LABOUR ARE FACING LOT OF INCONVENIENCE - FURTHER, WAGES TO THE WORK DONE FOUR MONTHS BACK IS ALSO NOT PAID - KINDLY ARRANGE FOR IMMEDIATE PAYMENT AND ALSO PROVIDE WORK TO ALL JOB CARD HOLDERS ON PRIORITY BASIS.

THE P.D. (DWMA) HAD REPORTED THAT FOUR WORKS ARE TAKEN UP IN THE VILLAGE FROM 04.10.2009 ONWARDS. IN ALL 1,109 LABOUR HAVE WORKED AND WAGES PAID.

07/12/2009

2853.

PITLA BALU

BALKONDA (V&M)

I AM A DISABLED PERSON AND WORKED AS WATCHMAN AT ELECTRICITY SUB-STATION, VANNEL (K) - SRI BAGA REDDY IS THE CONTRACTOR FOR MAINTENANCE OF THIS SUB-STATION - I HAVE WORKED FOR THE PAST THREE YEARS AND WHEN MY SALARY IS NOT BEING PAID PROPERLY AND AMOUNT NOT REMITTED IN P.F. ACCOUNT I HAVE FILED COMPLAINT IN D.Y.C. - AS PER THE INSTRUCTIONS OF THE DISTRICT ADMINISTRATION HE HAD PAID MY SALARY, BUT GIVEN WRONG P.F. ACCOUNT NO. - FURTHER MY SERVICES ARE TERMINATED THREE MONTHS AGO AND AT PRESENT I AM WITHOUT JOB - SINCE, I AM PHYSICALLY HANDICAPPED PERSON KINDLY INSTRUCT THE N.P.D.C.L. AUTHORITIES TO REGULARISE MY SERVICE AND PROVIDE ME WITH CORRECT P.F. ACCOUNT NUMBER.

THE S.E. (NPDCL) HAD REPORTED THAT THE CALLER HAD WORKED AS WATCHMAN AT VANNEL-B SUB-STATION UNDER CONTROL OF SRI BAGAREDDY CONTRACTOR UPTO 30.06.2008 AND SALARY WAS PROMPTLY PAID UPTO 30.06.2008 WITH E.P.F. ACCOUNT NO.AP/38148/79. SINCE HE WAS ABSENT FROM DUTIES ANOTHER WATCHMAN WAS APPOINTED IN PLACE THE CALLER. THEREFORE, THERE IS NO VACANCY TO CONSIDER HIS REAPPOINTMENT.

07/12/2009

2854.

KRISHNA VENI

KAMAREDDY (V&M)

I AM HAVING A PLOT MEASURING 240 SQ.YARDS AT KAMAREDDY - OUR ADJACENT LAND OWNER IS CONSTRUCTING HOUSE CONNECTING OUR COMPOUND WALL AGAINST MUNICIPAL PERMISSION AND WITHOUT LEAVING 5 FEET SPACE - I HAVE FILED COMPLAINT BEFORE MUNICIPAL COMMISSIONER, KAMAREDDY BUT DUE TO INVOLVEMENT OF MUNICIPAL COUNCILLOR NO ACTION IS TAKEN TO STOP UNAUTHORISED CONSTRUCTION - KINDLY INTERVENE AND TAKE NECESSARY ACTION. 

THE COMMISSIONER, M.C., KAMAREDDY HAD REPORTED THAT PERMISSION WAS GRANTED TO SMT. B.LAXMINARSAVVA AND SURESH VIDE PROC.NO.G1/174/MCK/520/2009, BY LEAVING 3 FEET SPACE BETWEEN HOUSE OF B.LAXMAVVA AND THE CALLER KRISHNA VENI. HOWEVER, B.LAXMI NARSAVVA COMMENCE CONSTRUCTION OF R.C.C. BUILDING WITHOUT LEAVING REQUIRED SET BACK, WHICH IS AGAINST THE SANCTIONED PLAN. THIS OFFICE AS TAKEN ACTION ON THE COMPLAINT FILED BY THE CALLER AND STOP THE DEVIATION CONSTRUCTION WORK.

07/12/2009

2855.

RAMULU

PENTA KURD (V)

BODHAN (M)

IN OUR VILLAGE THERE IS A Z.P. HIGH SCHOOL AND GOVT. HAVE PROVIDED COMPUTERS OTHER VALUABLE ITEMS - THE POST OF NIGHT WATCHMEN IS VACANT FOR THE PAST TWO YEARS - SOME MISCREANTS ARE TRYING TO DAMAGE DOORS, WINDOW PANES DURING NIGHT TIMES - KINDLY ARRANGE FILLING UP OF NIGHT WATCHMEN POST IMMEDIATELY - ALSO ARRANGE FOR LAYING OF ROAD BEHIND SCHOOL WHICH IS IN BAD SHAPE.

THE C.E.O. (ZP) HAD REPORTED THAT SINCE THERE IS A BAN ON APPOINTMENTS AS PER ACT 2 OF 1994 THE REQUEST OF THE CALLER CAN NOT BE CONSIDER AT PRESENT.

21/12/2009

2856.

SATYANARAYNA     

NIZAMABAD (V)

NIZAMABAD (M)

MY FATHER SERVED IN ARMY AND AFTER HIS RETIREMENT HE WAS ASSIGNED 1.00 ACRE OF LAND N SY.O.183/22 AT KALUR VILLAGE (CHINTALA KUNTA) OF NIZAMABAD MANDAL - WE ARE IN POSSESSION OF THIS LAND FOR THE PAST 40 YEARS - 2 YEARS BACK THE VILLAGE DEVELOPMENT COMMITTEE MEMBERS HAVE FORCIBLY TRIED TO OCCUPY THIS LAND - I HAVE FILED A CASE IN THE COURT AND IT IS PENDING TRAIL - NOW THE V.D.C. MEMBERS ARE THREATENING US WITH DIRE CONSEQUENCES IF CASE IS NOT WITHDRAWN - I HAVE FILED COMPLAINT WITH S.P. WHO INFORMED THAT NO ACTION CAN BE TAKEN IN CIVIL MATTER TILL THE CASE IS DISPOSED - KINDLY INTERFERE AND INSTRUCT THE R.D.O., NIZAMABAD TO BIND OVER THE V.D.C. MEMBERS WITH INSTRUCTIONS, NOT TO INTERFERE WITH OUR PEACEFUL POSSESSION. 

 

21/12/2009

2857.

SUMEER AHMED

ARMOOR (V&M)

IN ARMOOR PROPER DURING THE COURSE OF RATION CARD VERIFICATION CARDS OF ELIGIBLE BENEFICIARIES WHOSE DOORS WERE LOCKED WERE DELETED - NEARLY 200 ELIGIBLE POOR BENEFICIARIES DID NOT GET RATION FOR THE MONTH OF DECEMBER FOR THIS IRREGULAR DELETION - KINDLY ORDER FOR RE-ENQUIRY AND ARRANGE TO ISSUE RATION TO ALL THE ELIGIBLE BENEFICIARIES WITHOUT DELETING THEIR CARDS.

THE D.S.O. HAD REPORTED THAT THE TAHSILDAR, ARMOOR HAD CONDUCTED ENQUIRY ON THE APPLICATIONS SUBMITTED BY NEARLY 200 CARD HOLDERS WHOSE CARDS WERE DELETED FOR VARIOUS REASONS AND RESTORED ALL THE ELIGIBLE CARDS AFTER THROUGH VERIFICATION. ESSENTIAL COMMODITIES WOULD BE SUPPLIED AFTER PERMISSION IS ACCORDED BY THE COLLECTOR (CS).

21/12/2009

2858.

RACHAPPA

OLD VARNI (V)

VARNI (M)

IN OUR VILLAGE ADJACENT FARMERS OF KUNTA CHERUVU ARE ILLEGALLY ENCROACHING THE SHIKAM LAND RESULTING INCONVENIENCE TO AYACUT FARMERS - KINDLY ARRANGE FOR SURVEY AND EVICTION OF ENCROACHERS.

 

MY WIFE IS MEMBER IN S.H.G. GROUP AND DID NOT GET BRIDGE LOAN EVEN AFTER TEN MONTHS - KINDLY ARRANGE FOR SANCTION OF BRIDGE LOAN AS EARLY AS POSSIBLE.

THE TAHSILDAR, VARNI HAD REPORTED THAT HE HAD VISITED THE SITE ALONG WITH R.I. AND SURVEYOR. MALKAPURAM KUNTA IS LOCATED IN SY.NO.298 WITH 11.01 ACRES AS ITS TANK BED. ADJOINING PATTEDARS HAVE RAISED PADDY CROP AND AS SUCH REQUESTED TO TAKE UP SURVEY AFTER PADDY CROP IS HARVESTED. THE TAHSILDAR, VARNI HAD FURTHER REPORTED ALREADY A TRENCH WAS CUT ON THE BORDER OF TANK BED BUT AT SOME PLACES THE TRENCH WAS DISMANTLED AND PADDY CROP RAISED. IMMEDIATELY AFTER HARVESTING OF CROP SURVEY WOULD BE TAKEN UP AND FURTHER ACTION TAKEN.

 

THE P.D.(DRDA) HAD REPORTED THAT SMT. MADHAVI W/O RACHAPPA R/O OLD VARNI IS A MEMBER IN SHG JUST FOR 8 MONTHS ONLY.  SHE IS NOT ELIGIBLE FOR INDIRAMMA BRIDGE LOAN. SHE HAS ALREADY TAKEN RS. FIFTY THOUSAND UNDER NORMAL LINKAGE IN SEPTEMBER, 2009. SHE WOULD BE SANCTIONED INDIRAMMA BRIDGE LOAN IN THE LAST WEEK OF FEBRUARY, 2010.

21/12/2009

2859.

RAVI

AMDAPUR (V)

BODHAN (M)

MY WIFE NAMELY SMT. HEMALATHA, WORKED AS E.C.E.  TEACHER AT AMDAPUR VILLAGE DURING LAST YEAR AS PER ORDERS OF THE M.E.O. - BUT, SO FAR SALARY IS NOT PAID - WHEN ENQUIRED IN RAJIV VIDYA MISSION OFFICE IT WAS INFORMED THAT NO POST IS SANCTIONED IN THIS SCHOOL LAST YEAR AND AS SUCH SALARY CANNOT BE PAID - KINDLY VERIFY THE DETAILS AND ARRANGE FOR IMMEDIATE PAYMENT OF SALARY FOR THE YEAR 2008-09.

THE P.O.(RVM-SSA) HAD REPORTED THAT AT AMDAPUR VILLAGE ANGANWADI SCHOOL IS FUNCTIONING. AS SUCH OPENING OF E.C.E. IS NOT POSSIBLE AND AS SUCH NO E.C.E. CENTRE WAS SANCTIONED BY THE DIST. COLLECTOR DURING THE YEAR 2008-09. THERE IS NO PROPOSAL EITHER FROM M.E.O., BODHAN FOR SANCTION OF E.C.E. CENTRE AT AMDAPUR VILLAGE OF BODHAN MANDAL. IN VIEW OF THE ABOVE FACTS THE QUESTION OF HIS WIFE WORKING AT E.C.E. CENTRE AMDAPUR AND PAYMENT OF SALARY FOR THE YEAR 2008-09 DOES NOT ARISE. THE CALLER WAS INFORMED ACCORDINGLY.

21/12/2009

2860.

NARSIMLOO

REDDYPET (V)

MACHAREDDY (M)

AROUND 50 LABOUR HAVE FILED APPLICATIONS ALONGWITH PHOTOS WITH FIELD ASSISTANT SOME 4 MONTHS BACK FOR ISSUE OF JOB CARDS - BUT SO FAR JOB CARDS ARE NOT ISSUED - NOW WE ARE NOT ALLOWED TO WORK UNDER N.R.E.G.S. PROGRAMME WITHOUT JOB CARDS - KINDLY ENQUIRE INTO THE MATTER AND ARRANGE FOR ISSUE OF JOB CARDS IMMEDIATELY AND PROVIDE US WORK UNDER N.R.E.G.S.

THE P.D. (DWMA) HAD REPORTED THAT ALL THE LABOUR WHO HAVE APPLIED FOR JOB CARDS WERE ISSUED WITH JOB CARDS. AND ALL THE LABOUR WITH JOB CARDS ARE BEING PROVIDED EMPLOYMENT WHENEVER THEY COME FOR JOB. THE COMPLAINT MADE BY THE CALLER IS NOT GENUINE.

21/12/2009

2861.

GANGARAM MADUR

VELUTLA (V)

YELLAREDDY (M)

I AM A VERY POOR PERSON AND BELONG TO S.C. COMMUNITY - I AM NOT HAVING ANY LAND - SIMILARLY, THERE ARE SOME MORE S.Cs. WITHOUT LAND - I REQUEST KINDLY TO ARRANGE FOR ALLOTMENT OF 2.00 ACRES OF LAND EACH UNDER LAND PURCHASE SCHEME OR ASSIGN GOVT. LAND WHICH IS AVAILABLE FOR OUR SURVIVAL.

THE E.D. (S.C. CORPORATION) HAD REPORTED THAT THE CALLER HAD STATED THAT GOVT. LAND IS AVAILABLE AND REQUESTED FOR ALLOTMENT AND IN CASE IT IS NOT POSSIBLE TO ALLOT LAND BY PURCHASING UNDER LAND PURCHASE SCHEME. THE TAHSILDAR, YELLAREDDY WAS ADDRESSED FOR ENQUIRY AND SUBMISSION OF DETAILED REPORT REGARDING AVAILABILITY OF LAND. AS SOON AS TAHSILDAR REPORT IS RECEIVED FURTHER ACTION WOULD BE TAKEN.

21/12/2009

2862.

MALLA SAILOO

TADBILOLI (V)

RENJAL (M)

IN 1996 N.S.F LANDS WERE ALLOTTED BY S.C. CORPORATION UNDER LAND PURCHASE SCHEME - IN 1999 VIDE LR.NO.A4/1153/MI/99 BORE WELLS WERE SANCTIONED - BUT SO FAR NO MOTOR IS GIVEN, WHEN I APPROACHED THE S.C. CORPORATION AUTHORITIES THEY HAVE INFORMED THAT MOTOR WOULD BE GIVEN SHORTLY BUT NOT YET SANCTIONED - KINDLY VERIFY OUR REQUEST AND ARRANGE FOR EARLY SANCTION.

THE E.D. (S.C. CORPORATION) HAD REPORTED THAT THE CALLER WAS ALREADY ADVISED TO SUBMIT APPLICATION IN THE PRESCRIBED PROFORMA IN RESPONSE TO HIS REQUEST IN D.Y.C. HELD ON 15.09.2008. BUT HE FAILED TO FILE THE APPLICATION AND AGAIN CALLED ON 21.12.2009. HE WAS AGAIN ADVISED ON 23.12.2009 TO FILE THE APPLICATION IN THE PRESCRIBED PROFORMA THROUGH THE M.P.D.O., RENJAL. HE WAS ALSO REMINDED ON 31.12.2009. HE ASSURED TO FILED APPLICATION WITHIN A WEEK. AS SOON AS APPLICATION IS RECEIVED FURTHER ACTION WOULD BE TAKEN.

21/12/2009

2863.

KASIRAM

VELUTLA (V)

YELLAREDDY (M)

I HAVE APPLIED FOR ESTABLISHMENT OF XEROX CENTRE THROUGH S.C. CORPORATION WITH THE CONSENT OF MANAGER, ANDHRA BANK, VELUTLA BRANCH - AFTER SANCTION OF THIS SCHEME THE MANAGER IS REFUSING TO ADVANCE THE LOAN AND GROUND THE SCHEME - KINDLY ENQUIRE AND ARRANGE FOR IMMEDIATE RELEASE OF LOAN.

THE E.D. (S.C. CORPORATION) HAD REPORTED THAT THE APPLICATION OF THE CALLER WAS NOT RECEIVED IN S.C. CORPORATION AND AS SUCH SCHEME WAS NOT SANCTIONED. THE SAME WAS INFORMED TO THE CALLER OVER PHONE, ON 23.12.2009. THE CALLER HAD INFORMED THAT HIS APPLICATION WAS COMPLETED IN ALL ASPECTS THE JOINT IDENTIFICATION CAMP HELD ON 22.07.2009 ALONG WITH BANK CONSENT. HE WAS ADVISED TO VERIFY IN THE M.P.D.O. OFFICE TO KNOW WHETHER HIS APPLICATION WAS FORWARDED TO THE S.C. CORPORATION. THE M.P.D.O. IS ALSO INSTRUCTED TO VERIFY AND FORWARD THE APPLICATION FOR ACCORDING SANCTION AND GROUNDING THE SCHEME.